Solomon Islands : Solar Power Development Project

Sovereign Project | 48346-001

The proposed Solar Power Development Project (Project) will support development of solar power in the Solomon Islands . The Project will (i) decrease the cost of power supply by replacing diesel power generation with solar power, (ii) increase access to power through roll-out of a private sector led fee-for-service model, and (iii) reduce greenhouse gas emissions through development of renewable energy. The Project will install grid-connected solar plants and promote private sector led solar household system (SHS) installation and maintenance companies. The Project is proposed to be financed through a project loan and grant.

Project Details

  • Project Officer
    Lee, Woo Yul
    Pacific Department
    Request for information
  • Country/Economy
    Solomon Islands
  • Modality
  • Sector
    • Energy

Related Projects

Project Name Solar Power Development Project
Project Number 48346-001
Country / Economy Solomon Islands
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 8756-SOL: Solar Power Development Project
Strategic Climate Fund - SREP US$ 500,000.00
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Regional integration
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Knowledge solutions
Partnerships
Private sector development
Sector / Subsector

Energy / Renewable energy generation - solar

Gender Effective gender mainstreaming
Description The proposed Solar Power Development Project (Project) will support development of solar power in the Solomon Islands . The Project will (i) decrease the cost of power supply by replacing diesel power generation with solar power, (ii) increase access to power through roll-out of a private sector led fee-for-service model, and (iii) reduce greenhouse gas emissions through development of renewable energy. The Project will install grid-connected solar plants and promote private sector led solar household system (SHS) installation and maintenance companies. The Project is proposed to be financed through a project loan and grant.
Project Rationale and Linkage to Country/Regional Strategy

Solomon Islands is over-reliant on diesel generation which has resulted in high power tariffs. All grid-connected power generation in Solomon Islands is diesel generated, which has resulted in power tariffs amongst the highest in the Pacific. In June 2013, the national uniform tariff was $0.85/kWh to residential customers and $0.91/kWh to commercial customers . The high cost of electricity and the limited reach of the distribution grid is negatively impacting economic growth. In particular, agricultural and tourism are impeded.

Solomon Islands has no installed intermittent renewable energy generation and therefore has limited experience with integration onto existing power grids. Grid-connected electricity is generated and supplied by Solomon Islands Electricity Authority (SIEA), which is a state-owned electricity utility. SIEA provides electricity to the national capital (Honiara) and eight isolated provincial centers on separate islands (Auki, Buala, Gizo, Kirakira, Lata, Malu'u, Noro-Munda, and Tulagi). Installed capacity in Honiara is 26MW (peak load 14.3MW) and combined installed generation capacity in the provincial centers is 4MW. As 100% of grid-connected electricity is diesel generated, SIEA has no experience or human resource capacity in managing intermittent renewable energy integration into the grid. This lack of experience is a barrier to upscaling renewable energy.

The Project includes constructing a total of 2MW grid-connected solar generation at 4 locations on the SIEA grid (Lungga diesel powerplant site, SIEA office, 2 outstations). The solar plants will be owned and operated by SIEA. Increased solar generation will benefit the economy through (i) reduced importation of fossil fuels, (ii) improved energy security, and (iii) reduced tariff volatility due to partial conversion of the national grid to renewable energy. Utilization of renewable energy also reduces greenhouse gas emissions which contribute to global warming. In order to establish the enabling environment for grid-connected solar power, the Project will include (i) training of SIEA staff in operation and maintenance of solar plants, including grid integration, and (ii) preparation of a grid integration analysis. The Project will provide SIEA with experience in solar power generation and contribute to subsequent upscaling of solar power. The project will also transform local supply chains to supply and maintain the assets.

