fbpx 49021-002: Heilongjiang Green Urban and Economic Revitalization Project | Asian Development Bank

China, People's Republic of: Heilongjiang Green Urban and Economic Revitalization Project

Sovereign (Public) Project | 49021-002 Status: Active

The project will continue ADB's long-term partnership with HPG and take a strategic, holistic, and long-term approach to further develop and implement the Transformation Development Plan of Coal Cities in Heilongjiang (2014 -2020), establishing a non-coal economic base, i.e., green food, pharmaceutical, renewable energy, and high-tech industries. The indicative project impacts are revitalized economy of East Heilongjiang subregion with non-coal industries in the cities of Hegang, Jixi, Qitaihe, and Shuangyashan; improved East Heilongjiang smart city cluster cooperation; and improved living environment, safety, and public health in the cities of Hegang, Jixi, Qitaihe, and Shuangyashan. The indicative project outcome is improved enabling environment for non-coal economic and industrial transformation.

Project Details

Project Officer
Rau, Stefan East Asia Department Request for information
Country
  • China, People's Republic of
Modality
  • Loan
  • Technical Assistance
Sector
  • Agriculture, natural resources and rural development
 
Project Name Heilongjiang Green Urban and Economic Revitalization Project
Project Number 49021-002
Country China, People's Republic of
Project Status Active
Project Type / Modality of Assistance Loan
Technical Assistance
Source of Funding / Amount
Loan 3613-PRC: Heilongjiang Green Urban and Economic Revitalization Project
Ordinary capital resources US$ 310.00 million
Ordinary capital resources US$ 310.00 million
Loan: Heilongjiang Green Urban and Economic Revitalization Project
European Investment Bank US$ 220.00 million
European Investment Bank US$ 220.00 million
TA 9436-PRC: Heilongjiang Business Development Services Support to Strengthen Financial Intermediation Component Implementation
Technical Assistance Special Fund US$ 450,000.00
Financial Sector Development Partnership Special Fund US$ 300,000.00
Technical Assistance Special Fund US$ 450,000.00
Financial Sector Development Partnership Special Fund US$ 300,000.00
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Knowledge solutions
Partnerships
Private sector development
Sector / Subsector

Agriculture, natural resources and rural development / Land-based natural resources management

Energy / Energy efficiency and conservation

Finance / Small and medium enterprise finance and leasing

Industry and trade / Small and medium enterprise development

Transport / Urban public transport - Urban roads and traffic management

Water and other urban infrastructure and services / Urban flood protection - Urban sewerage - Urban water supply

Gender Equity and Mainstreaming Effective gender mainstreaming
Description The project will continue ADB's long-term partnership with HPG and take a strategic, holistic, and long-term approach to further develop and implement the Transformation Development Plan of Coal Cities in Heilongjiang (2014 -2020), establishing a non-coal economic base, i.e., green food, pharmaceutical, renewable energy, and high-tech industries. The indicative project impacts are revitalized economy of East Heilongjiang subregion with non-coal industries in the cities of Hegang, Jixi, Qitaihe, and Shuangyashan; improved East Heilongjiang smart city cluster cooperation; and improved living environment, safety, and public health in the cities of Hegang, Jixi, Qitaihe, and Shuangyashan. The indicative project outcome is improved enabling environment for non-coal economic and industrial transformation. The project is expected to have four outputs: (i) key components facilitating economic diversification and industrial transformation towards a non-coal future in the project cities improved; (ii) remediation and environmental cleanup and safety of impacts from coal mining in the project cities improved; (iii) integrated basic urban infrastructure and services in the project cities improved; and (iv) capacity in project cities developed in areas of (a) economic diagnostic study and strategy, non-coal industry development planning, and smart city cluster cooperation; (b) prioritized investment program preparation; (c) project planning and management; (d) mining remediation management and environment cleanup; and (e) infrastructure and services delivered through public-private partnerships.
Project Rationale and Linkage to Country/Regional Strategy

The cities of Hegang, Jixi, Qitaihe, and Shuangyashan (project cities) are located in the east of Heilongjiang Province in the northeast of the People's Republic of China (PRC), bordering the Russian Federation to the east and to the north. The total combined population is 5.4 million with urban populations of 870,000 (Hegang); 1,180,000 (Jixi); 540,000 (Qitaihe); and 960,000 (Shuangyashan). The East Heilongjiang subregion and the four project cities have been an important coal base and electricity production hub delivering a cumulative total of more than 3.2 billion tons of coal to the country's economy. However, Heilongjiang and the project cities face serious economic decline and population loss due to severe price cuts of coal and changes in the PRC's energy and climate policy, with reduced revenues in these coal mining dependent economies. Urban poverty has become serious with declining wages combined with poor and unsanitary living conditions due to lack of proper urban infrastructure and services.

