Sri Lanka: Integrated Road Investment Program-Tranche 3

Sovereign (Public) Project | 47273-005

Project Name Integrated Road Investment Program-Tranche 3
Project Number 47273-005
Country Sri Lanka
Project Status Active
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 3325-SRI: Integrated Road Investment Program-Tranche 3
Ordinary capital resources US$ 175.00 million
Loan 3326-SRI: Integrated Road Investment Program-Tranche 3
concessional ordinary capital resources lending / Asian Development Fund US$ 25.00 million
Strategic Agendas Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Private sector development
Sector / Subsector

Transport / Road transport (non-urban)

Gender Equity and Mainstreaming Effective gender mainstreaming
Description Tranche 3 will finance the second slice of projects in Southern Province, Sabaragamuwa Province, Kalutara District of Western Province, Central Province, North Central Province, and North Western Province. The first slice of projects was financed under Tranches 1 and 2.
Project Rationale and Linkage to Country/Regional Strategy The absence of all-weather road connectivity is a serious problem in Sri Lanka''s rural areas, preventing communities from accessing socioeconomic centers. Poor road infrastructure has a strong link to poverty and affects economic growth in rural areas, agricultural productivity, and employment. The Government of Sri Lanka is addressing this problem through a country-wide rural road investment program - aimed at providing all-weather road connectivity to eligible unconnected rural habitations. The Asian Development Bank's (ADB''s) interim country partnership strategy, 2015- 2016 for Sri Lanka aims to address the major constraints to sustaining inclusive growth and is closely aligned with the government's priorities. The country partnership strategy reconfirms continuing ADB assistance for developing the transport sector, particularly rural roads, which are critical for rural development in providing access to markets, health, education, and administrative services.
Impact connectivity between rural communities and socioeconomic centers in Sri Lanka improved by year 2027 (Annual Report, Ministry of Finance, Sri Lanka).
Project Outcome
Description of Outcome transport efficiency on project roads increased.
Progress Toward Outcome As of 31 January 2021, physical progress is 91.2%. The overall progress slowed down due to COVID -19. The impact of this event is being evaluated.
Implementation Progress
Description of Project Outputs

Road conditions between the selected rural communities and socioeconomic centers improved

Capacity of road agencies enhanced.

Status of Implementation Progress (Outputs, Activities, and Issues)

Contracts awarded to improve 3136 km of rural roads and 2657 km completed and Performance Based Maintenance is in progress.

77 km national road awarded and works are on-going. Procurement ongoing for award of 146 km national roads.

Likely to be achieved

Trainings are ongoing.

Endorsed.

Altogether 125 workshops, training and seminars were conducted. Out of this 58 are related to the capacity development of road agencies (RDA, PRDA and Local Authorities). Approximately 400 staff members benefited.

Geographical Location Central Province, North Central Province, North Western Province, Province of Sabaragamuwa, Southern Province, Western Province
Safeguard Categories
Environment B
Involuntary Resettlement B
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects Due diligence reports show that the project impacts are minimal as envisaged. No unanticipated environmental impacts are apparent from the implementation of Tranches 1 and 2.
Involuntary Resettlement Due diligence reports show that the project impacts are minimal as envisaged. No unanticipated involuntary resettlement impacts are apparent from the implementation of Tranches 1 and 2.
Indigenous Peoples Tranche 3 is classified as category C in indigenous peoples in accordance with ADB's SPS. All subprojects to be financed under Tranche 3 have already been fully appraised under Tranche 1 and 2.
Stakeholder Communication, Participation, and Consultation
During Project Design Meaningful consultation and social surveys were conducted along all project roads appraised under tranche 1 and 2, which included approximately 20% of households along project roads, and focus group discussions in public areas. The community participation was undertaken to increase awareness of the project, to determine people's needs and concerns, and obtain suggestions for enhancing benefits and mitigating negative impacts. For the rural road component, in-depth consultation took place, including by using community participatory approaches to finalize road designs, especially with respect to (i) improving road safety, (ii) minimizing environmental impact, and (iii) minimizing construction impact.
During Project Implementation tbd
Business Opportunities
Consulting Services There will be no procurement on consulting services under Tranche 3, all procurement on consulting services are being carried out under Tranches 1 and 2.
Procurement There will be no procurement on civil works under Tranche 3, all procurement on civil works are being carried out under Tranches 1 and 2.
Responsible ADB Officer Nanayakkara, Aruna Uddeeptha
Responsible ADB Department South Asia Department
Responsible ADB Division Sri Lanka Resident Mission
Executing Agencies
Ministry of Highways
Mr. W. A. Karumasena
[email protected]
Maganeguma Mahamedura,
8th Floor, Denzil Kobbekaduwa Mawatha,
Koswata,
Battaramulla, Sri Lanka
Timetable
Concept Clearance -
Fact Finding -
MRM 14 Sep 2015
Approval 23 Nov 2015
Last Review Mission -
Last PDS Update 16 Mar 2021

