China, People's Republic of : Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project
The proposed project will strengthen rural livelihoods, especially the rural poor who rely most on natural resources as the basis for their primary source of income, to modernize their agriculture production systems and minimize environmental degradation and nonpoint source (NPS) pollution. The proposed project will be implemented in five provinces and one municipality in the upper and middle reaches of the Yangtze River Basin, notably Yunnan, Sichuan, Guizhou, Chongqing, Hunan, and Hubei. The project area consists of 48 counties, which are characterized by the prevalence of low and medium agriculture productivity; high risk and occurrence of soil erosion; high levels of agriculture NPS pollution; lack of irrigation systems; limited farm access roads; and are in need for modernization and were selected for inclusion in the project based on geographical, financial, environmental and social criteria.
Project Details
-
Project Officer
Niu, Zhiming
East Asia Department
Request for information -
Country/Economy
China, People's Republic of -
Sector
- Agriculture, natural resources and rural development
Project Name | Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project | ||||
Project Number | 51116-002 | ||||
Country / Economy | China, People's Republic of |
||||
Project Status | Active | ||||
Project Type / Modality of Assistance | Loan |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
Drivers of Change | Gender Equity and Mainstreaming Governance and capacity development Knowledge solutions |
||||
Sector / Subsector | Agriculture, natural resources and rural development / Agricultural policy, institutional and capacity development - Agricultural production - Land-based natural resources management - Water-based natural resources management |
||||
Gender | Effective gender mainstreaming | ||||
Description | The proposed project will strengthen rural livelihoods, especially the rural poor who rely most on natural resources as the basis for their primary source of income, to modernize their agriculture production systems and minimize environmental degradation and nonpoint source (NPS) pollution. The proposed project will be implemented in five provinces and one municipality in the upper and middle reaches of the Yangtze River Basin, notably Yunnan, Sichuan, Guizhou, Chongqing, Hunan, and Hubei. The project area consists of 48 counties, which are characterized by the prevalence of low and medium agriculture productivity; high risk and occurrence of soil erosion; high levels of agriculture NPS pollution; lack of irrigation systems; limited farm access roads; and are in need for modernization and were selected for inclusion in the project based on geographical, financial, environmental and social criteria. The project will have three outputs: (i) Modern farming systems applied; (ii) agriculture nonpoint source pollution reduced; and (iii) institutional capacity and coordination strengthened. These outputs will result in the following outcome: sustainable and modern agriculture production systems established in the participating project provinces. The project will be aligned with the following impact: improved environmental protection, rehabilitation, and management of the Yangtze River. | ||||
Project Rationale and Linkage to Country/Regional Strategy | The Yangtze River Economic Belt (YREB) has been earmarked as one of the three key growth engines to ensure the future economic development of the People's Republic of China (PRC). The Yangtze River is the third longest river in the world flowing through the eastern, central, and western part of the PRC covering more than 2 million square kilometers and accounting for one-fifth of the country geographically. Nine provinces and two specially-administered cities make up the YREB. Within the PRC, the YREB accounts for over 40% of the entire population and 40% of the freshwater resource; serves as the drinking water resources for 400 million people; provides 60% of total fisheries production; and has 20% of the total wetland area and already contributes about 45% of the country's economic output. The YREB has benefitted from extensive development over the last 30 years, yet the current economic growth in the middle and upper reaches of the Yangtze River Basin is still considered below its potential capacity. Three key drivers that are considered crucial to promote further economic growth include: (i) strengthening of sustainable agriculture practices and ecological protection; (ii) transformation