The project cities suffer from pollution of soil, water, and air caused by coal mining over the last 60 years. Risks to safety, health, and environment from mining impacts include (i) geohazard risk of subsidence from below-grade mining; (ii) waste rock dumpsites that wash out toxic heavy metals into soil, and ground and surface water; and (iii) carcinogenic dust particles that pollute the air. Substantial funding for monitoring of contamination levels and various physical remediation measures is needed. Many rivers are polluted with sediments from mining, industries, and households that discharge untreated wastewater, and from chemical fertilizers and pesticides used in agriculture. Some rivers overflow and cause floods during heavy storms and snow melt in the spring. The combination of inadequate infrastructure and environmental pollution compromise urban livability and pose serious risks to human safety and health.

There is an urgent need to revitalize and transform the economy towards a sustainable non-coal future through (i) strategic planning for non-coal industries and key investments that facilitate private investments in non-coal jobs; (ii) environmental cleanup and remediation of impacts from mining (not supporting mining itself); (iii) urban infrastructure, services, and environmental improvement that help attract and retain modern companies and qualified workers; and (iv) capacity development to plan and implement a strengthened subregion as smart, inclusive, competitive, and green East Heilongjiang Smart City Cluster with educated and skilled workers. Without the project, the economy will continue to decline, environmental safety and living conditions will worsen, and chances for improvements and investments will dwindle.

Through its strategic and holistic approach, the proposed project will support the (i) PRC's National New-Type Urbanization Plan (2014-2020), (ii) 13th five-year plans of Heilongjiang and project cities, (iii) Heilongjiang Provincial Government (HPG) Master Plan for Economic Development (2014-2020), and (iv) urban and economic development master plans of the project cities. The proposed project is included as a standby for 2017 in the country operations business plan of the Asian Development Bank (ADB) for the PRC and is aligned with (i) Strategy 2020 Midterm Review; (ii) upcoming country partnership strategy for the PRC, 2016-2020, supporting socially inclusive, environmentally sustainable, and economically competitive development; and (iii) urban, water, and environment operational plans/directions.

Impact

Economy revitalized and diversified, and non-coal industries in the cities of Hegang, Jixi, Qitaihe, and Shuangyashan developed

Living environment, safety, and public health in cities of Hegang, Jixi, Qitaihe, and Shuangyashan improved

Project Outcome
Description of Outcome Non-coal economic activities and urban livability in project cities increased
Progress Toward Outcome Project start up consultants, project implementation consultants (CS1) and business development services consultants (CS2) have been contributing to implementation activities including: review and of engineering design as prepared by local design institutes, site-specific environmental management plans and their preparation, updating of resettlement plans, and training on SME capacity development, training to SMEs, screening of a list of candidate SMEs in each project city for the financial intermediation component, and other activities. Goods and works contracts were awarded and under implementation in all four cities. One works contract in Shuangyashan has been completed under advance contracting and retroactive financing. Project inception mission was fielded in 6-9 November 2018. Two review missions were fielded in March and December 2019, and a virtual review mission was conducted in May 2020.
Implementation Progress
Description of Project Outputs

Capacity in BDS and integrated project planning and management developed

Sustainable SME investment and access to finance in project cities improved

Key infrastructure and SME facilities in non-coal industrial parks in project cities constructed

Remediation and environmental cleanup from mining impacts in project cities improved

Integrated urban infrastructure and services in project cities improved

Status of Implementation Progress (Outputs, Activities, and Issues)

Output 1: BDS consultants and project implementation consultants provide capacity development to the government and SMEs

Output 2: Financial intermediation loan component has completed signing of all framework agreements and for the initial batch of subprojects subproject agreements are under finalisation.