Electricity access is extremely low in Solomon Islands. Solomon Islands has a total population of 512,870 and the capital Honiara, located in Guadalcanal has a population of 64,609 (13% total population). Grid-connected electricity is supplied to approximately 12% of the population on a national basis. The overall access rate in Honiara urban area is 64%, however access in the remainder of the country is 6%, with 5 out of 9 provinces having access rates below 4%. The main reasons for the low access rates are (i) difficult geography and dispersed small size of population centers, (ii) lack of Government community service obligation funding for grid extensions, (iii) high cost of diesel power generation in the provincial centers which provides a disincentive to SIEA to expand the distribution network (where cost of generation exceeds national tariff), and (iv) low capacity to pay in some areas. Due to dispersed nature of the population and difficulty with physical access options for grid extension are limited.

The current solar household system (SHS) supply and maintenance system is unsustainable. Over the past 2 decades there have been a significant number of household systems given to households for free as part of donor supported projects or politically funded distribution schemes. Surveys and anecdotal evidence indicates that the majority of these systems are not maintained adequately, fail in a relatively short period, and do not deliver anticipated development impacts. There is a nascent industry of equipment suppliers and system maintenance providers established in Solomon Islands, however the market is distorted by the grant nature of the current funding system. The current system is unsustainable due to (i) lack of private sector involvement in the supply and maintenance of the solar home system equipment, (ii) lack of standards for solar equipment, (iii) absence of battery recycling system, (iv) lack of trained technicians for system maintenance, (v) lack of incentives for households to properly maintain equipment which was provided free of charge and expectations by households for free replacement systems, (vi) intermittent household incomes for regular maintenance payments for household solar systems, and (vii) distributed population centers and low economies of scale for service providers.

The Project includes a private sector fee-for-service model to install, own, operate and maintain household solar systems for rural households. The Project will design the model, undertake capacity building and partially subsidize equipment costs. Ownership of the household solar systems will remain with the private sector and households will pay an upfront fee for operation and maintenance and partial asset depreciation. This will address (i) irregular income generation in rural areas, (ii) need for regular external maintenance, and (iii) difficulties with tariff collection from remote locations. Requiring households to pay for electricity services (below current costs of kerosene) will improve ownership of the systems and address the lack of ownership demonstrated with free systems. The Project will include (i) competitive bidding for private sector to own and operate household solar system assets, (ii) development of solar standards, (iii) training of private sector in business management, and (iv) training of households in income generation through electricity, electricity safety and household budget management. The Project will benefit new households through (i) replacing kerosene lighting with a cheaper form of energy, thereby freeing household expenditure, (ii) enable household income generation, (iii) improved children education, and (iv) reduced indoor health and safety issues associated with burning firewood and kerosene. Project benefits will be extended through employment of local communities during the construction period

The project supports Solomon Islands National Development Strategy 2011-2020, which prioritizes renewable energy and increaseding electricity access. The proposed project supports Solomon Islands National Energy Policy Framework, 2007 and the Draft National Energy Policy Framework, 2013, which both prioritize renewable energy. The project supports the draft Solomon Islands Renewable Energy Investment Plan, 2013.

Impact
Project Outcome
Description of Outcome
Progress Toward Outcome
Implementation Progress
Description of Project Outputs
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services 5 international consultants will be recruited for this TA.
Responsible ADB Officer Lee, Woo Yul
Responsible ADB Department Pacific Department
Responsible ADB Division Transport, Energy and Natural Resources Division, PARD
Executing Agencies
Ministry of Finance and Treasury
P.O. Box 26
Honiara, Solomon Islands
Timetable
Concept Clearance -
Fact Finding -
MRM -
Approval 07 Nov 2014
Last Review Mission -
Last PDS Update 30 Sep 2016

TA 8756-SOL

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
07 Nov 2014 25 Dec 2014 25 Dec 2014 31 May 2015 30 May 2016 16 Sep 2016
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
0.00 500,000.00 0.00 0.00 0.00 0.00 500,000.00 17 Jun 2022 440,318.58

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Solar Power Development Project: Initial Poverty and Social Analysis Initial Poverty and Social Analysis Jan 2015

Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.


Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

No tenders for this project were found.

Contracts Awarded

No contracts awarded for this project were found

Procurement Plan

None currently available.