Pakistan : Balochistan Water Resources Development Project
The proposed Balochistan Water Resources Development Project is located across six districts in Balochistan in the Zhob, Kacchi plain, Dasht and Hingol river basins. The project will improve land and water resources, agricultural production and farm income of 10,000 rural households by (i) bringing 10,000 ha of new land under cultivation; (ii) improving 20,000 ha of irrigated land; and (iii) protecting 1,500 ha of watersheds. The project will (a) construct new small dams and flood irrigation (spate) systems; (b) improve 300 km of canals, drains, and karezes (subsurface water channels); (c) develop a satellite-based water information system; and (d) build capacity of the local communities, the Irrigation and Power Department (IPD), and the Agriculture and Cooperative Department (ACD).
Project Details
-
Project Officer
Zhou, Yaozhou
Central and West Asia Department
Request for information -
Country/Economy
Pakistan -
Modality
-
Sector
- Agriculture, natural resources and rural development
Related Projects
- Project Name
- Balochistan Water Resources Development Project
- Project Number
- 48098-001
- Country / Economy
- Pakistan
- Project Status
- Closed
- Project Type / Modality of Assistance
- Technical Assistance
- Source of Funding / Amount
- Strategic Agendas
- Environmentally sustainable growth
- Inclusive economic growth
- Drivers of Change
- Gender Equity and Mainstreaming
- Governance and capacity development
- Knowledge solutions
- Partnerships
- Sector / Subsector
Agriculture, natural resources and rural development / Irrigation - Rural flood protection - Water-based natural resources management
- Gender
- Some gender elements
- Description
The proposed Balochistan Water Resources Development Project is located across six districts in Balochistan in the Zhob, Kacchi plain, Dasht and Hingol river basins. The project will improve land and water resources, agricultural production and farm income of 10,000 rural households by (i) bringing 10,000 ha of new land under cultivation; (ii) improving 20,000 ha of irrigated land; and (iii) protecting 1,500 ha of watersheds. The project will (a) construct new small dams and flood irrigation (spate) systems; (b) improve 300 km of canals, drains, and karezes (subsurface water channels); (c) develop a satellite-based water information system; and (d) build capacity of the local communities, the Irrigation and Power Department (IPD), and the Agriculture and Cooperative Department (ACD).
The project impact will be the increased farm income in the project area. The project outcome will be the increased agricultural production. The project outputs will be (i) improved land and water resource management; (ii) participating communities have better access to water for domestic uses; and (iii) improved capacity of the communities, IPD, and ACD in water management.
The main project components include works ($92 million), capacity building ($12 million), and project management ($11 million).
- Project Rationale and Linkage to Country/Regional Strategy
Pakistan has to increase food production by 40-50% to meet the needs of a projected population of 221 million by 2025. ADB's interim country partnership strategy (2014-2015) emphasizes revitalizing agriculture for food security and poverty alleviation. ADB's midterm review of Strategy 2020 recognizes infrastructure and agriculture as the main focus area and proposes a 10-point program on ADB strategic directions in 2014-2020. The country assistance program evaluation, 20022012 assessed Pakistan's agriculture and natural resource sector less than successful, but it evaluated the program relevant in terms of its alignment with government and ADB strategies, and satisfactory for its strategic positioning. The evaluation is viewed as appropriate in ADB's commitment to support Pakistan in responding to the need to rehabilitate and expand the irrigation system.
Of the 13 million Balochistan population, over 70% live in rural areas and depend on agriculture for their livelihood. Agriculture accounts about two-third of the provincial domestic product, 60% of the labor force, and supports several industries by providing raw materials. However, the agricultural sector suffers from water shortage, frequent drought, and poor agricultural practices, which expose the rural communities to high vulnerability especially women and children who suffer from inadequate domestic water supply. The Balochistan Poverty Reduction Strategy Paper emphasizes the need to expand cropped area, rehabilitate agricultural infrastructure, and reduce vulnerability to drought.
Balochistan's water resources comprise groundwater (4%), water share from Indus Basin (39%), and floodwater (57%). The groundwater is over-exploited and requires a comprehensive reassessment. Balochistan's Indus water share remains underutilized and needs appropriate policy for optimum benefits. Floodwater has further development potential with only 40% of the floodwater resources being utilized and 60% flowing down to the sea. The perennial irrigation (including canals and drains) is seriously deteriorated and requires rehabilitation.
