Papua New Guinea : Health Services Sector Development Program, Subprogram 1

Sovereign Project | 51035-001

The Health Services Sector Development Program (HSSDP) will help Papua New Guinea (PNG) strengthen health services through policy reforms and direct investments in health systems. A diagnostic assessment of the coverage, financing, and quality of health services is required to ensure that the interventions are designed for maximum impact.

Project Name Health Services Sector Development Program, Subprogram 1
Project Number 51035-001
Country / Economy Papua New Guinea
Project Status Active
Project Type / Modality of Assistance Grant
Loan
Source of Funding / Amount
Loan 3664-PNG: Health Services Sector Development Program
Ordinary capital resources US$ 100.00 million
Loan 3665-PNG: Health Services Sector Development Program
Ordinary capital resources US$ 45.10 million
Loan 3666-PNG: Health Services Sector Development Program
Concessional ordinary capital resources lending US$ 49.90 million
Grant 0648-PNG: Health Services Sector Development Program, Subprogram 1 (Additional Financing)
Government of Australia US$ 38.00 million
Strategic Agendas Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Partnerships
Sector / Subsector

Health / Health sector development and reform

Public sector management / Public expenditure and fiscal management

Gender Equity and Mainstreaming Effective gender mainstreaming
Description The Health Services Sector Development Program (HSSDP) will help Papua New Guinea (PNG) strengthen health services through policy reforms and direct investments in health systems. A diagnostic assessment of the coverage, financing, and quality of health services is required to ensure that the interventions are designed for maximum impact.
Project Rationale and Linkage to Country/Regional Strategy The HSSDP will contribute to the achievement of the National Health Plan (NHP) (2011 to 2020) and the Development Strategic Plan (2010 to 2030). In particular, the HSSDP aims to improve national public expenditure management and strengthen health systems. The HSSDP builds upon ADB's long-term in-country engagement in both the health sector and public finance management (PFM).
Impact

Affordable, accessible, equitable, and high-quality health services for all citizens developed (National Health Plan 2011 to 2020).

Project Outcome
Description of Outcome

A more sustainable and efficient healthcare system achieved

Progress Toward Outcome Construction work on sites where contracts have been awarded remains largely on track.
Implementation Progress
Description of Project Outputs

National frameworks and PFM enhanced

Subnational health system management strengthened

Health service delivery components strengthened

Status of Implementation Progress (Outputs, Activities, and Issues)

Revised Catalogue published and uploaded to mSupply

Publication of the Regulations for the Provincial Health Authorities Act, 2007 will enshrine the requirement for PHAs to form Partnership Committees to formally engage with other health service providers and stakeholders at the Provincial level. A standard charter and terms of reference has been developed. Nine PHAs were supported to establish partnership committees.

Contracts awarded for 1 Level 4 and 2 Level 3 facilities. Safeguards requirements well advanced for another Level 4 and 3 Level 3s

A review of the mSupply inventory management system and current procurement, warehousing and distribution processes has been completed. A comprehensive stocktake of all Area Medical Stores was conducted during March 2021 in order to establish a baseline for usable stock. Revision of Standard Operating Procedures (SOPs) has been completed.

Point of service data entry and reporting is available in 19 provinces with national rollout expected to be completed during Q2 2022.

EOC curriculum under revision

National Health Service Standards 2011 reviewed and revised edition endorsed by the NDoH SEM in April 2021 and by the National Health Board in June 2021; Clinical Governance Framework for provincial health authorities developed and endorsed by NDoH SEM; Patient Referral Guidelines completed and being rolled-out; National Infection Prevention and Control Guidelines rewritten and endorsed by NDoH SEM, WHO is funding publication; Strategic Health Service Development Plans developed; draft Manual for the Governance & Management of Provincial Health Authorities in PNG developed and will be refined by PHA executives prior to seeking endorsement and presentation to Boards and management teams of the PHAs; Public Finance Management modules for PHAs drafted and endorsed by NDOH SEM.

The National Health Plan 2021-2030 has been developed and is now endorsed by the National Health Board and NEC, printed and published. Implementation costing was facilitated by the Nossal Institute through its contract with HSSDP and was completed on 28 May 2021. The cost of K42.7 million over the life of the Plan has now been accepted.

Target achieved

There is at least 1 woman representing women's groups on every Board; some have 2 or 3

PFM Consultant engaged since February, 2020. Currently developing PFM modules for PHA Manual and training materials in conjunction with DoF and NDoH Officers

All 22 PHAs established by January 2020.