and greening of the key production sectors; and (iii) expanded development of inland water ways. These drivers are still constrained due to: (i) limited overall institutional coordination for strategic planning for the YREB; (ii) significant regional disparity between the highly developed eastern reaches of the YREB and the subregions of the central and western reaches; and (iii) increasing environmental pollution and pressure on natural resources. Agricultural production systems, considered as a key for ensuring economic growth and providing livelihood income for a large part of the rural population in the YREB, are still not sustainable. Improper use of land and water resources, land conversion, inadequate agricultural extension services, excessive fertilizer and pesticide use, rapid expansion of intensive livestock production, and improper waste management and disposal practices all result in increasing concerns about nonpoint source (NPS) pollution. Impacts include excessive levels of nitrogen, phosphorus, and pesticide entering into water bodies and soils through agricultural chemical runoff, soil erosion, floods, landslides, reduced water quality, reduced land productivity, desertification, and loss of biodiversity. Agriculture accounts for 92% of the nitrogen discharged into the Yangtze River and large levels of sedimentation. Agricultural NPS pollution has a negative impact on farm productivity, human health, quality of natural resources, and sustainable economic development of the YREB. The national and local governments are proactively trying to address pollution concerns and establish modern farming production systems. Most of the focus has been on reducing pollution identified from single localized sources (point source pollution) such as manufacturing and industry; however, new emphasis has been placed on developing measures to reduce all sources of pollution including agricultural NPS pollution. With heightened understanding about the impact of environmental degradation and emphasis on the 'new normal to promote economic development with environmental protection and rehabilitation, the State Council in April 2014 issued guidelines to stimulate economic development of the Yangtze River Basin in parallel with promoting sustainable natural resource use and protection and applying stricter control over pollution along the river. The National Development and Reform Commission subsequently prepared the YREB Development Plan 20162030, to promote environmental protection, rehabilitation, and management of water resources and strengthen green development. Modernizing the agriculture sector and reducing agriculture-related NPS pollution are key features of these key development strategies. |
||||
Impact | Environmental rehabilitation, protection, and management of the Yangtze River improved |
Project Outcome | |
---|---|
Description of Outcome | Sustainable and modern agriculture production systems in participating project watersheds increased. |
Progress Toward Outcome | The project became effective on 26 August 2019. Project implementation commenced in all six provinces. |
Implementation Progress | |
Description of Project Outputs | Modern farming systems constructed Waste and environmental management systems strengtened Institutional, technical, and management capacity and coordination strengthened |
Status of Implementation Progress (Outputs, Activities, and Issues) | The project became effective on 26 August 2019. Activities for procurement is ongoing. As of September 2023, 355 contracts for civil works and goods are awarded under the project, and procurement of more contracts for civil works and goods are in process. Consulting services including 4 individual consultant and 7 firms are recruited. |
Geographical Location | Chongqing, Guizhou, Hubei, Hunan, Sichuan, Yunnan |
Safeguard Categories | |
---|---|
Environment | B |
Involuntary Resettlement | C |
Indigenous Peoples | B |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | The project was classified by ADB as category B, and an initial environmental examination (IEE) report and an environmental management plan (EMP) are requirements under ADB's Safeguard Policy Statement (2009). |
Involuntary Resettlement | The project was classified by ADB as category C on involuntary resettlement according to ADB's Safeguard Policy Statement (2009). The project will not involve involuntary land acquisition and resettlement impacts. |
