Marshall Islands : Majuro Power Network Strengthening Project

Sovereign Project | 49450-007

2. The Project will support the Republic of the Marshall Islands' (RMI) renewable energy targets and greenhouse-gas (GHG) emissions reduction targets through investments in the Majuro distribution network. The project will install an advanced metering infrastructure (AMI) in the Majuro power distribution network to enable Marshalls Energy Company (MEC) to collect data on physical energy flows within its network, reduce system technical and commercial losses, and improve system reliability. The data provided by the AMI will also inform successive investments in Majuro's power system, including siting of additional renewable energy generation assets on the Majuro power system. Consulting advisory services will be provided to support the AMI implementation, and to prepare a comprehensive capacity-building and business-process reengineering (BPR) roadmap for implementation under successive investment projects.

Project Details

  • Project Officer
    George, Len V.
    Pacific Department
    Request for information
  • Country/Economy
    Marshall Islands
  • Sector
    • Energy
Project Name Majuro Power Network Strengthening Project
Project Number 49450-007
Country / Economy Marshall Islands
Project Status Active
Project Type / Modality of Assistance Grant
Source of Funding / Amount
Grant 0554-RMI: Majuro Power Network Strengthening Project
Asian Development Fund US$ 2.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Governance and capacity development
Knowledge solutions
Partnerships
Sector / Subsector

Energy / Electricity transmission and distribution

Gender No gender elements
Description 2. The Project will support the Republic of the Marshall Islands' (RMI) renewable energy targets and greenhouse-gas (GHG) emissions reduction targets through investments in the Majuro distribution network. The project will install an advanced metering infrastructure (AMI) in the Majuro power distribution network to enable Marshalls Energy Company (MEC) to collect data on physical energy flows within its network, reduce system technical and commercial losses, and improve system reliability. The data provided by the AMI will also inform successive investments in Majuro's power system, including siting of additional renewable energy generation assets on the Majuro power system. Consulting advisory services will be provided to support the AMI implementation, and to prepare a comprehensive capacity-building and business-process reengineering (BPR) roadmap for implementation under successive investment projects.
Project Rationale and Linkage to Country/Regional Strategy

1. Sector Policy and Renewable Energy Targets. The RMI Government has adopted a target of 20% renewable generation for electricity by 2020, and has committed to a 35% reduction of GHG emissions under its UNFCCC Paris Agreement nationally determined contributions (NDCs), as compared to its 2010 baseline. RMI has long-term target of net-zero emissions for its entire economy by 2050 under its NDCs. 54% of RMI's emissions are from power generation. 90% of RMI's total primary energy supply derives from imported petroleum products.

2. Concentration of Power Generation and Consumption on Majuro. MEC, RMI's largest power utility, is responsible for electricity service throughout RMI, except for Ebeye in Kwajalein Atoll. MEC's main system on Majuro Atoll provides universal service to a population of 28,000 persons, and delivers approximately 72% of electric power consumed in RMI (with Ebeye accounting for 24%, and outer islands representing the balance).

3. High Reliance on Imported Petroleum Fuel. Diesel generation accounts for approximately 98% of the Majuro system's annual power generation of approximately 53.7 GWh. While Majuro enjoys an abundant solar resource, and may have an economically viable wind resource, development of additional intermittent renewable generation beyond its current 900 kWp installed solar generation is technically infeasible without investment in network, generation, and control hardware to ensure network stability.

4. High Network Losses and Network Operation Data Gaps. Beyond the constraint on installation of additional solar generation, Majuro exhibits very high technical and non-technical losses, estimated in 2010 approximately 20% of electricity introduced into the distribution network. Reducing Majuro's network losses will significantly contribute to a reduction in diesel consumption and improve MEC's revenue generation by reducing unbilled consumption. The installation of an advanced metering infrastructure will facilitate this, and will also provide required data on the Majuro network's operation to inform further network loss reduction investments, the siting of distributed renewable energy generation, and distribution network upgrades to enable the same without jeopardizing stable system operation.

5. Rapid Loss-Reduction Measures Possible. The project will support the reduction of Majuro's dependence on imported diesel fuel by reducing its distribution network losses, which constitute around 20% of total generated energy in Majuro. The project will (i) install advanced metering infrastructure (AMI) on all distribution transformers on the network, and (ii) install centralized control and metering distribution network center, which will automatically collect and compile metered data from all distribution transformers. The AMI will provide data to MEC to identify network areas suffering high technical or non-technical losses, which will enable MEC to reduce these losses. It is estimated that simple measures requiring little resource investments, such as re-configuration of customer supply connections to distribution transformers and repair of malfunctioning customer meters will enable MEC to rapidly reduce network losses by up to 4% of generated power.

