Pakistan: Sustainable National Highway 5 Rehabilitation Project

Sovereign (Public) Project | 50389-001 Status: Dropped / Terminated

The proposed project will finance the rehabilitation of multiple sections of the national highway 5 (N-5) totaling about 822 kilometers (km) of carriageway. It will also support the institutional development of the National Highway Authority, to sustain national highway network conservation and improve road safety.

Project Details

Project Officer
Ning, Jiangbo Central and West Asia Department Request for information
Country
  • Pakistan
Sector
  • Transport
 
Project Name Sustainable National Highway 5 Rehabilitation Project
Project Number 50389-001
Country Pakistan
Project Status Dropped / Terminated
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan: Sustainable National Highway Rehabilitation and Improvement Project
Ordinary capital resources US$ 311.70 million
concessional ordinary capital resources lending / Asian Development Fund US$ 33.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Regional integration
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Sector / Subsector

Transport / Road transport (non-urban)

Gender Equity and Mainstreaming Some gender elements
Description The proposed project will finance the rehabilitation of multiple sections of the national highway 5 (N-5) totaling about 822 kilometers (km) of carriageway. It will also support the institutional development of the National Highway Authority, to sustain national highway network conservation and improve road safety.
Project Rationale and Linkage to Country/Regional Strategy

Pakistan's transport sector contributes about 10% to the GDP and accounts for over 6% of employment in the country. Road transport dominates Pakistan's transport system, accounting for almost 95% of freight traffic in ton-kilometers and 90% of passenger traffic in passenger-kilometers. Upgrading Pakistan's transportation system is critical to both export competitiveness and economic growth. The national highway network is a crucial driver of the economy and forms the backbone of the transportation system, serving as main interprovincial linkages and connections to neighboring countries. Although its total length is only 12,739 km and 4.8% of the total length of Pakistan's road network of 264,000 km, the national highway network caters to about 80% of commercial traffic. About 45% of national highways remain in poor service condition because of rapid traffic growth, significant increases in vehicle axle loads, and chronic maintenance neglect. Previous governments have also favored capital construction over maintenance. Despite enormous highway investments since 2013, NHA continues to face challenges in conserving a national highway network that suffers large maintenance backlogs, high transport costs, and poor safety standards.

The National Highway 5 (N-5), an 1819-km road artery and part of the broader north-south transport corridor, is the lifeline for Pakistan economy linking the port of Karachi to Peshawar and the Afghan border, via almost all of the country's main population and economic centers of Hyderabad, Multan, Lahore, Gujranwala, Rawalpindi, Islamabad and onward to Afghanistan at Torkham. N-5 alone carries about 60% of the country's commercial traffic and over 55% of the country's inter-city traffic, interlinking with CAREC and CPEC. Its safety and efficiency improvement will greatly boost the synergy of the CAREC Corridors and CPEC, enabling Pakistan to play a greater role as a regional transport and trade hub.

Impact Modernization of transport infrastructure and greater regional connectivity to support a vibrant and growing economy.
Project Outcome
Description of Outcome Improved road safety and efficiency along the North-South Transport Corridor
Progress Toward Outcome
Implementation Progress
Description of Project Outputs

Key sections of N-5 rehabilitated.

Road safety capacity of NHA strengthened.

Network conservation capacity of NHA strengthened

Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Nation-wide
Safeguard Categories
Environment B
Involuntary Resettlement B
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects The project will likely have temporary and site-specific environmental impacts such as traffic disruptions and occupational health and safety during construction phase. The project is contained within existing right-of-way and does not pass through any environmentally sensitive areas. Adequate mitigation measures are included in, and will be implemented through, an environmental management plan.
Involuntary Resettlement All works will be conducted within the existing right of way. Due diligence of field visits confirmed that while there are some encroachments to the right of way in a few sections of N-5, impacts on these structures can be avoided with minor adjustments to the rehabilitation works. Such flexibility will be indicated in the civil works contracts and will be closely monitored during implementation.
Indigenous Peoples The project road is located in the settled areas of Khyber Pakhtunkhwa, Punjab and Sindh Provinces, where no indigenous peoples as defined under ADB's Safeguard Policy Statement reside.
Stakeholder Communication, Participation, and Consultation
During Project Design Focus group discussions, community mobilization, in-depth interviews and consultations were conducted during project design and preparation.
During Project Implementation Consultations with all stakeholders will be planned and organized during project implementation.
Business Opportunities
Consulting Services Consulting services to be funded by ADB loan will be guided by the Procurement Regulations for ADB Borrowers (2017, as amended from time to time) and ADB''s prior review.
Procurement Procurement of civil works and consulting services financed under the ADB loan will be done in accordance with ADB''s Procurement Policy (2017, as amended from time to time) and ADB''s Procurement Regulations for ADB Borrowers (2017, as amended from time to time).
Responsible ADB Officer Ning, Jiangbo
Responsible ADB Department Central and West Asia Department
Responsible ADB Division Transport and Communications Division, CWRD
Executing Agencies
National Highway Authority
Room No. 110, 1st Floor,
NC Building, Sector G-9/1
Islamabad, Pakistan
Timetable
Concept Clearance 19 Sep 2017
Fact Finding 27 Jun 2018 to 11 Jul 2018
MRM 19 Jul 2020
Approval -
Last Review Mission -
Last PDS Update 27 Sep 2018

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

No tenders for this project were found.

Contracts Awarded

No contracts awarded for this project were found

Procurement Plan

None currently available.