Loan 3325-SRI

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
23 Nov 2015 11 Dec 2015 18 Mar 2016 30 Sep 2021 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 198.88 Cumulative Contract Awards
ADB 175.00 07 Sep 2021 172.97 0.00 99%
Counterpart 23.88 Cumulative Disbursements
Cofinancing 0.00 07 Sep 2021 175.00 0.00 100%

Loan 3326-SRI

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
23 Nov 2015 11 Dec 2015 18 Mar 2016 30 Sep 2021 - 27 Mar 2017
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 25.00 Cumulative Contract Awards
ADB 25.00 07 Sep 2021 24.69 0.00 100%
Counterpart 0.00 Cumulative Disbursements
Cofinancing 0.00 07 Sep 2021 24.69 0.00 100%

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Integrated Road Investment Program - Tranches 1, 2, 3 and 4: Audited Project Financial Statements (January-December 2020) Audited Project Financial Statements Aug 2021
Integrated Road Investment Program - Tranches 2, 3 and 4: Economic Analysis for the Improvement, Rehabilitation and Maintenance of Kandy – Jaffna Road (A009) from Naula to Dambulla Documents Produced Under Grant/Loans/TA Dec 2020
Integrated Road Investment Program - Tranches 1, 2, 3 and 4: Audited Project Financial Statements (January-December 2019) Audited Project Financial Statements Nov 2020
Integrated Road Investment Program - Tranches 3-6: Updated Facility Administration Manual Facility Administration Manual Feb 2020
Integrated Road Investment Program - Tranches 1, 2, 3 and 4: Audited Project Financial Statements (January-December 2018) Audited Project Financial Statements Aug 2019
Integrated Road Investment Program - Tranches 1, 2, 3 and 4: Audited Project Financial Statements (January-December 2017) Audited Project Financial Statements Sep 2018
Integrated Road Investment Program – Tranches 1, 2, and 3: Audited Project Financial Statements (January-December 2017) Audited Project Financial Statements Jun 2018
Integrated Road Investment Program - Tranches 1-4: Updated Facility Administration Manual Facility Administration Manual Mar 2018
Integrated Road Investment Program - Tranches 1-4: Updated Facility Administration Manual Facility Administration Manual Oct 2017
Integrated Road Investment Program - Tranches 1-3: Audited Project Financial Statements (January-December 2016) Audited Project Financial Statements Jul 2017
Integrated Road Investment Program - Tranches 1-3: Audited Project Financial Statements (January-December 2015) Audited Project Financial Statements Aug 2016
Project Agreement for Loans 3325 and 3326-SRI: Integrated Road Investment Program - Tranche 3 Project/Program Agreements Jan 2016
Loan Agreement (Ordinary Operations) for Loan 3325-SRI: Integrated Road Investment Program - Tranche 3 Loan Agreement (Ordinary Resources) Dec 2015
Loan Agreement (Special Operations) for Loan 3326-SRI: Integrated Road Investment Program - Tranche 3 Loan Agreement (Special Operations) Dec 2015
Integrated Road Investment Program - Tranche 3: Periodic Financing Request Report Periodic Financing Request Reports Nov 2015
Integrated Road Investment Program - Tranche 3: Project Data Sheet (Sinhala Translation) Translated PDS Sep 2015
Integrated Road Investment Program - Tranche 3: Project Data Sheet (Tamil Translation) Translated PDS Sep 2015

Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Integrated Road Investment Program - Tranches 1, 2, 3 and 4: RMC - Southern and North Central Provinces Social Monitoring Report (January-June 2021) Social Monitoring Reports Jun 2021
Integrated Road Investment Program - Tranches 2, 3 & 4: PIC 02 - North Western and North Central Provinces Social Monitoring Report (January-June 2021) Social Monitoring Reports Jun 2021
Integrated Road Investment Program - Tranches 2, 3, and 4: PIC 02 - North Western and North Central Provinces Environmental Monitoring Report (January-December 2020) Environmental Monitoring Reports Dec 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: North Western and North Central Provinces Social Monitoring Report (July-December 2020) Social Monitoring Reports Dec 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: Sabaragamuwa, Central Provinces, and Kaluthara District Environmental and Social Monitoring Report (January-December 2020) Environmental and Social Monitoring Reports Dec 2020
Integrated Road Investment Program - Tranches 1, 3, and 4: PIC 01 - Southern Province Environmental and Social Monitoring Report (January-December 2020) Environmental and Social Monitoring Reports Dec 2020
Integrated Road Investment Program – Tranches 1, 2, 3 and 4: RMC – Southern and North Central Provinces Social Monitoring Report (July-December 2020) Social Monitoring Reports Dec 2020
Integrated Road Investment Program - Tranches 1, 2, 3, and 4: MC - Southern and North Central Provinces Environmental Monitoring Report (January-December 2020) Environmental Monitoring Reports Dec 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: Naula-Dambulla Section of Kandy-Jaffna (A009) Road Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Dec 2020
Integrated Road Investment Program - Tranches 2, 3, and 4: Improvement, Rehabilitation and Maintenance of Naula-Dambulla Section of Kandy-Jaffna (A009) RoadInitial Environmental Examination Initial Environmental Examination Dec 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: North Western and North Central Provinces Social Monitoring Report (January-June 2020) Social Monitoring Reports Jun 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: Sabaragamuwa, Central Provinces and Kaluthara District Social Monitoring Report (January-June 2020) Social Monitoring Reports Jun 2020
Integrated Road Investment Program – Tranches 1, 2, 3 and 4: RMC – Southern and North Central Provinces Social Monitoring Report (January-June 2020) Social Monitoring Reports Jun 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: Nittambuwa–Kadugannawa Section of Colombo–Kandy Highway Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Apr 2020
Integrated Road Investment Program - Tranches 2, 3, and 4: Improvement, Rehabilitation and Maintenance of Nittambuwa - Kadugannawa section of Colombo - Kandy (A001) Road Initial Environmental Examination Initial Environmental Examination Apr 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: Improvement, Rehabilitation and Maintenance of A003 Road from Kochchikade to Puttalam Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Mar 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: Improvement, Rehabilitation and Maintenance of A003 Road from Kochchikade to Puttalam Initial Environmental Examination Initial Environmental Examination Mar 2020
Integrated Road Investment Program – Tranches 1, 2, 3, and 4: MC – Southern and North Central Provinces Environmental Monitoring Report (April-December 2019) Environmental Monitoring Reports Jan 2020
Integrated Road Investment Program - Tranches 1-4: MC - Southern, North Central Province Social Monitoring Report (April-December 2019) Social Monitoring Reports Jan 2020
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 02 – North Western and North Central Provinces Environmental Monitoring Report (July-December 2019) Environmental Monitoring Reports Dec 2019
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 03 – Sabaragamuwa, Central Provinces, and Kaluthara District Environmental Monitoring Report (January-December 2019) Environmental Monitoring Reports Dec 2019