Output 3: Some of the infrastructure and facilities are with signed contracts or under advanced stages of procurement and detailed engineering design.

Output 4: The Hegang mining remediation subproject is at an advanced stage of engineering design and completed its site-specific environmental management plan. Projects for other three cities are under preliminary design stage.

Output 5: Goods and works contracts were awarded and under implementation in all four project cities.

Geographical Location Hegang, Jixi, Qitaihe Shi, Shuangyashan
Safeguard Categories
Environment A
Involuntary Resettlement A
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects Environment safeguard is category A due to potential adverse impacts on natural habitats, river morphology, sediment transport, downstream areas, and cultural resources. However, the project overall will generate positive impacts on the environment from (i) its overall objective of diversification away from coal mining and related industries, (ii) from mining remediation and environmental cleanup pilot projects, (iii) from river rehabilitation, ecological approach to flood risk management and river embankment design, and (iv) from wastewater and drainage systems improvements.
Involuntary Resettlement Involuntary resettlement safeguard is category A due to potential impacts on land acquisition and house demolition of flood risk management and road construction components.
Indigenous Peoples Indigenous peoples safeguard is category C and has been confirmed during PPTA implementation.
Stakeholder Communication, Participation, and Consultation
During Project Design The beneficiaries were consulted during the PPTA implementation through social surveys, stakeholders' workshops, focus group discussions, and key informant interviews. Documents prepared during PPTA, include the Environmental Impact Assessment, Environmental Management Plan, Social and Gender Action Plan, Resettlement Plans outline the program for consultation and participation of beneficiaries during the design and implementation period of the project. Loan assurances address implementation and monitoring of these plans. As the poor are the most vulnerable, they should benefit more from project improvement and design elements and project activities include social inclusive elements.
During Project Implementation After project approval consultations with beneficiaries, communities, stakeholders and affected persons will be carried out and SMEs and SME associations will be consulted and strengthened. Inclusive business and gender balanced business has been included as a principle in the project design of the financial intermediation component and the business development services and training to women-owned and managed businesses and to inclusive businesses will be provided during implementation.
Responsible ADB Officer Rau, Stefan
Responsible ADB Department East Asia Department
Responsible ADB Division Urban and Social Sectors Division, EARD
Executing Agencies
Heilongjiang Provincial Finance Department
No. 146 Jianshe Street, Nangang District
Harbin, 150001 P.R. China
Heilongjiang Provincial Government
People's Republic of China
Timetable
Concept Clearance 16 Nov 2015
Fact Finding 24 Mar 2017 to 07 Apr 2017
MRM 25 May 2017
Approval 05 Dec 2017
Last Review Mission -
Last PDS Update 30 Sep 2020

Loan 3613-PRC

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
05 Dec 2017 21 May 2018 04 Sep 2018 31 Aug 2023 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 2,042.00 Cumulative Contract Awards
ADB 620.00 05 Dec 2017 0.00 0.00 0%
Counterpart 982.00 Cumulative Disbursements
Cofinancing 440.00 05 Dec 2017 0.00 0.00 0%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - - - Unsatisfactory - -

TA 9436-PRC

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
05 Dec 2017 28 Dec 2017 28 Dec 2017 28 Feb 2023 - -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
1,500,000.00 0.00 0.00 0.00 0.00 0.00 1,500,000.00 05 Dec 2017 6,380.00
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - - - Unsatisfactory - -