Geographical Location Nation-wide
Safeguard Categories
Environment B
Involuntary Resettlement C
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects

An environmental assessment and review framework for the sector

Project will be developed and at least one environmental assessment of a subproject identified during preparation. The framework will comply with the Safeguard Policy Statement (SPS) 2009, as well as national laws and requirements relating to environmental assessment, to facilitate compliance with environmental requirements during project implementation.

Involuntary Resettlement The project will have minimal or no adverse social impacts.
Indigenous Peoples The project will have minimal or no adverse social impacts.
Stakeholder Communication, Participation, and Consultation
During Project Design

Stakeholder and beneficiary consultations will be initiated during TRTA, which will lead to stakeholder engagement

and participation plan(s).

During Project Implementation A program and reform steering committee will bring together key stakeholders from government institutions and development partners. Project component designs and individual policy reforms are based on or will incorporate feedback from consultations with identified stakeholder groups, led by the responsible implementing agencies. Participatory capacity, human resource development, and training needs assessments will be conducted at the institutional level.
Business Opportunities
Consulting Services All consultants will be recruited according to ADB's Guidelines on the Use of Consultants.
Procurement Any procurement of equipment or consulting services will conform with ADB's Procurement Guidelines.
Responsible ADB Officer Mikkelsen-Lopez, Inez
Responsible ADB Department Pacific Department
Responsible ADB Division PASP
Executing Agencies
Department of Treasury
Timetable
Concept Clearance 31 May 2017
Fact Finding 05 Dec 2017 to 13 Dec 2017
MRM 02 Mar 2018
Approval 31 May 2018
Last Review Mission -
Last PDS Update 30 Aug 2022

Grant 0648-PNG

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
14 Jun 2019 21 Jun 2019 12 Aug 2019 30 Sep 2025 30 Sep 2027 -
Financing Plan Grant Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 38.00 Cumulative Contract Awards
ADB 0.00 24 Jan 2023 0.00 17.53 46%
Counterpart 0.00 Cumulative Disbursements
Cofinancing 38.00 24 Jan 2023 0.00 7.44 20%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - Satisfactory Satisfactory Satisfactory - Satisfactory

Loan 3664-PNG

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
31 May 2018 13 Jun 2018 18 Jul 2018 30 Oct 2018 - 03 Apr 2019
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 100.00 Cumulative Contract Awards
ADB 100.00 24 Jan 2023 100.00 0.00 100%
Counterpart 0.00 Cumulative Disbursements
Cofinancing 0.00 24 Jan 2023 100.00 0.00 100%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - Satisfactory Satisfactory Satisfactory - Satisfactory

Loan 3665-PNG

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
31 May 2018 13 Jun 2018 18 Jul 2018 30 Nov 2025 30 Sep 2027 -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 54.60 Cumulative Contract Awards
ADB 45.10 24 Jan 2023 27.23 0.00 60%
Counterpart 9.50 Cumulative Disbursements
Cofinancing 0.00 24 Jan 2023 14.51 0.00 32%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - Satisfactory Satisfactory Satisfactory - Satisfactory

Loan 3666-PNG

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
31 May 2018 13 Jun 2018 18 Jul 2018 30 Nov 2025 30 Sep 2027 -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 49.90 Cumulative Contract Awards
ADB 49.90 24 Jan 2023 19.65 0.00 39%
Counterpart 0.00 Cumulative Disbursements
Cofinancing 0.00 24 Jan 2023 12.66 0.00 25%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - Satisfactory Satisfactory Satisfactory - Satisfactory