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 03 – Sabaragamuwa, Central Provinces, and Kaluthara District Social Monitoring Report (July-December 2019) Social Monitoring Reports Dec 2019
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 02 – North Western and North Central Provinces Social Monitoring Report (July-December 2019) Social Monitoring Reports Dec 2019
Integrated Road Investment Program – Tranches 1, 3, and 4: PIC 01 – Southern Province Environmental and Social Monitoring Report (January-December 2019) Environmental and Social Monitoring Reports Dec 2019
Integrated Road Investment Program – Tranches 1, 3, and 4: PIC 01 – Southern Province Social Monitoring Report (January-June 2019) Social Monitoring Reports Jun 2019
Integrated Road Investment Program - Tranches 2, 3, and 4: PIC 02 - North Western and North Central Provinces Social Monitoring Report (January-June 2019) Social Monitoring Reports Jun 2019
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 03 – Sabaragamuwa, Central Provinces, and Kaluthara District Social Monitoring Report (January-June 2019) Social Monitoring Reports Jun 2019
Integrated Road Investment Program - Tranches 2, 3, and 4: Selected Roads in Anuradhapura District, North Central Province Initial Environmental Examination Initial Environmental Examination Mar 2019
Integrated Road Investment Program - Tranche 2, 3, and 4: Pelmadulla-Embilipitiya-Nonagama (A018) Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Mar 2019
Integrated Road Investment Program - Tranches 2, 3, and 4: Pelmadulla-Padalangala Section of Pelmadulla-Embilipitiya-Nonagama (A018) Road Initial Environmental Examination Initial Environmental Examination Mar 2019
Integrated Road Investment Program - Tranche 2, 3, and 4: North Central Province Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Mar 2019
Integrated Road Investment Program - Tranches 1, 3 & 4: PIC 01 - Southern Province Environmental Monitoring Report (December 2018) Environmental Monitoring Reports Dec 2018
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 03 – Sabaragamuwa, Central Provinces, and Kaluthara District Environmental Monitoring Report (January-December 2018) Environmental Monitoring Reports Dec 2018
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 02 – North Western and North Central Provinces Environmental Monitoring Report (January-December 2018) Environmental Monitoring Reports Dec 2018
Integrated Road Investment Program – Tranches 1, 3, and 4: PIC 01 – Southern Province Social Monitoring Report (July-December 2018) Social Monitoring Reports Dec 2018
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 02 – North Western and North Central Provinces Social Monitoring Report (July-December 2018) Social Monitoring Reports Dec 2018
Integrated Road Investment Program – Tranches 2, 3, and 4: PIC 03 – Sabaragamuwa, Central Provinces, and Kaluthara District Social Monitoring Report (July-December 2018) Social Monitoring Reports Dec 2018
Integrated Road Investment Program - Tranches 2-4: PIC 03 Sabaragamuwa, Central Provinces and Kaluthara District Social Monitoring Report (January-June 2018) Social Monitoring Reports Jun 2018
Integrated Road Investment Program - Tranches 2-4: PIC 02 North Western and North Central Provinces Social Monitoring Report (January-June 2018) Social Monitoring Reports Jun 2018
Integrated Road Investment Program - Tranches 1-4: PIC 01 Southern Province Social Monitoring Report (January-June 2018) Social Monitoring Reports Jun 2018
Integrated Road Investment Program - Tranches 2 & 3: PIC 02 North Western and North Central Provinces Social Monitoring Report (June-December 2017) Social Monitoring Reports Mar 2018
Integrated Road Investment Program - Tranches 2 & 3: PIC 03 Sabaragamuwa, Central Provinces and Kaluthara District Social Monitoring Report (July-December 2017) Social Monitoring Reports Mar 2018
Integrated Road Investment Program - Tranches 2 & 3: PIC 03 Sabaragamuwa, Central Provinces and Kaluthara District Environmental Monitoring Report (January-December 2017) Environmental Monitoring Reports Mar 2018