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Heilongjiang Green Urban and Economic Revitalization Project: Procurement Plan Procurement Plans Aug 2020
Heilongjiang Green Urban and Economic Revitalization Project: Audited Project Financial Statements (4 September 2018-31 December 2019) Audited Project Financial Statements Jun 2020
Loan Agreement (Ordinary Operations) for Loan 3613-PRC: Heilongjiang Green Urban and Economic Revitalization Project Loan Agreement (Ordinary Resources) May 2018
Project Agreement for Loan 3613-PRC: Heilongjiang Green Urban and Economic Revitalization Project Project/Program Agreements May 2018
黑龙江省绿色城市和经济振兴项目 : 项目数据表 Translated PDS Mar 2018
Heilongjiang Green Urban and Economic Revitalization Project: Investment Project Components (Section A) Project Administration Manual Project/Program Administration Manual Nov 2017
Heilongjiang Green Urban and Economic Revitalization Project: Report and Recommendation of the President Reports and Recommendations of the President Nov 2017
Heilongjiang Green Urban and Economic Revitalization Project: Social and Gender Action Plan Gender Action Plans Nov 2017
Heilongjiang Green Urban and Economic Revitalization Project: Financial Intermediation Component and Business Development Services Subcomponent (Section B) Project Administration Manual Project/Program Administration Manual May 2017
Heilongjiang Coal-Rich Cities Redevelopment Project: Project Preparatory Technical Assistance Report Project Preparatory Technical Assistance Reports Nov 2015
Heilongjiang Coal-Rich Cities Redevelopment Project: Initial Poverty and Social Analysis Initial Poverty and Social Analysis Nov 2015

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Heilongjiang Green Urban and Economic Revitalization Project: Resettlement Due Diligence Report Safeguards Due Diligence Reports Jan 2021
Heilongjiang Green Urban and Economic Revitalization Project: Qitaihe Subproject Updated Resettlement Plan Resettlement Plans Nov 2020
Heilongjiang Green Urban and Economic Revitalization Project: Jixi Subproject Resettlement Plan Resettlement Plans Nov 2020
Heilongjiang Green Urban and Economic Revitalization Project: Jixi Subproject Updated Resettlement Plan Resettlement Plans Aug 2020
Heilongjiang Green Urban and Economic Revitalization Project: Environmental Monitoring Report (April-December 2019) Environmental Monitoring Reports Feb 2020
Heilongjiang Green Urban and Economic Revitalization Project: Hegang Subproject Updated Resettlement Plan Resettlement Plans Nov 2019
Heilongjiang Green Urban and Economic Revitalization Project: Social Monitoring Report (June 2018-March 2019) Social Monitoring Reports Jul 2019
Heilongjiang Green Urban and Economic Revitalization Project: Environmental Monitoring Report (September 2018-March 2019) Environmental Monitoring Reports Apr 2019
Heilongjiang Green Urban and Economic Revitalization Project: Shuangyashan Subproject Resettlement Plan Resettlement Plans Dec 2017
黑龙江绿色城市经济振兴项目:鸡西子项目移民安置计划 Resettlement Plans May 2017
黑龙江绿色城市经济振兴项目:双鸭山子项目移民安置计划 Resettlement Plans May 2017
黑龙江绿色城市经济振兴项目:七台河子项目移民安置计划 Resettlement Plans May 2017
Heilongjiang Green Urban and Economic Revitalization Project: Qitaihe Subproject Resettlement Plan Resettlement Plans May 2017
Heilongjiang Green Urban and Economic Revitalization Project: Shuangyashan Subproject Resettlement Plan Resettlement Plans May 2017
Heilongjiang Green Urban and Economic Revitalization Project: Jixi Subproject Resettlement Plan Resettlement Plans May 2017
Heilongjiang Green Urban and Economic Revitalization Project: Draft Environmental Impact Assessment Environmental Impact Assessments May 2017
黑龙江绿色城市经济振兴项目:鹤岗子项目移民安置计划 Resettlement Plans Mar 2017
Heilongjiang Green Urban and Economic Revitalization Project: Hegang Subproject Resettlement Plan Resettlement Plans Mar 2017

