Myanmar : Road Safety for Highway Development in the Greater Mekong Subregion East-West Economic Corridor

Sovereign Project | 50381-007

The proposed transaction technical assistance (TRTA) will support the Government of Myanmar to develop a systematic and practical approach for road safety in the Greater Mekong Subregion (GMS) East-West Economic Corridor Bago-Kyaikto existing national highway of about 90 kilometers (km). The TRTA also aims to help the Government to establish initial foundation for a sustainable and systematic road safety regime. The outcome of the proposed project, is more efficient and safer movement of goods and people between Bago and Kyaikto, along the GMS EWEC.

The proposed TRTA is anchored to the proposed GMS: EWEC Highway Development Project that will be designed through the ongoing TA. TA 9314's one key output is to design the ensuing project of a new road alignment of the 70-km New Bago-Kyaikto Highway, deepening the connectivity of the corridor. The TA is included in the proposed Country Operations and Business Plan: Myanmar, 2019-2021.

Project Details

  • Project Officer
    Islam, Mohammad Nazrul
    Southeast Asia Department
    Request for information
  • Country/Economy
    Myanmar
  • Sector
    • Transport
Project Name Road Safety for Highway Development in the Greater Mekong Subregion East-West Economic Corridor
Project Number 50381-007
Country / Economy Myanmar
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 9743-MYA: Road Safety for Highway Development in the Greater Mekong Subregion East-West Economic Corridor
Japan Fund for Prosperous and Resilient Asia and the Pacific US$ 999,950.00
Strategic Agendas Inclusive economic growth
Regional integration
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Knowledge solutions
Partnerships
Sector / Subsector

Transport / Road transport (non-urban)

Gender Effective gender mainstreaming
Description

The proposed transaction technical assistance (TRTA) will support the Government of Myanmar to develop a systematic and practical approach for road safety in the Greater Mekong Subregion (GMS) East-West Economic Corridor Bago-Kyaikto existing national highway of about 90 kilometers (km). The TRTA also aims to help the Government to establish initial foundation for a sustainable and systematic road safety regime. The outcome of the proposed project, is more efficient and safer movement of goods and people between Bago and Kyaikto, along the GMS EWEC.

The proposed TRTA is anchored to the proposed GMS: EWEC Highway Development Project that will be designed through the ongoing TA. TA 9314's one key output is to design the ensuing project of a new road alignment of the 70-km New Bago-Kyaikto Highway, deepening the connectivity of the corridor. The TA is included in the proposed Country Operations and Business Plan: Myanmar, 2019-2021.

Project Rationale and Linkage to Country/Regional Strategy

Based on the latest available road crash data (2013), Myanmar's road fatality rate is the third worst in Southeast Asia, at 20 fatalities per 100,000 inhabitants, which doubled since 2004. Based on the latest data from National Police for 2017 road crash fatalities, when estimated for errors, indicates that the fatality rate is 30. Nearly 60% of road casualties are softer modes: motorcyclists, cyclists, and pedestrians. Female road related fatalities account for 25 percent. As in any country, developed or developing, majority of road fatalities is due to human behavior, not road environment or engineering. Myanmar suffers a loss of 1.5% of its gross domestic product annually due to road crashes.

Ideally, as achieved by developed nations, to change road user behavior, education and enforcement need to be strengthened and sustained over about two decades. However, this faces a severe challenge since such systematic policy has not yet been formulated or implemented. Key issues to be considered for a systematic policy are: (i) inadequate school curriculum on road safety; (ii) lack of road safety programs; (iii) lack of focused education by driving schools to obtain driver license and absence of a streamlined licensing system; (iv) inadequate capacity of police; (v) lack of police force for enforcement thus lack of enforcement; (vi) absence of critical mass of local expertise; (vii) lack of road worthiness testing of vehicles; and (viii) inadequate funding. From a road engineering aspect, expressways and highways are unsafe with no access control; all road users (humans, vehicles), and animals share the road space with limited discipline. To aggravate these challenges, road crash data compiled by the police are only about 30% accurate so effective road safety policies are difficult to be formulated.

The National Road Safety Council (NRSC) was established in 2017 with participation of all key relevant stakeholders like the Ministry of Construction, Ministry of Transport and Communications, National Police, Ministry of Education etc. The NRSC needs capacity improvements to function efficiently and remedy road safety issues Myanmar is facing, in a systematic manner.

Based on the foregoing, the proposed TRTA intends to establish an initial foundation for a systematic approach for practically remedying the road safety issues in Myanmar long term. From a development assistance point of view, the proposed TRTA is timely and useful in filling these gaps to achieve its intended objective.

Impact
Project Outcome
Description of Outcome
Progress Toward Outcome
Implementation Progress
Description of Project Outputs
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Bago, Kyaikto
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services It is proposed that the consulting services contract be on performance based, as a lump sum contract. It is expected that the consultants will engage service providers for surveys, and for overseas training activities as required. The consultants will be engaged by ADB in accordance with the ADB Procurement Policy (2017, as amended from time to time) and its associated project administration instructions and/or staff instructions.
Procurement Procurement is not required.
Responsible ADB Officer Islam, Mohammad Nazrul
Responsible ADB Department Southeast Asia Department
Responsible ADB Division Transport and Communications Division, SERD
Executing Agencies
Ministry of Construction
Timetable
Concept Clearance -
Fact Finding -
MRM -
Approval 27 May 2019
Last Review Mission -
Last PDS Update 11 Oct 2018

TA 9743-MYA

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
27 May 2019 11 Jul 2019 11 Jul 2019 30 Apr 2021 - 08 May 2023
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
0.00 999,950.00 0.00 0.00 0.00 0.00 999,950.00 24 May 2023 220,133.89

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.


Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.


Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Road Safety for Highway Development in the Greater Mekong Subregion East-West Economic Corridor Firm - Consulting Closed

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
Project Preparatory Technical Assistance 9743 13 Nov 2019 DONGSUNG Engineering Co., Ltd. (KOREA, REPUBLIC OF) in association with Ilshin E&C Co., Ltd. (KOREA, REPUBLIC OF) | 24, Yangjae-daero 62-gil, Songpa-gu Seoul 05711, Korea, Republic of Ministry of Construction 922,275.00

Procurement Plan

None currently available.