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Health Services Sector Development Program, Subprogram 1: Audited Project Financial Statements (January-December 2021) Audited Project Financial Statements Apr 2022
Health Services Sector Development Program: Procurement Plan Procurement Plans Feb 2022
Health Services Sector Development Program, Subprogram 1: Audited Project Financial Statements (January-December 2020) Audited Project Financial Statements Jul 2021
Health Services Sector Development Program, Subprogram 1: Audited Project Financial Statements (18 July 2018-31 December 2019) Audited Project Financial Statements Dec 2020
Helt Sevis sekta Divelopmen Program, Sab program 1 : Projek Rekot Pepa Translated PDS Jun 2018
Loan Agreement (Ordinary Operations) for Loan 3664-PNG: Health Services Sector Development Program, Subprogram 1 Loan Agreement (Ordinary Resources) Jun 2018
Loan Agreement (Ordinary Operations) for Loan 3665-PNG: Health Services Sector Development Program Loan Agreement (Ordinary Resources) Jun 2018
Loan Agreement (Ordinary Operations [Concessional]) for Loan 3666-PNG: Health Services Sector Development Program Loan Agreement (Ordinary Resources) Jun 2018
Health Services Sector Development Program, Subprogram 1: Report and Recommendation of the President Reports and Recommendations of the President Apr 2018
Health Services Sector Development Program, Subprogram 1: Gender Action Plan Gender Action Plans Apr 2018
Health Services Sector Development Program: Project Administration Manual Project/Program Administration Manual Mar 2018
Health Services Development Program: Initial Poverty and Social Analysis Initial Poverty and Social Analysis Jan 2018
Health Services Sector Development Program, Subprogram 1: Technical Assistance Report Technical Assistance Reports May 2017

Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Health Services Sector Development Program, Subprogram 1: Environmental and Social Monitoring Report (January-June 2022) Environmental and Social Monitoring Reports Jun 2022
Health Services Sector Development Program, Subprogram 1: Environmental and Social Monitoring Report (July-December 2021) Environmental and Social Monitoring Reports Dec 2021
Health Services Sector Development Program, Subprogram 1: Environmental and Social Monitoring Report (January-June 2021) Environmental and Social Monitoring Reports Jun 2021
Health Services Sector Development Program, Subprogram 1: Environmental and Social Monitoring Report (July-December 2020) Environmental and Social Monitoring Reports Dec 2020
Health Services Sector Development Program: Bitokara Community Health Post Subproject Social Safeguards Due Diligence Report Safeguards Due Diligence Reports Jul 2020
Health Services Sector Development Program: Gloucester Health Centre Subproject Social Safeguards Due Diligence Report Safeguards Due Diligence Reports Jul 2020
Health Services Sector Development Program: Bogia District Hospital Subproject Social Safeguards Due Diligence Report Safeguards Due Diligence Reports Jul 2020
Health Services Sector Development Program, Subprogram 1: Environmental and Social Monitoring Report (January-June 2020) Environmental and Social Monitoring Reports Jun 2020
Health Services Sector Development Program: Social Monitoring Report (January-December 2019) Social Monitoring Reports Dec 2019
Health Services Sector Development Program: Bialla District Hospital Subproject Draft Initial Environmental Examination Initial Environmental Examination Jan 2018
Health Services Sector Development Program: Environmental Assessment and Review Framework Environmental Assessment and Review Framework Jan 2018
Health Services Sector Development Program: Indigenous Peoples Planning Framework Indigenous Peoples Planning Frameworks/Indigenous Peoples Development Frameworks Jan 2018
Health Services Sector Development Program: Land Acquisition and Resettlement Framework Resettlement Frameworks Jan 2018

Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Clinical Governance and Health Standards Specialist Individual - Consulting Closed
Deputy Project Manager - Health System Strengthening Individual - Consulting Closed
Public Finance Management Specialist Individual - Consulting Closed
Clinical and Public Health Service Planning Specialist Individual - Consulting Closed
Implementation of PHASE 2 of the PNG electronic National Health Information System Firm - Consulting Closed
Public Finance Management Specialist Individual - Consulting Closed
HEALTH SYSTEMS INFORMATION SPECIALIST Individual - Consulting Closed
Performance Monitoring and Evaluation Firm - Consulting Closed
Strengthening Medical Supplies Procurement and Supply Chain Management Firm - Consulting Closed
Health Economist Individual - Consulting Closed
Medical Supplies Procurement & Supply Chain Specialist Individual - Consulting Closed
Environment Specialist Individual - Consulting Closed
CLINICAL GOVERNANCE AND STANDARDS SPECIALIST Individual - Consulting Closed
Architect Individual - Consulting Closed
Service Planning & Partnership Specialist Individual - Consulting Closed
Social Safeguards, Health Promotion & Gender Specialist Individual - Consulting Closed