Integrated Road Investment Program - Tranches 1-3: PIC 01 Southern Province Social Monitoring Report (July-December 2017) Social Monitoring Reports Dec 2017
Integrated Road Investment Program - Tranches 2 and 3: PIC 02 – North Western and North Central Provinces Environmental Monitoring Report (January-December 2017) Environmental Monitoring Reports Dec 2017
Integrated Road Investment Program - Tranches 1-3: Social Safeguards Due Diligence Report Safeguards Due Diligence Reports Sep 2017
Integrated Road Investment Program - Tranches 1-3: Environmental Due Diligence Report Safeguards Due Diligence Reports Sep 2017
Integrated Road Investment Program - Tranches 1-3: PIC 01 Southern Province Social Monitoring Report (January-June 2017) Social Monitoring Reports Jun 2017
Integrated Road Investment Program - Tranches 1-3: PIC 03 Sabaragamuwa, Central Provinces and Kaluthara District of Western Province Social Monitoring Report (January-June 2017) Social Monitoring Reports Jun 2017
Integrated Road Investment Program - Tranches 1-3: PIC 02 North Western and North Central Provinces Social Monitoring Report (January-June 2017) Social Monitoring Reports Jun 2017
Integrated Road Investment Program - Tranches 1-3: Sabaragamuwa, Central Provinces and Kaluthara District Environmental Monitoring Report (January-December 2016) Environmental Monitoring Reports Mar 2017
Integrated Road Investment Program - Tranches 1-3: Southern Province Environmental Monitoring Report (January-December 2016) Environmental Monitoring Reports Mar 2017
Integrated Road Investment Program - Tranches 1-3: Southern Province Social Monitoring Report (July-December 2016) Social Monitoring Reports Dec 2016
Integrated Road Investment Program - Tranches 1-3: North Western and North Central Provinces Environmental Monitoring Report (March-December 2016) Environmental Monitoring Reports Dec 2016
Integrated Road Investment Program - Tranches 1-3: North Western and North Central Provinces Social Monitoring Report (July-December 2016) Social Monitoring Reports Dec 2016
Integrated Road Investment Program - Tranches 1-3: Sabaragamuwa, Central Provinces and Kaluthara District of Western Province Social Monitoring Report (July-December 2016) Social Monitoring Reports Dec 2016
Integrated Road Investment Program - Project 2: Western Province Initial Environmental Examination Initial Environmental Examination Sep 2014
Integrated Road Investment Program - Project 2: North Central Province Initial Environmental Examination Initial Environmental Examination Sep 2014
Integrated Road Investment Program - Project 2: North Western Province Initial Environmental Examination Initial Environmental Examination Sep 2014
Integrated Road Investment Program - Project 2: Road Management Contract (RMC) Initial Environmental Examination Initial Environmental Examination Sep 2014
Integrated Road Investment Program - Project 2: Sabaragamuwa Initial Environmental Examination Initial Environmental Examination Sep 2014
Integrated Road Investment Program - Project 2: Central Province Initial Environmental Examination Initial Environmental Examination Sep 2014
Integrated Road Investment Program: North Western Province Rural Roads - Project 5 Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Aug 2014
Integrated Road Investment Program: Sabaragamuwa Province and Western Province Rural Roads - Project 2 Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Aug 2014
Integrated Road Investment Program: Central Province Rural Roads - Project 3 Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Aug 2014
Integrated Road Investment Program: National Roads for Project 2, 3 and 5 Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Aug 2014
Integrated Road Investment Program: North Central Province Rural Roads - Project 4 Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports Aug 2014
Integrated Road Investment Program-Tranche 1: Involuntary Resettlement Due Diligence Report Safeguards Due Diligence Reports May 2014
Integrated Road Investment Program-Tranche 1: Initial Environmental Examination Initial Environmental Examination May 2014

Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

No tenders for this project were found.


Contracts Awarded

Contract Title Approval Number Contract Date Contractor Contractor Address Executing Agency Contract Description Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
ROAD MANAGEMENT CONTRACT FOR REHABILITATION AND IMPROVEMENT WORKS & ROUTINE MAINTENANCE WORKS OF ALL ROAD FROM MARADANKADAWALA TO HABARANA Loan 3325 31 Aug 2020 CONSULTING ENGINEERS & CONTRACTORS (PVT) LTD 423, NAWALA ROAD RAJAGIRIYA SRI LANKA Ministry of Highways & Road Development and PRD CONSTRUCTION 16942435.62 2690196.92
REHABILITATION AND IMPROVEMENT, PERIODIC MAINTENAN -CE AND ROUTINE MAINTENANCE WORKS OF 51.7 KM OF NATIONAL ROADS IN GALLE DISTRICT Loan 3325 31 Aug 2020 KDAW - YCIH (JV) 8/16, THALAPATHPITIYA ROAD NUGEGODA SRI LANKA Ministry of Highways & Road Development and PRD CONSTRUCTION 32799228.72 2690196.92
INDIVIDUAL INTERNATIONAL CONSULTANT - ROAD ASSET MANAGEMENT SPECIALIST Loan 3325 25 Sep 2018 SATRA INFRASTRUCTURE MANAGEMENT SER. PVT LTD NO-1-16-108/G2, JJ NAG,RK GILL PLAZA SECUNDERABAD - 500 015, TELANGANA, INDIA INDIA Ministry of Highways and Road Development Consulting Services 300000 270000
MONITORING CONSULTANT (MC) FOR ROAD MANAGEMENT CONTRACTS (RMC) OF NATIONAL ROADS Loan 3325 30 Nov 2017 ORIENTAL CONSULTANTS GLOBAL CO., LTD (JAPAN) 3-20-2, NISHISHINJUKU, SHINJUKU-KU TOKYO, 163-1409, JAPAN JAPAN Ministry of Higher Education and Highways 5506770 293446
INDIVIDUAL INTERNATIONAL CONSULTANT CAPACITY DEVELOPMENT SPECIALIST Loan 3325 24 Oct 2017 MR. L. WELIKALA 13, EDMUND CIRCUIT, NORTH LAKES BRISBANE, QLD 4509, AUSTRALIA AUSTRALIA Ministry of Higher Education and Highways 160000 158400
PROJECT MANAGEMENT EXPENDITURE Loan 3325 17 Jul 2017 VARIOUS VARIOUS SRI LANKA Ministry of Higher Education and Highways Others 1302083 1302083
Rehabilitation/Improvements of 94KM of Rural Roads in the Kalutara District - Contract 3 Including Performance Based Maintenance for Three Years Loan 3325 03 Apr 2017 V.V. Karunaratne and Company No 579, Bulugaha Junction No 579, Bulugaha Junction Sri Lanka Ministry of Higher Education and Highways Construction 8154335.05 1586415.76
Rehabilitation/Improvements of 94 KM of Rural Roads in the Kalutara District - Contract 1 Including Performance Based Maintenance for 3 Years Loan 3325 03 Apr 2017 Ocpl-Rcpl Joint Venture No 445 1/2, Colombo Road Pepiliyana Sri Lanka Ministry of Higher Education and Highways Construction 11950237.91 2978161.558
Design, Supply and Installation of Area Load Dispatch Centre and Setting Up Ind. Meter Testing Laboratory (Package 4) Loan 3325 03 Apr 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 12572921.87 2506674.286
Rehabilitation/Improvements of 85 KM of Rural Roads in the Kurunegala District - Contract 1 Including Performance Based Maintenance for 3 Years Loan 3325 31 Mar 2017 Ranken Railway Construction Group Co.(Pvt)Ltd. 14F,Huiyuan Apartmentb,No8,North Star Rd Wuhou District,Chengdu,Sitchan Province China,People'Srep.O Ministry of Higher Education and Highways Construction 13137856.49 2631554.04
Rehabilitation/Improvements of 74 KM of Rural Roads in the Polonnaruwa District - Contract 2 Including Performance Based Maintenance for 3 Years Loan 3325 31 Mar 2017 V.V. Karunaratne and Company No 579, Bulugaha Junction Kandy Road, Kelaniya Sri Lanka Ministry of Higher Education and Highways Construction 9632936 1929507.426
Rehabilitation/Improvements of 81KM of Rural Roads in the Ratnapura District - Contract 3 Including Performance Based Maintenance for Three Years Loan 3325 31 Mar 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 13198592.37 2643719.629
Rehabilitation/Improvements of 84 KM of Rural Roads in the Anuradhapura District - Contract 3 Including Performance Based Maintenance for 3 Years Loan 3325 31 Mar 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 9763058.79 2933357.146
Rehabilitation/Improvements of 83KM of Rural Roads in the Ratnapura District - Contract 1 Including Performance Based Maintenance for Three Years Loan 3325 31 Mar 2017 R.R. Construction Pvt. Ltd. 865, Dr Danister De Silva Mawatha Colombo - 09 Sri Lanka Ministry of Higher Education and Highways Construction 13298653.27 3995643.212
Rehabilitation/Improvements of 76KM of Rural Roads in the Matale District - Contract 1 Including Performance Based Maintenance for Three Years Loan 3325 31 Mar 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 9822808.22 2459424.287