6. MEC Business Process and Organizational Inefficiencies. Deficiencies in MEC's business processes, including budget formulation, asset management and maintenance, cost accounting and reporting, and capital project planning and execution, among others, are cause for concern for the ability of MEC's sustainability as a going concern. To maximize value for investments under this project, and future projects financed by ADB or other donors, a far-reaching capacity-building and institutional strengthening program is essential.

7. Project Preparation and Project Readiness. Consultants under TA-9225 RMI have prepared the Project as a discrete intervention to capitalize on the opportunity to reduce system technical and commercial losses while informing future investments under a renewable energy investment road-map that these consultants are preparing. Consultants have prepared ICB bid documents for a turn-key AMI contract and implementation consultant support. ADB will provide support to MEC during tendering for ICB procurements through TA-9086 REG (Building Project Implementation Capacity in the Pacific), and through SDCC smart-grid experts for technical input in bid evaluation. The RMI Government have agreed to re-delegate to ADB (PARD) procurement of consulting services to assess MEC's business processes and develop business-process reengineering recommendations and action plan.

8. Alignment with development plans. The project is included in ADB's Country Operations Business Plan 2017-2019 and supports RMI's national energy policy and energy action plan to reduce dependence on imported fossil fuels and reduce supply-side losses.

Impact

The impacts will be (i) reduced dependence on imported fossil fuels, (ii) supply-side losses reduced, (iii) renewable electricity generation increased.

Project Outcome
Description of Outcome

MEC's consumption of diesel fuel for power generation reduced.

Progress Toward Outcome Not yet due.
Implementation Progress
Description of Project Outputs

Advanced Metering Infrastructure on Majuro distribution network

MEC business process reengineering and management improvement action plans

Status of Implementation Progress (Outputs, Activities, and Issues) The review of the bid evaluation report for the Advance Metering Infrastructure package has been completed. ADB has advised the implementing agency to proceed with the negotiation with the first-ranked, most substantially responsive bidder in September 2022. The expected awarding of the contract for this package is on or before Q1 2023.
Geographical Location Nation-wide
Safeguard Categories
Environment C
Involuntary Resettlement C
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services Project consultants have been engaged in September 2020 to support the Shopping for AMI.
Procurement Specs for Advance Metering Infrastructure Shopping package are being reviewed by the consultant. To be floated in Q1 2021.
Responsible ADB Officer George, Len V.
Responsible ADB Department Pacific Department
Responsible ADB Division PAEN
Executing Agencies
Asian Development Bank
Marshalls Energy Company
Ministry of Finance, Banking and Postal Services
Timetable
Concept Clearance 29 Jun 2017
Fact Finding 18 Jul 2017 to 26 Jul 2017
MRM 06 Sep 2017
Approval 27 Nov 2017
Last Review Mission -
Last PDS Update 28 Sep 2022

Grant 0554-RMI

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
27 Nov 2017 07 Dec 2017 07 May 2018 31 Jul 2020 31 Jul 2024 -
Financing Plan Grant Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 2.25 Cumulative Contract Awards
ADB 2.00 23 Jan 2023 1.97 0.00 98%
Counterpart 0.25 Cumulative Disbursements
Cofinancing 0.00 23 Jan 2023 0.29 0.00 15%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - Satisfactory Satisfactory Satisfactory Satisfactory Satisfactory

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.


Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Majuro Power Network Strengthening Project: Indigenous Peoples Impact Categorization Indigenous Peoples Impact Matrix Oct 2017

Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Grant No. 0554-RMI: Majuro Power Network Strengthening Project [MEC-MPNSP-01-2018] Invitation for Bids Closed
Supervision Consultant for Advanced Metering Infrastructure Supply and Installation Individual - Consulting Closed

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
Supply, Installation and commissioning of Advanced Metering Infrastructure (AMI) Grant 0554 31 Dec 2022 Genus Power Infrastructure Limited | SPL-3, RIICO Industrial Area, Sitapura, Tonk Road, Jaipur-302022 (Rajasthan), India Ministry of Finance, Banking and Postal Services 1,574,320.00
METERING EXPERT Grant 0554 01 Sep 2020 RITESH SINGH (THROUGH TETRA TECH ES INC.) | 1320 N. COURTHOUSE RD. ARLINGTON VA 22201 INDIA Ministry of Finance 214,067.00
PACKAGE2-SUPERVISION CONSULTANT-ADVANCED METERING INFRASTRUCTURE SUPPLY AND INSTALLATION Grant 0554 10 Aug 2018 MR.CHARLES MORRIS | NEW ZEALAND NEW ZEALAND Ministry of Finance 191,000.00

Procurement Plan

Title Document Type Document Date
Majuro Power Network Strengthening Project: Procurement Plan Procurement Plans Mar 2021