China, People's Republic of : Yangtze River Green Ecological Corridor Comprehensive Agriculture Development
The proposed project will strengthen rural livelihoods, especially the rural poor who rely most on natural resources as the basis for their primary source of income, to modernize their agriculture production systems and minimize environmental degradation and nonpoint source (NPS) pollution. The proposed project will be implemented in five provinces and one municipality in the upper and middle reaches of the Yangtze River Basin, notably Yunnan, Sichuan, Guizhou, Chongqing, Hunan, and Hubei. The project area consists of 48 counties, which are characterized by the prevalence of low and medium agriculture productivity; high risk and occurrence of soil erosion; high levels of agriculture NPS pollution; lack of irrigation systems; limited farm access roads; and are in need for modernization and were selected for inclusion in the project based on geographical, financial, environmental and social criteria.
Project Details
-
Project Officer
Robertson, Suzanne Kay
East Asia Department
Request for information -
Country/Economy
China, People's Republic of -
Modality
-
Sector
- Agriculture, natural resources and rural development
Project Name | Yangtze River Green Ecological Corridor Comprehensive Agriculture Development | ||||
Project Number | 51116-001 | ||||
Country / Economy | China, People's Republic of |
||||
Project Status | Proposed | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
Drivers of Change | Governance and capacity development Knowledge solutions Partnerships |
||||
Sector / Subsector | Agriculture, natural resources and rural development / Agricultural policy, institutional and capacity development - Agricultural production - Land-based natural resources management - Water-based natural resources management |
||||
Gender Equity and Mainstreaming | No gender elements | ||||
Description | The proposed project will strengthen rural livelihoods, especially the rural poor who rely most on natural resources as the basis for their primary source of income, to modernize their agriculture production systems and minimize environmental degradation and nonpoint source (NPS) pollution. The proposed project will be implemented in five provinces and one municipality in the upper and middle reaches of the Yangtze River Basin, notably Yunnan, Sichuan, Guizhou, Chongqing, Hunan, and Hubei. The project area consists of 48 counties, which are characterized by the prevalence of low and medium agriculture productivity; high risk and occurrence of soil erosion; high levels of agriculture NPS pollution; lack of irrigation systems; limited farm access roads; and are in need for modernization and were selected for inclusion in the project based on geographical, financial, environmental and social criteria. The project will have three outputs: (i) Modern farming systems applied; (ii) agriculture nonpoint source pollution reduced; and (iii) institutional capacity and coordination strengthened. These outputs will result in the following outcome: sustainable and modern agriculture production systems established in the participating project provinces. The project will be aligned with the following impact: improved environmental protection, rehabilitation, and management of the Yangtze River. | ||||
Project Rationale and Linkage to Country/Regional Strategy | The Yangtze River Economic Belt (YREB) has been earmarked as one of the three key growth engines to ensure the future economic development of the People s Republic of China (PRC). The Yangtze River is the third longest river in the world flowing through the eastern, central, and western part of the PRC covering more than 2 million square kilometers and accounting for one-fifth of the country geographically. Nine provinces and two specially-administered cities make up the YREB. Within the PRC, the YREB accounts for over 40% of the entire population and 40% of the freshwater resource; serves as the drinking water resources for 400 million people; provides 60% of total fisheries production; and has 20% of the total wetland area and already contributes about 45% of the country s economic output.
|
||||
Impact | |||||
Outcome | |||||
Outputs | |||||
Geographical Location |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | The TA will require services of 7.0 person months (pm) of international and 18.0 pm of national consultants. Individual consultants will be recruited for the positions of soil and water conservation, economist, agriculture, and waste management specialists, to provide advanced inputs to support project design. The remaining positions will be filled by engaging a consulting firm through quality- and cost-based selection method using a quality-cost ratio of 90:10 and biodata technical proposal. All consultant selection will be according to ADB's Guidelines on the Use of Consultants (2013 as amended from time to time). |
Responsible ADB Officer | Robertson, Suzanne Kay |
Responsible ADB Department | East Asia Department |
Responsible ADB Division | Environment, Natural Resources & Agriculture Division, EARD |
Executing Agencies |
State Office for Comprehensive Agricultural Devt 3# Nan San Xiang, Sanli He Xi Cheng District, Beijing 100820 PRC |
Timetable | |
---|---|
Concept Clearance | 28 Apr 2017 |
Fact Finding | 28 Apr 2017 to 28 Apr 2017 |
MRM | - |
Approval | - |
Last Review Mission | - |
Last PDS Update | 28 Mar 2017 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
None currently available.
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
None currently available.