The Balochistan Comprehensive Development Strategy (2013-2020) identifies gaps, sets priorities and associated plans to improve key sectors including agriculture and water resources. The BCDS recognizes (i) increasing water supply and reducing the demand gap, (ii) water logging and salinity, (iii) low irrigation efficiencies, (iv) groundwater mining, (v) neglected spate irrigation farming, and (vi) seawater intrusion in the coastal areas as the main agricultural development constraint. The strategy emphasizes (i) basin water management, (ii) promoting high water use efficiency, (iii) strengthening water management research, (iv) creating Balochistan Water Resources Management Authority (BWRMA), and (v) an investment requirement of PRs68,333 (equivalent $650 million) for the water sector for the strategy period. Sustainable water management in Balochistan's 14 main river basins is a key to increase food production and economic growth. A $300 million World Bank project is already helping the Government in water management in three river basins. Balochistan's integrated water resource management (IWRM) approach identifies 16 areas for improvement including water conservation and better use of surface water resources.
A sector loan is proposed to assist the Government to (i) establish the BWRMA, (ii) adopt an approved BCDS, (iii) operationalize an IWRM approach, and (iv) improve water related infrastructure. Balochistan has a draft BCDS and sector development plan. The Government intended to improve sector policy, institutional and regulatory framework, and sector investment. The proposed project will follow a river basin approach, where policy, institutional, and infrastructural improvements are important. Pakistan has experience in implementing several ADB financed projects in the sector. The IPD has been implementing an ongoing World Bank project. The four river basins will be studied and prioritized following criteria for high development potential, low security risk and return on investment, and feasible subprojects will be developed. The World Bank and International Fund for Agricultural Development were consulted.
- Impact
Project Outcome
- Description of Outcome
- Progress Toward Outcome
Implementation Progress
- Description of Project Outputs
- Status of Implementation Progress (Outputs, Activities, and Issues)
- Geographical Location
Summary of Environmental and Social Aspects
- Environmental Aspects
- Involuntary Resettlement
- Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
- During Project Design
- The main stakeholders are local communities, farming families, and households. In addition, families involved in agro-based small industries will also be beneficiaries. Stakeholders will participate through i) community consultations; ii) project awareness campaigns; iii) grievance redress committees; iv) project displaced person committee; and v) engagement of local people in project related jobs, where preference will be given to displaced persons and in particular to vulnerable people. Consultations will be carried out during project preparation with (i) the communities in the command and watershed areas and nearby villages; (ii) affected persons who may lose part of their land and/or livelihood; and (iii) relevant government departments. Poor and vulnerable households will be identified and their participation actively sought.
- During Project Implementation
- The stakeholders identified at design stage will be involved through community participation in activities of their relevance. The relevant communities will be part of implementation through progress monitoring and consultation.
Business Opportunities
- Consulting Services
- The consulting service shall be provided through national consulting firm and international and national individual consultants. The PPTA will provide 4 person-months of international and 117 person-months of national experts. The consultants will be recruited in accordance with ADB's Guidelines on the Use of Consultants (2013, as amended from time to time). The consultancy firm will be selected through quality- and cost-based selection (QCBS) method (90:10). A full technical proposal will be requested from the shortlisted firms. The individual consultants will be recruited in accordance with ADB's Consulting Guidelines.
Contact
- Responsible ADB Officer
- Zhou, Yaozhou
- Responsible ADB Department
- Central and West Asia Department
- Responsible ADB Division
- Environment, Natural Resources & Agriculture Division, CWRD
- Executing Agencies
-
Irrigation Department, Government of Balochistan
Timetable
- Concept Clearance
- -
- Fact Finding
- -
- MRM
- -
- Approval
- 15 Dec 2014
- Last Review Mission
- -
- Last PDS Update
- 14 Sep 2018
Funding
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Tender Title | Type | Status | Posting Date | Deadline |
---|---|---|---|---|
Balochistan Water Resources Development Project Aquatic Ecology Survey Consultant | Individual - Consulting | Closed | ||
Balochistan Water Resources Development Project Terestial Ecology Survey Consultant | Individual - Consulting | Closed | ||
Balochistan Water Resources Development Project-Water and Agriculture Sector Specialist | Individual - Consulting | Closed |
Contracts Awarded
Procurement Plan
None currently available.