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
3613-PRC: Heilongjiang Green Urban and Economic Revitalization Project (QH-G6B) Invitation for Bids Closed 27 Oct 2020 09 Dec 2020
External Resettlement and Social Monitoring and External Environment Monitoring Consulting Services (Hegang subproject) Firm - Consulting Closed 10 May 2020 24 May 2020
External Resettlement and Social Monitoring and External Environment Monitoring Consulting Services Firm - Consulting Closed 17 Jan 2020 10 Feb 2020
External Resettlement and Social Monitoring and External Environment Monitoring Consulting Services (Qitaihe subproject) Firm - Consulting Closed 06 Dec 2019 20 Dec 2019
External Resettlement and Social Monitoring and External Environment Monitoring Consulting Services (Jixi subproject) Firm - Consulting Closed 19 Sep 2019 03 Oct 2019
Business development services for SMEs Firm - Consulting Closed 08 Apr 2019 14 Apr 2019
Heilongjiang Business Development Services Support to Strengthen Financial Intermediation Component Implementation Firm - Consulting Closed 01 Mar 2019 07 Mar 2019
Heilongjiang Green Urban and Economic Revitalization Project - Social and resettlement safeguards and ESMS specialist Individual - Consulting Closed 11 Jul 2018 17 Jul 2018
Heilongjiang Green Urban and Economic Revitalization Project - Environment safeguards and ESMS specialist Individual - Consulting Closed 19 Feb 2018 25 Feb 2018
project implementation consulting services for project management support and capacity development Firm - Consulting Closed 03 Feb 2018 16 Feb 2018
Project Start-up Consultant - Environment Specialist Individual - Consulting Closed 28 Nov 2017 12 Dec 2017
Project Start-up Consultant - Project Procurement and Management Specialist Individual - Consulting Closed 28 Nov 2017 12 Dec 2017
Project Start-up Consultant - SME business strategy specialist Individual - Consulting Closed 28 Nov 2017 12 Dec 2017
Project Start-up Consultant - Resettlement Specialist Individual - Consulting Closed 28 Nov 2017 12 Dec 2017
Project Start-up Consultant - Project and Small-and Medium-sized Enterprises Financial Management Specialist Individual - Consulting Closed 28 Nov 2017 12 Dec 2017
Project Start-up Consultant - SME business sector specialists (sector qualification based on demand) Individual - Consulting Closed 28 Nov 2017 12 Dec 2017
Loan No. 49021-PRC: Heilongjiang Green Urban and Economic Revitalization Project [SY-RC-W9] Invitation for Bids Closed 02 Oct 2017 03 Nov 2017
49021-PRC: Heilongjiang Green Urban and Economic Revitalization Project [HG-G2] Invitation for Bids Closed 01 Sep 2017 10 Oct 2017
49021-PRC: Heilongjiang Green Urban and Economic Revitalization Project Advance Notice Active 06 Jun 2017

