Viet Nam : Ho Chi Minh City Wastewater and Drainage System Improvement Project
The project will support Ho Chi Minh City People's Committee and their government to finance sound wastewater and drainage system in the remaining catchments, thereby strengthening its foundation as the socioeconomic growth pole of southern Viet Nam. The impact of the project will be improved surface water quality and drainage capacity in HCMC. The outcome will be increased wastewater and drainage collection and treatment capacity in key catchments in HCMC.
Project Details
-
Project Officer
Nash, Alexander D.
Southeast Asia Department
Request for information -
Country/Economy
Viet Nam -
Modality
Related Projects
Project Name | Ho Chi Minh City Wastewater and Drainage System Improvement Project | ||||
Project Number | 50107-001 | ||||
Country / Economy | Viet Nam |
||||
Project Status | Active | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
Drivers of Change | Gender Equity and Mainstreaming Governance and capacity development Partnerships Private sector development |
||||
Sector / Subsector | |||||
Gender | Effective gender mainstreaming | ||||
Description | The project will support Ho Chi Minh City People's Committee and their government to finance sound wastewater and drainage system in the remaining catchments, thereby strengthening its foundation as the socioeconomic growth pole of southern Viet Nam. The impact of the project will be improved surface water quality and drainage capacity in HCMC. The outcome will be increased wastewater and drainage collection and treatment capacity in key catchments in HCMC. Project outputs will (i) upgrade the existing combined sewer system with interceptors; (ii) construct new separate sewer pipeline systems for storm run-off and sewage, and advanced centralized wastewater treatment plants; (iii) strengthen septage management of household septic tanks by developing a desludge and collection scheme with appropriate equipment and vehicles; and (iv) capacity building and institutional strengthening of the implementing agency for medium- and long-term strategic planning for sewage and drainage, and asset construction and management skills including private sector participation, the operating agencies for operation and maintenance and climate resilient disaster management planning, and the local people for awareness raising. | ||||
Project Rationale and Linkage to Country/Regional Strategy | Ho Chi Minh City (HCMC), the largest city in Viet Nam with 8.0 million inhabitants, is the center of Viet Nam's economic activity, contributing 27% of the national gross domestic product (GDP) in 2014. Under the central government's long-term strategic vision of Socio-Economic Development Strategy (SEDS), 20112020 and its 5-year Socio-Economic Development Plans (SEDP), HCMC will remain the main engine of Viet Nam's urbanization and industrialization with its higher GDP growth rate over the national average. While HCMC's growth has been underpinned by investments on basic urban infrastructure and improved water supply system, its development stands at a turning point. Weak wastewater and drainage system has become a clear bottleneck as surface water quality of inland canals and rivers has been rapidly deteriorated, raising serious public health and environmental concerns. In HCMC, the country's typical sector problems occur at the largest scale: (i) a sewer network coverage has little improved from 12% in 1997, with only 5080% user connections even in the central districts; (ii) a sewer network predominantly uses combined collection system of sewer and storm water; (iii) only two out of twelve existing drainage catchments have the centralized wastewater treatment plants, treating less than 10% of city's domestic wastewater or only 14% of the water supplied in HCMC; and (iv) about 80% of households still rely on septic tanks with many lacking proper septage management. HCMC's low lying terrain adds technical complexities to the system adopting gravity flow for collection and transportation. Although the key regulations came into force on clarifying ownership and responsibilities of wastewater and drainage assets, and promoting financial cost recovery, weak financial basis of local governments and lack of their institutional capacity to implement the regulation cause a spiral of technical, financial and market failures in sector performance. Viet Nam's vulnerability to climate change further exacerbates the problem. HCMC is one of the 10 cities in the world likely to confront the early impacts of climate change. The projected sea-level rise of 33 centimeters (cm) by 2050 and 100 cm by 2100 is alarming for HCMC, where 4045% of the central districts are within 100 cm above sea-level. By 2050, twelve out of 14 wastewater related facilities will be inundated in regular flood events. The city's wastewater and drainage system faces challenges of rising sea-level and enhanced storm surges to control floods and mitigate sewage backflow. Since 1998, $1.1 billion (in 2005 constant price) has been provided by the government of Belgium, Japan International Cooperation Agency (JICA) and the World Bank to upgrade the wastewater and drainage system in HCMC. Their interventions have been individually effective, but less coordinated. Many catchments are still left out from the support. The city's construction Master Plan does not recognize climate risk appropriately. A large financial gap must be filled by rationalized investment planning that effectively mobilizes public and private funds. |
||||
Impact |
Project Outcome | |
---|---|
Description of Outcome | |
Progress Toward Outcome | |
Implementation Progress | |
Description of Project Outputs | |
Status of Implementation Progress (Outputs, Activities, and Issues) | |
Geographical Location | Ho Chi Minh City |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | The project is under preparation. The consulting firm was mobilized in March 2018. |
During Project Implementation | The project is under preparation. The consulting firm was mobilized in March 2018. |
Business Opportunities | |
---|---|
Consulting Services | In accordance with ADB's Guidelines on the Use of Consultants (2013, as amended from time to time), a consulting firm will be engaged, using the quality- and cost-based selection method with a quality:cost ratio of 90:10 using the full technical proposals. |
Responsible ADB Officer | Nash, Alexander D. |
Responsible ADB Department | Southeast Asia Department |
Responsible ADB Division | Urban Development and Water Division, SERD |
Executing Agencies |
Ho Chi Minh City People's Committee |
Timetable | |
---|---|
Concept Clearance | - |
Fact Finding | - |
MRM | - |
Approval | 14 Oct 2016 |
Last Review Mission | - |
Last PDS Update | 28 Mar 2018 |
TA 9205-VIE
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
14 Oct 2016 | 12 Jan 2018 | 12 Jan 2018 | 30 Sep 2019 | 31 Dec 2023 | - |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
0.00 | 5,000,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 5,000,000.00 | 29 Dec 2022 | 3,292,511.71 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
Ho Chi Minh City Wastewater and Drainage System Improvement Project: Initial Poverty and Social Analysis | Initial Poverty and Social Analysis | Oct 2016 |
Ho Chi Minh City Wastewater and Drainage System Improvement Project: Project Preparatory Technical Assistance Report | Project Preparatory Technical Assistance Reports | Oct 2016 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
Title | Document Type | Document Date |
---|---|---|
Những giải pháp thiên nhiên cho các đô thị tại Việt Nam: Thiết kế đô thị nhạy cảm về nước | Brochures and Flyers | Nov 2019 |
Nature-Based Solutions for Cities in Viet Nam: Water Sensitive Urban Design | Brochures and Flyers | Oct 2019 |
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Tender Title | Type | Status | Posting Date | Deadline |
---|---|---|---|---|
National Project Analyst and Coordination Specialist | Individual - Consulting | Closed | ||
National Wastewater and Drainage Engineer | Individual - Consulting | Closed | ||
Feasibility Study Report | Firm - Consulting | Closed |
Contracts Awarded
Contract Title | Approval Number | Contract Date | Contractor | Address | Executing Agency | Total Contract Amount (US$) | Contract Amount Financed by ADB (US$) |
---|---|---|---|---|---|---|
Project Preparatory | Technical Assistance 9205 | 02 Feb 2018 | SCE(FRANCE) in association with FCG International, FIN(FINLAND) | 5 AVENUE AUGUSTIN-LOUIS CAUCHY NANTES CE 7 FRANCE | Ho Chi Minh City People's Committee | 1,251,755.00 | — |
Procurement Plan