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
Construction and Completion of Gloucester Health Centre-Stage II at Gloucester in Kendrian-Gloucester District of West New Britain Province Loan 3666 06 Feb 2023 PNG Forest Products Ltd. | P.O. Box 1357 Boroko Department of Health 2,836,899.90 2,832,909.37
Construction and Completion of Gloucester Health Centre-Stage I at Gloucester in Kendrian-Gloucester District of West New Britain Province Loan 3666 06 Feb 2023 PNG Forest Products Ltd. | P.O. Box 1357 Boroko Department of Health 2,665,443.77 2,661,694.42
Construction of Warasikau Community Health Post in Nuku District of West Sepik Province Grant 0648 06 Jan 2023 Son of Roy Ltd. | P.O. Box 1636 - Vision City, NCD Department of Treasury 1,329,173.79
Construction Supervisor (1 Aug 2022 to 30 Jun 2025) Loan 3665 08 Jul 2022 Martin Tauvasa | Kimbe, West New Britain Department of Health 244,026.98 244,026.98
Construction of Agevairu Health Centre - Stage I in Kairuku-Hiri District Loan 3665 08 Jul 2022 Haom Builders Ltd | Lae, Morobe Department of Health 2,600,394.54 2,600,394.54
Construction of Agevairu Health Centre - Stage II in Kairuku-Hiri District Loan 3665 08 Jul 2022 Haom Builders Ltd | Lae, Morobe Department of Health 2,792,227.13 2,792,227.13
Construction and Completion of Clinical and Service Buildings (Administrative Building, Mother's Waiting House, Guardian Amenities Block, Maintenance Workshop Block, Morgue and Incinerator Block) for Pomio District Hospital - Stage VI Loan 3666 16 Mar 2022 Pacific Development Contractors, Ltd | 20 Hoskins Highway, Kimbe, P.O. Box 435 Kimbe, West New Britain Department of Health 1,383,041.28 1,351,387.26
Construction and Completion of Bogia District Hospital - Stage I at Daigul in Bogia District of Madang Province Loan 3666 25 Oct 2021 R & Sons Constructions Ltd. | Eight Mile, Okuk Highway P.O. Box 833, Lae 411, Morobe Department of Health 1,269,039.48 1,269,039.48
Construction and Completion of Pomio District Hospital-Stage V at Palmalmal in Pomio District Loan 3666 18 Aug 2021 Pacific Development Contractors, Ltd | 20 Hoskins Highway, Kimbe P.O. Box 435, Kimbe, West New Britain Department of Health 1,254,112.62 1,254,112.62
Construction and Completion of Community Health Post at Gaulim in Gazelle District of East New Britain Province Grant 0648 02 Aug 2021 Haom Builders Ltd | P O Box 797 Lae Morobe Province Department of Treasury 1,290,291.12
Supply and Delivery of Medical Equipment for Kopia Health Centre in Lake Kopiago-Koroba District of Hela Province Grant 0648 09 Aug 2021 Premier Biomedical Engineering Ltd | 1 Kalang Lane Yowie Bay NSW 228 Department of Treasury 1,292,242.75
SUPPLY AND DELIVERY OF MEDICAL EQUIPMENT FOR AMBUNTI HEALTH CENTRE IN AMBUNTI-DREKIKIER DISTRICT OF EAST SEPIK PROVINCE Loan 3665 08 Jun 2021 PREMIER BIOMEDICAL ENGINEERING LTD | 1 KALANG LANE, YOWIE BAY NSW 228 AUSTRALIA Department of Treasury 1,312,068.47 1,284,483.76
