Timor-Leste: Electricity System Strengthening and Sustainability Program
The proposed investment program will finance investments in Electricidade de Timor-Leste (EDTL) Timor-Leste's state-run electric utility) to improve electricity service reliability, expand access to modern energy services, and improve performance of EDTL's management, maintenance, and revenue-collection systems throughout Timor-Leste. Achievement of these objectives will substantially reduce the fiscal drain of the power sector on Timor-Leste's budget. Investments will be financed consistent with a sector development strategy and investment roadmap, to be prepared as a key output of project preparatory technical assistance (PPTA).
Project Details
-
Project Officer
Trainor, James Michael
Pacific Department
Request for information -
Country/Economy
Timor-Leste -
Modality
- Technical Assistance
-
Sector
- Energy
Related Projects
Project Name | Electricity System Strengthening and Sustainability Program | ||||
Project Number | 49177-001 | ||||
Country / Economy | Timor-Leste |
||||
Project Status | Closed | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Inclusive economic growth |
||||
Drivers of Change | Governance and capacity development Knowledge solutions Partnerships Private sector development |
||||
Sector / Subsector | Energy / Electricity transmission and distribution |
||||
Gender Equity and Mainstreaming | No gender elements | ||||
Description | The proposed investment program will finance investments in Electricidade de Timor-Leste (EDTL) Timor-Leste's state-run electric utility) to improve electricity service reliability, expand access to modern energy services, and improve performance of EDTL's management, maintenance, and revenue-collection systems throughout Timor-Leste. Achievement of these objectives will substantially reduce the fiscal drain of the power sector on Timor-Leste's budget. Investments will be financed consistent with a sector development strategy and investment roadmap, to be prepared as a key output of project preparatory technical assistance (PPTA). | ||||
Project Rationale and Linkage to Country/Regional Strategy | The principal weaknesses in the power sector are the high cost of generation, inefficient distribution, low level of revenue generation, ongoing need for substantial fiscal subsidies, and excessive technical and non-technical network losses. These problems are, to some extent, the result of other weaknesses in the institutional, legal and regulatory environment, namely the absence of proper commercial practices within EDTL and poor implementation of the legal and regulatory frameworks for the sector. | ||||
Impact |
Project Outcome | |
---|---|
Description of Outcome | |
Progress Toward Outcome | |
Implementation Progress | |
Description of Project Outputs | |
Status of Implementation Progress (Outputs, Activities, and Issues) | |
Geographical Location | Nation-wide |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | TA Consulting firm has been mobilized last March 2017. The consultant has finalized the reports and recommendations which will be presented to the government of Timor-Leste sometime in January 2019. |
Procurement | No procurement activity under this TA. |
Responsible ADB Officer | Trainor, James Michael |
Responsible ADB Department | Pacific Department |
Responsible ADB Division | PAEN |
Executing Agencies |
Ministry of Public Works Mercado Lama, Caicoli Dili, Timor-Leste |
Timetable | |
---|---|
Concept Clearance | - |
Fact Finding | - |
MRM | - |
Approval | 29 Jan 2016 |
Last Review Mission | - |
Last PDS Update | 27 Sep 2018 |
TA 9075-TIM
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
29 Jan 2016 | 21 Apr 2016 | 21 Apr 2016 | 31 Aug 2016 | 31 Mar 2019 | 31 May 2019 |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
1,000,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1,000,000.00 | 01 Apr 2022 | 997,675.00 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
Programa Sustentabilidade no Haforsa Sistema Eletrisidade : Folha de Dadus Projetu | Translated PDS | Sep 2016 |
Electricity System Strengthening and Sustainability Program: Initial Poverty and Social Analysis | Initial Poverty and Social Analysis | Jan 2016 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
No tenders for this project were found.
Contracts Awarded
Contract Title | Approval Number | Contract Date | Contractor | Address | Executing Agency | Total Contract Amount (US$) | Contract Amount Financed by ADB (US$) |
---|---|---|---|---|---|---|
Project Preparatory | Technical Assistance 9075 | 16 Mar 2017 | Tetra Tech ES, Inc. (United States) in Association with Castlerock Consulting Pte. Ltd. (Singapore) | 4601 N Fairfax Drive Suite 601 Arlington Va 22203, Usa | Ministry of Public Works, Transport and Communications | 999,988.00 | — |
Procurement Plan
None currently available.