Rehabilitation/Improvements of 65KM of Rural Roads in the Nuwara Eliya District - Contract 3 Including Performance Based Maintenance for Three Years Loan 3325 31 Mar 2017 K.D Ebert and Sons Holdings Pvt. Ltd. 5/41 Madiwela Road Embuldeniya, Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 13305590.31 3997727.481
Rehabilitation/Improvements of 74KM of Rural Roads in the Kandy District - Contract 3 Including Performance Based Maintenance for Three Years Loan 3325 31 Mar 2017 V.V. Karunaratne and Company No 579, Bulugaha Junction Kandy Road, Kelaniya Sri Lanka Ministry of Higher Education and Highways Construction 13760443.11 2756260.103
Rehabilitation/Improvements of 83 KM of Rural Roads in the Anuradhapura District - Contract 1 Including Performance Based Maintenance for 3 Years Loan 3325 31 Mar 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 10759583.84 2155178.537
Rehabilitation/Improvements of 93 KM of Rural Roads in the Puttalam District - Contract 1 Including Performance Based Maintenance for 3 Years Loan 3325 31 Mar 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 10902913.48 2729859.893
Rehabilitation/Improvements of 77KM Rural Roads in the Kandy District - Contract 1 Including Performance Based Maintenance for Three Years Loan 3325 31 Mar 2017 Ranken Railway Construction Group Co. Ltd. 14F,Huiyuan Apartmentb,No8,North Star Rd Wuhou District,Chengdu,Sitchan Province China,People'Srep.O Ministry of Higher Education and Highways Construction 11228008.97 2811256.959
Rehabilitation/Improvements of 54 KM of Rural Roads in the Puttalam District - Contract 3 Including Performance Based Maintenance for 3 Years Loan 3325 31 Mar 2017 K.D. Ebert and Sons Holdings Pvt. Ltd. 5/41 Madiwela Road Embuldineya, Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 15687266.39 4713313.313
Rehabilitation of 56 KM of Rural Roads in the Matara District CP-RR (M3) RDA/ADB/IROAD (SP)/ICB/CP RR M3 Loan 3325 31 Mar 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 7623432.17 1526997.479
Rehabilitation/Improvements of 71KM of Rural Roads in the Kandy District - Contract 2 Including Performance Based Maintenance of Three Years Loan 3325 31 Mar 2017 Maga Engineering Pvt. Ltd. No. 200, Nawala Road Narahenpita, Colombo 05 Sri Lanka Ministry of Higher Education and Highways Construction 12003540.19 3005433.642
Rehabilitation/Improvements of 57KM of Rural Roads in the Matale District - Contract 2 Including Performance Bases Maintenance for Three Years Loan 3325 31 Mar 2017 Tissa - Amsk Joint Venture Kandalama Meerigama Sri Lanka Ministry of Higher Education and Highways Construction 8220987.43 2058362.1
Rehabilitation/Improvements of 104 KM of Rural Roads in the Kurunegala District - Contract 5 Including Performance Based Maintenance for 3 Years Loan 3325 31 Mar 2017 Ranken Railway Construction Group Co.(Pvt)Ltd. 14F,Huiyuan Apartmentb,No8,North Star Rd Wuhou District,Chengdu,Sitchan Province China,People'Srep.O Ministry of Higher Education and Highways Construction 13007316.69 2605406.508
Rehabilitation/Improvements of 73 KM of Rural Roads in the Puttalam District - Contract 2 Including Performance Based Maintenance for 3 Years Loan 3325 30 Mar 2017 M/S Cml - Mtd Construction Ltd. 155 Dharmapala Mawatha Colombo 07 Sri Lanka Ministry of Higher Education and Highways Construction 9268021.92 2319295.916
Rehabilitation/Improvements of 64KM of Rural Roads in the Kegalle District - Contract 3 Including Performance Based Maintenance for Three Years Loan 3325 30 Mar 2017 M/S K.D. Ebert and Sons Holdings Pvt. Ltd. 64/10 Nawala Road Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 10681225.82 2672946.141
Rehabilitation/Improvements of 97 KM of Rural RDA Roads in the Kurunegala District - Contract 4 Including Performance Based Maintenance for 3 Years Loan 3325 30 Mar 2017 M/S Sierra Construction Pvt. Ltd. 112 Havelock Road Colombo - 05 Sri Lanka Ministry of Higher Education and Highways Construction 13626253.09 4091916.928
Rehabilitation/Improvements of 88 KM of Rural Roads in the Anuradhapura District - Contract 4 Including Performance Based Maintenance for 3 Years Loan 3325 30 Mar 2017 Nawaloka Construction Company Pvt. Ltd. 115, Sir James Peris, Mawatha Colombo-02 Sri Lanka Ministry of Higher Education and Highways Construction 10747616.71 2689560.272