CONSTRUCTION AND COMPLETION OF 9 STAFF HOUSES FOR AMBUNTI HEALTH CENTRE - STAGE IV IN AMBUNTI- DREKIKIER DISTRICT OF EAST SEPIK PROVINCE Loan 3666 10 May 2021 PACIFIC DEVELOPMENT CONTRACTORS, LTD. | 20 HOSKINS HIGHWAY, KIMBE P.O. BOX 435, KIMBE, WEST NEW BRITAIN PAPUA NEW GUINEA Department of Treasury 1,179,378.03 1,149,551.73
CONSTRUCTION AND COMPLETION OF BITOKARA COMMUNITY HEALTH POST AT BITOKARA IN TALASEA DISTRICT Grant 0648 22 Apr 2021 PACIFIC DEVELOPMENT CONTRACTORS LTD. | 20 HOSKINS HIGHWAY KIMBE PO BOX 435 KIMBE WEST NEW BRITAIN PAPUA NEW GUINEA Department of Treasury 1,308,464.14
CONSTRUCTION AND COMPLETION OF STAFF HOUSES FOR PO MIO DISTRICT HOSPITAL - STAGE III AT PALMALMAL IN POMIO DISTRICT OF EAST NEW BRITAIN PROVINCE Loan 3666 02 Oct 2020 PACIFIC DEVELOPMENT CONTRACTORS LTD. | 20 HOSKINS HIGHWAY, KIMBE, PO BOX 435 KIMBE, WEST NEW BRITAIN PAPUA NEW GUINEA Department of Treasury 1,244,459.71 1,244,459.71
CONSTRUCTION AND COMPLETION OF STAFF HOUSES FOR P OMIO DISTRICT HOSPITAL - STAGE IV AT PALMALMAL IN POMIO DISTRICT OF EAST NEW BRITAIN PROVINCE Loan 3666 02 Oct 2020 PACIFIC DEVELOPMENT CONTRACTORS LTD. | 20 HOSKINS HIGHWAY, KIMBE, PO BOX 435 KIMBE, WEST NEW BRITAIN, PNG PAPUA NEW GUINEA Department of Treasury 1,247,211.16 1,247,211.16
CONSTRUCTION AND COMPLETION OF STAFF HOUSES FOR PO MIO DISTRICT HOSPITAL - STAGE II AT PALMALMAL IN P OMIO DISTRICT OF EAST NEW BRITAIN PROVINCE Loan 3666 02 Oct 2020 PACIFIC DEVELOPMENT CONTRACTORS, LTD | 20 HOSKINS HIGHWAY, KIMBE, PO BOX 435 KIMBE, WEST NEW BRITAIN, PNG PAPUA NEW GUINEA Department of Treasury 1,236,459.55 1,236,459.55
CONSTRUCTION OF UMBA COMMUNITY HEALTH POST IN MENYAMYA DISTRICT MOROBE Grant 0648 28 Oct 2020 PNG FOREST PRODUCTS LTD | PO BOX 1357 BOROKO PAPUA NEW GUINEA Department of Treasury 1,395,369.18
CSF-01 PERFORMANCE MONITORING AND EVALUATION Loan 3665 21 May 2020 CARDNO EMERGING MARKETS (AUSTRALIA) PTY LTD | LEVEL 4, 501 SWANSTON ST MELBOURNE, VICTORIA, 3000 AUSTRALIA Department of Treasury 1,200,000.00 1,200,000.00
IMPLEMENTATION OF PHASE 2 OF THE PNG ELEC TRONIC NATIONAL HEALTH INFORMATION SYSTEM Loan 3665 25 Mar 2020 PNG REMOTE SENSING CENTER LTD. | PORT MPORESBY PAPUA NEW GUINEA Department of Treasury 4,848,097.10 4,848,097.10
CONSTRUCTIONOF KOPIAGO HEALTH CETRE -STAGE III IN LAKE KOPIAGO-KOROBA DISTRICT Grant 0648 21 Jan 2020 LAPWING CONSTRUCTIONS LTD. | SECT 453 LOT 36 HOHOLA PO BOX 8864 BOROKO NCD PAPUA NEW GUINEA Department of Treasury 1,437,199.05
CONSTRUCTION AND COMPLETION OF HEALTH CETRE - STAGE IV AT KOPIAGO IN LAKE KOPIAGO-KOROBA Grant 0648 21 Jan 2020 LAPWING CONSTRUCTIONS LTD. | SECT 453 LOT 36 HOHOLA PO BOX 8864 BOROKO NCD PAPUA NEW GUINEA Department of Treasury 1,314,142.47
CONSTRUCTION AND COMPLETION OF HEALTH CENTER - STAGE II - KOPIAGO IN LAKE KOPIAGO-KOROBA DISTRICT Grant 0648 21 Jan 2020 LAPWING CONSTRUCTIONS LTD. | SECT 453 LOT 36 HOHOLA PO BOX 8864 BOROKO NCD PAPUA NEW GUINEA Department of Treasury 1,421,443.07
PRANITA SHARMA - PUBLIC FINANCIAL MANAGEMENT Grant 0648 13 Dec 2019 PRANITA SHARMA | 77 HASELMERE CIRCUS ROCKINGHAM PERTH WESTERN AUSTRALIA 6168 AUSTRALIA Department of Treasury 615,214.50
