Bangladesh: Transport Connectivity Improvement Preparatory Facility

Sovereign (Public) Project | 50333-001 Status: Proposed

The project readiness financing (PRF) loan is proposed to advance project preparation of priority transport projects by financing feasibility study, detailed design and other preparatory works. Ensuing projects will be formed from a list of identified necessary investments which the Government has agreed, subject to agreed project selection criteria.

Project Details

Project Officer
Kaoru Kasahara South Asia Department Request for information
Country
  • Bangladesh
Sector
  • Transport
 
Project Name Transport Connectivity Improvement Preparatory Facility
Project Number 50333-001
Country Bangladesh
Project Status Proposed
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan: Transport Connectivity Improvement Preparatory Facility
concessional ordinary capital resources lending / Asian Development Fund US$ 42.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Regional integration
Drivers of Change
Sector / Subsector

Transport / Multimodal logistics

Gender Equity and Mainstreaming No gender elements
Description The project readiness financing (PRF) loan is proposed to advance project preparation of priority transport projects by financing feasibility study, detailed design and other preparatory works. Ensuing projects will be formed from a list of identified necessary investments which the Government has agreed, subject to agreed project selection criteria.
Project Rationale and Linkage to Country/Regional Strategy Bangladesh has geographic and strategic advantage to become a transport and trade hub for the South Asia Subregional Economic Cooperation (SASEC) countries, bordering India and Myanmar. Major international trade corridors run through the country. However, growth in subregional trade is slow because transport connectivity is being one of bottlenecks of both domestic and subregional transport network in Bangladesh. In parallel with the government's plan to develop land ports and intermodal transshipment facilities, facilitation of transport connectivity among different subsectors is urgently needed to realize optimized transport network, and to tap the latent strength of the country. Preparation of such projects is lagged behind actual development needs, and financial support to advance preparation of road and railway projects is needed. Hence, the PRF will support on project preparation in following areas: (i) road and rail connectivity of port, land port, and border crossing points; (ii) road and railway connectivity of intermodal transshipment facilities, including inland container depot, and inland container terminal; (iii) strengthening corridors, including bypass, connected road and alternate route; and (iv) sector wide improvement, which includes safety, traffic management, and maintenance.
Impact Critical multimodal transport links related to regional connectivity timely completed.
Outcome Preparation of multimodal transport projects advanced
Outputs

Feasibility studies and detailed design of multimodal projects completed

Implementation support for multimodal transport projects provided (during pre-construction stage)

Geographical Location Nation-wide
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services All consultant recruitments will be conducted in line with ADB Procurement Policy (2017, as amended from time to time) and Procurement Regulations for ADB Borrowers (2017, as amended from time to time).
Procurement The project will finance only consulting services to develop detailed design and other preparatory works.
Responsible ADB Officer Kaoru Kasahara
Responsible ADB Department South Asia Department
Responsible ADB Division Transport and Communications Division, SARD
Executing Agencies
Bangladesh Railway
16 Abdul Gani Road
Bangladesh Railway, Rail Bhaban,
Dhaka, Bangladesh
Chittagong Port Authority
Chittagong
Bangladesh
Roads and Highways Department
Sarak Bhaban
Tejgaon, Dhaka-1208
Bangladesh
Timetable
Concept Clearance 06 Jun 2018
Fact Finding 04 Apr 2019 to 10 Apr 2019
MRM 15 Jul 2019
Approval -
Last Review Mission -
Last PDS Update 22 Jul 2019

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

No tenders for this project were found.

Contracts Awarded

No contracts awarded for this project were found

Procurement Plan

None currently available.