Contracts Awarded

Contract Title Approval Number Contract Date Contractor Contractor Address Executing Agency Contract Description Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
CS3A EXTERNAL RESETTLEMENT AND SOCIAL MONITORING AND EXTERNAL ENVIRONMENT-HEGANG Loan 3613 08 Dec 2020 WUHAN YUNHAICHEN CONSULTING CO., LTD PRC CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSULTANCY 264,455.81 264,455.81
JX-JG-W2 CIVIL WORKS FOR JIGUAN DISTRICT INDUSTRIAL PARK WWTP NETWORK Loan 3613 26 Nov 2020 HEILONGJIANG CONSTRUCTION AND INSTALLATION GR PRC CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSTRUCTION 4,310,404.65 2,989,017.68
QH-GF-W2 QITAIHE INDUSTRIAL PARK (GREEN FOOD AND PHARMA BIOFERMENTATION)CW FOR ROADS AND ASSOC. FACILITIES Loan 3613 02 Oct 2020 ZHONGQING JIAN'AN CONSTRUCTION GROUP CO., LTD QITAIHE CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSTRUCTION 4,390,890.40 4,033,585.62
JX-WT-W8 WTP UPGRADING AND EXPANSION Loan 3613 27 Sep 2020 HEILONGJIANG CONSTRUCTION AND INSTALLATION GR JIXI CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSTRUCTION 6,190,076.74 4,276,594.68
CS3D EXTERNAL RESETTLEMENT AND SOCIAL MONITORING AND EXTERNAL ENVIRONMENT MONITORING- SHUANGYASHAN Loan 3613 20 Aug 2020 WUHAN YUNHAICHEN CONSULTING CO., LTD. AND WUHAN PRC CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSULTANCY 274,036.20 274,036.20
CS3B EXTERNAL RESETTLEMENT AND SOCIAL MONITORING AND EXTERNAL ENVIRONMENT MONITORING SERVICES-JIXI Loan 3613 14 Jul 2020 WUHAN YUNHAICHEN CONSULTING CO.LTD AND WUHAN CHINA,PEOPLE'SREP.OF CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSULTANCY 238,609.61 238,609.61
HG-IT-W10.2 NANYI ROAD, QIZHONG ROAD AND XINHE ROAD RECONSTRUC TION WORKS Loan 3613 23 Dec 2019 XINGTAI MUNICIPAL CONSTRUCTION GROUP HEGANG CITY, HEILONGJIANG CHINA,PEOPLE'SREP.OF CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSTRUCTION 1,953,957.40 1,896,206.75
CS2- BUSINESS DEVELOPMENT SERVICES FOR SMES Loan 3613 23 Dec 2019 FRANKFURT SCHOOL OF FINANCE & MNGT GMBH FRANKFURT, GERMANY GERMANY Heilongjiang Provincial Government CONSULTANCY 5,866,000.00 5,866,000.00
HG-G1-ITS INTELLIGENT SIGNAL CONTROL SYSTEMS AND OTHER FACILITIES, MAINTENANCE VEHICLES AND EQUIP FOR BUS OPERATION Loan 3613 25 Nov 2019 HIT ROBOT GROUP JIALITONG TENCHNOLOGY CO.,LTD RM 207, NO. 162 HONGQI ST. NO. 17 BLDG. NANGANG DISTRICT CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government SUPPLY OF GOODS 2,726,059.85 2,716,253.88
HG-IT-W10.3- ROAD REHABILITATION PUBLIC, AND NON- MOTORIZED TRANSPORT IMPROVEMENTS CAIFU ROAD RERECONSTRUCTION WORKS Loan 3613 13 Nov 2019 JIANGXI ZHENGYU CONSTRUCTION GROUP CO. LTD. HEGANG CITY HEILONGJIANG CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSTRUCTION 5,269,336.06 5,027,587.99
HG-IT-W10.1-ROAD REHABILITATION, PUBLIC, AND NON- MOTORIZED TRANSPORT IMPROVEMENTS DONGGANG ROAD RECONSTRUCTION PROJECT Loan 3613 13 Nov 2019 JIANGXI YINYING CONSTRUCTION ENGINEERING CO., HEGANG CITY HEILONGJIANG CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSTRUCTION 3,256,626.13 3,107,217.73
Capacity Development Technical Assistance 9436 16 Aug 2019 NAREE International Limited (HONG KONG, CHINA) in association with NAREE Consulting Limited, China (CHINA,PEOPLE'SREP.OF) Unit N, 5/F, 4 Cho Yuen Street, Yau Tong Kowloon, Hong Kong, China Heilongjiang Provincial Government Consulting Services 649,956.00
CS1-PROJECT IMPLEMENTATION CONSULTING SERVICES FOR PROJECT MANAGEMENT SUPPORT AND CAPACITY DEVELOPMEN QCBS Loan 3613 12 Aug 2019 HJI GROUP CORPORATION AND BEIJING HAMONI 3200 PARK CENTER DRIVE, SUITE 1180 COSTA MESA, CA 92626, USA UNITED STATES Heilongjiang Provincial Government CONSULTANCY 6,912,855.00 6,912,855.00
SHUANGYASHAN SUBPROJECT XINXING ST ONNECTS THE RAILWAY (CENTRAL STATION) BRIDGE PROJECT & THE SUPPORTING SEWAGE DRAINAGE NETWORK (SY-RC-W9) Loan 3613 31 Oct 2018 CCCC TUNNEL ENGINEERING COMPANY LTD C/O LIU CHAO, DEPUTY MANAGER CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government CONSTRUCTION 21,180,100.00 21,180,100.00
HG-G2: INTELLIGENT TRANSPORT SYSTEM-SIGNAL CONTROL SYSTEM, TRAFFIC MONITORING AND COMMANDING PLATFORM Loan 3613 10 Oct 2018 BOCOM INTELLIGENT INFORMATION TECH CO. LTD. ZHONGGUANCUN, 66 XIXIAOKOU ROAD HAIDIAN DISTRICT, BEIJING CHINA,PEOPLE'SREP.OF Heilongjiang Provincial Government SUPPLY OF GOODS 1,408,927.00 1,398,624.00