PETER BARAN - HEALTH SECTOR ORGANIZATION AND PEOPLE DEVELOPMENT Grant 0648 01 Aug 2019 PETER BARAN | 18 ARMFIELD PLACE CHISHOLM ACT 2905 AUSTRALIA Department of Treasury 1,016,883.96
KELWYN CRAIG BROWNE - HEALTH PROMOTION, SOCIAL SAFEGUARD AND GENDER SPECIALIST 21 JANUARY 2019 TO 31 JULY 2023 Loan 3665 17 Jan 2019 KELWYN CRAIG BROWNE | 1181 BOOYONG ROAD, CLUNES NSW 2480 AUSTRALIA Department of Treasury 692,257.00 692,257.02
TREVOR RONALD GOWLAND - SERVICE PLANNING AND PARTNERSHIP SPECIALIST (21 JANUARY 2019 TO 30 SEPTEMBER 2023) Loan 3665 17 Jan 2019 TREVOR RONALD GOWLAND | 31 WANDOO COURT MULWALA NEW SOUTH WALES AUSTRALIA Department of Treasury 493,997.00 493,996.97
PRAGATI BASNET - ARCHITECT (DESIGN, CONSTRUCTION AND CONTRACT MANAGEMENT (3 DECEMBER 2018 TO 30 SEPTEMBER 2023 Loan 3665 16 Jan 2019 PRAGATI BASNET | LAGANKHEL-5, LALITPUR KATHMANDU VALLEY NEPAL Department of Treasury 1,111,439.00 1,111,438.77
VICKIASSENHEIM - CLINICAL GOVERNANCE AND STANDARDS SPECIALIST 3 DECEMBER 2018 TO 30 SEPTEMBER 2023 Loan 3665 16 Jan 2019 VICKI ASSENHEIM | 1/69 CHERMSIDE ST., TENERIFFE QLD AUSTRALIA AUSTRALIA Department of Treasury 1,089,422.00 1,089,449.64
JIM KIRE DOPO - ENVIRONMENT SPECIALIST-NATIONAL Loan 3665 29 May 2019 JIM KIRE DOPO | BOROKO, NCD PORT MORESBY PAPUA NEW GUINEA Department of Treasury 147,602.24 147,552.32
RONALD EDWARD HICKEY, HEALTH SYSTEMS INFORMATION SPECIALIST Loan 3665 15 Aug 2019 RONALD EDWARD HICKEY | 39 PROMENADE AVENUE ROBINA GOLD COAST, QUEENSLAND AUSTRALIA Department of Treasury 393,476.00 393,268.78
MISPAH MURO - CONSTRUCTION SUPERVISOR (NATIONAL) Loan 3665 16 Aug 2019 MISPAH MURO | PORT MORESBY, NCD PAPUA NEW GUINEA Department of Treasury 147,058.56 146,808.88
MARC LEWARCA CONSTRUCTION SUPERVISOR (NATIONAL) Loan 3665 16 Aug 2019 MARC LEWARAKA | PORT MORESBY, NCD PAPUA NEW GUINEA Department of Treasury 147,058.56 146,808.88
PEMRAJ GONSALKORALE, MEDICAL SUPPLIES PROCUREMENT AND SUPPLY CHAIN SPECIALIST Loan 3665 02 Sep 2019 PEMRAJ GONSALKORALE | 3304/1 ALEXANDRA DRIVE CAMPERDOWN, NSW 2050 AUSTRALIA Department of Treasury 153,242.99 153,242.99
MR. KENNEDY KALMET - ARCHITECTURE DRAFTING Loan 3665 02 Sep 2019 KENNEDY KALMET | FIG ST. HOHOLA STAGE 2 PORT MORESBY NORTH-WEST NCD PAPUA NEW GUINEA Department of Treasury 146,941.18 146,941.18
STRENGTHENING MEDICAL SUPPLIES PROCUREMENT AND SUPPLY CHAIN MANAGEMENT Loan 3665 14 Nov 2019 AGILITY LTD., PAPUA NEW GUINEA | PORTION 2508C OF GRANVILLE, NAPA NAPA RD PORT MORESBY NCD 121 PAPUA NEW GUINEA Department of Treasury 1,866,877.10 1,866,877.10
PROJECT MANAGER Loan 3665 05 Nov 2018 ROBERT CHARLES AKERS | 2 MACADAMIA COURT BUSHLAND BEACH QUEENSLAND AUSTRALIA Department of Treasury 1,441,554.00 1,440,298.00
PROCUREMENT AND FINANCE SPECIALIST Loan 3665 05 Nov 2018 NANDA MAHARJAN | LAGANKHEL -5, LALITPUR KATHMANDU VALLEY NEPAL Department of Treasury 1,413,318.00 1,411,735.00

Procurement Plan

Title Document Type Document Date
Health Services Sector Development Program: Procurement Plan Procurement Plans Feb 2022