Rehabilitation/Improvements of 100KM of Rural Roads in the Kurunegala District - Contract 2 Including Performance Based Maintenance for Three Years Loan 3325 30 Mar 2017 M/S Edward and Christie 64/10 Nawala Road Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 13805187.38 4145650.278
Rehabilitation/Improvements of 92KM of Rural Roads in the Ratnapura District - Contract 2 Including Performance Based Maintenance for Three Years Loan 3325 30 Mar 2017 M/S Sierra Construction Pvt. Ltd. 122 Havelock Road Colombo - 05 Sri Lanka Ministry of Higher Education and Highways Construction 15128623.49 4543073.59
Rehabilitation/Improvements of 49 KM of Rural Roads in the Polonnaruwa District - Contract 1 Including Performance Based Maintenance for 3 Years Loan 3325 30 Mar 2017 K.D.A. Weerasinghe and Co. Pvt. Ltd. 8/16 Thalapathpitiya Road Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 975286.41 2932258.308
Rehabilitation/Improvements of 89 KM of Rural Roads in the Kalutara District - Contract 2 Including Performance Based Maintenance for Three Years Loan 3325 30 Mar 2017 M/S Sierra Construction Pvt. Ltd. 117 Havelock Road Colombo - 05 Sri Lanka Ministry of Higher Education and Highways Construction 11562842.19 2893568.11
Rehabilitation of 60 KM of Rural Roads in the Hambantota District CP-RR (H2) RDA/ADB/IROAD(SP)/ICB/CP/RR H2 Loan 3325 30 Mar 2017 Kd Ebert and Sons Holdings Pvt Ltd. 5/41, Madiwela Rd, Embuldeniya Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 7950489.04 2387504.509
Rehabilitation/Improvements of 77 KM of Rural Roads in the Anuraphapura District - Contract 2 Including Performance Based Maintenance for 3 Years Loan 3325 30 Mar 2017 Nawaloka Construction Co Pvt. Ltd. 115, Sir James Peris Mawatha Colombo - 02 Sri Lanka Ministry of Higher Education and Highways Construction 11962599.72 3592327.542
Rehabilitation/Improvements of 39KM of Rural Roads in the Nuwara Eliya District - Contract 2 Including Performance Based Maintenance for Three Years Loan 3325 30 Mar 2017 Cml Mtd Construction Ltd. 155, Dharmapala Mawatha Colombo Port Sri Lanka Ministry of Higher Education and Highways Construction 7968466.61 2392903.112
Rehabilitation/Improvements of 47 KM of Rural Roads in the Polonnaruwa District - Contract 3 Including Performance Based Maintenance for 3 Years Loan 3325 30 Mar 2017 M/S Sierra Construction Pvt. Ltd. 112 Havelock Road Colombo - 05 Sri Lanka Ministry of Higher Education and Highways Construction 8175122.19 2454961.071
Rehabilitation/Improvements of 75KM of Rural Roads in the Kegalle District - Contract 1 Including Performance Based Maintenance for Three Years Loan 3325 30 Mar 2017 M/S Sierra Construction Pvt. Ltd. 112 Havelock Road Colombo - 05 Sri Lanka Ministry of Higher Education and Highways Construction 12664913.72 3803230.021
Rehabilitation/Improvements of 99 KM of Rural Roads in the Kurunegala District - Contract 3 Including Performance Based Maintenance for 3 Years Loan 3325 30 Mar 2017 K.D. Ebert and Sons Holdings Pvt. Ltd. 5/41 Madiwela Road Embuldeniya, Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 12986544.79 3899814.727
Rehabilitation/Improvements of 62KM of Rural Roads in the Matale District - Contract 3 Including Performance Based Maintenance for Three Years Loan 3325 30 Mar 2017 M/S Edward and Christie 64/10 Nawala Road Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 8221916.53 2469013.25
Rehabilitation/Improvements of 77KM of Rural Roads in the Nuwara Eliya District - Contract 1 Including Performance Based Maintenance for Three Years Loan 3325 29 Mar 2017 Kdaw-Bmg JV No. 8/16, Thalapathpitiya Road Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 13997800.76 2799744.65
Rehabilitation/Improvements of 79 KM of Rural Roads in the Kegalle District - Contract 2 Including Performance Based Maintenance for Three Years Loan 3325 29 Mar 2017 Ocpl-Rcpl Joint Venture No 445 1/2, Colombo Road Peppiliyana, Boralesgamuwa Sri Lanka Ministry of Higher Education and Highways Construction 11936427.46 2387442.82
Rehabilitation of 63 KM of Rural Roads in the Galle District CP-RR (G2) Southern Province RDA/ADB/IROAD(SP)ICB CP RR G2 Loan 3325 31 Jan 2017 K.D.A. Weerasinghe and Co Pvt Ltd. 8/16 Thalapathpitiya Rd Nugegoda Sri Lanka Ministry of Higher Education and Highways Construction 11523239.6 3437137.392

Procurement Plan

None currently available.