Indigenous Peoples | The project was classified by ADB as category B on indigenous peoples according to ADB's Safeguard Policy Statement (2009). |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | All ADB-financed individual consultants, consulting firms, and monitoring agencies will be recruited according to ADB's Guidelines on the Use of Consultants by the Asian Development Bank and Its Borrowers (2013, as amended from time to time). |
Procurement | All procurement of the ADB-financed works and goods will be undertaken in accordance with ADB's Procurement Guidelines. |
Responsible ADB Officer | Niu, Zhiming |
Responsible ADB Department | East Asia Department |
Responsible ADB Division | PRC Resident Mission (PRCM) |
Executing Agencies |
Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs Sichuan Finance Department |
Timetable | |
---|---|
Concept Clearance | 31 May 2017 |
Fact Finding | 13 Nov 2017 to 17 Nov 2017 |
MRM | 26 Jan 2018 |
Approval | 16 Nov 2018 |
Last Review Mission | - |
Last PDS Update | 20 Sep 2023 |
Loan 3740-PRC
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
16 Nov 2018 | 30 Apr 2019 | 26 Aug 2019 | 30 Nov 2024 | - | - |
Financing Plan | Loan Utilization | ||||
---|---|---|---|---|---|
Total (Amount in US$ million) | Date | ADB | Others | Net Percentage | |
Project Cost | 333.10 | Cumulative Contract Awards | |||
ADB | 300.00 | 20 Sep 2023 | 233.90 | 0.00 | 78% |
Counterpart | 33.10 | Cumulative Disbursements | |||
Cofinancing | 0.00 | 20 Sep 2023 | 166.54 | 0.00 | 56% |
Status of Covenants | ||||||
---|---|---|---|---|---|---|
Category | Sector | Safeguards | Social | Financial | Economic | Others |
Rating | Satisfactory | Satisfactory | - | Satisfactory | - | Satisfactory |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Contract Title | Approval Number | Contract Date | Contractor | Address | Executing Agency | Total Contract Amount (US$) | Contract Amount Financed by ADB (US$) |
---|---|---|---|---|---|---|
CW1A04-HBHH2022-01: Hardened road 13.71km, green belt of river bank 2ha, 8 auxiliary structures, dredging irrigation and drainage ditches 3.22km | Loan 3740 | 16 Aug 2023 | Hubei Zhuoyu Construction Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,149,070.95 | 1,046,858.87 |
CW1A04-HBCB2022-01: Construction of 41.16km intercepting and drainage ditches; 19.11km field production road; 101 ancillary buildings; 5 ponds for maintenance | Loan 3740 | 16 Aug 2023 | Shandong Huanghe Construction Co., Ltd. | Shandong | Farmland Construction and Management Dept, MARA | 3,028,358.84 | 2,758,980.47 |
CW1A03-HBSZ2022-01: 9 new electromechanical irrigation and drainage stations, 9.15 kilometers of hardened roads, 4650 square meters of collecting and distributing fields, 1.8 hectares of sprinkler irrigation, and 3.74 kilometers of channel revetment | Loan 3740 | 13 Jul 2023 | Hubei Zude Water Conservancy and Hydropower Engineering Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,588,909.01 | 1,472,578.66 |
CW2B-HNNA2021-01: Civil works in Changbei Village | Loan 3740 | 15 Jun 2023 | Changsha Zhanggongling Construction Engineering Co. Ltd. | Hunan | Farmland Construction and Management Dept, MARA | 1,284,120.22 | 1,230,770.62 |
CW1A01-GZYP2020-01: 2.58km drainage ditch, 23.38km concrete road, 0.51ha new greenhouses, 2 new project signs | Loan 3740 | 12 Jun 2023 | Guizhou Jingtiancheng Construction Engineering Co. Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 2,110,981.99 | 1,793,271.27 |
CW1A06-HBZJ2022-01: Drip irrigation construction 133.33ha, 3 project signboards | Loan 3740 | 04 May 2023 | Shandong Yellow River Construction Co., Ltd. | Shandong | Farmland Construction and Management Dept, MARA | 1,422,428.13 | 1,274,612.61 |
CW1A04-GZJK2021-01: 1 sand dam, 5.7km channel, 10.5km road, 1 project sign | Loan 3740 | 04 Apr 2023 | Guizhou Hongruiteng Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,578,144.01 | 1,359,411.94 |
CW1A03-GZST2020-01: 4.9km channel, 2.1km ditch, 20.9km concrete road, 3.7km pipeline, and 3 pools | Loan 3740 | 04 Apr 2023 | Guizhou Yishui Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,698,698.98 | 1,463,257.89 |
CW1A02-GZJK2019-01: 3.2km channel, 5 pools, 95ha sprinkling irrigation, 11.33km road, 1 project sign | Loan 3740 | 04 Apr 2023 | Guizhou Hongruiteng Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 2,028,138.40 | 1,747,036.73 |
CW1A01-GZYJ2019-02: 15km concrete road; 1.8km drainage ditch, 22 pools, 1 signboard | Loan 3740 | 04 Apr 2023 | Guizhou Huaheng Water Conservancy and Power Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,341,215.47 | 1,155,321.89 |
CW1A01-GZYJ2018-01: 9.4km concrete road; 0.83km drainage ditch, 10 pools, 3.45km flood drainage channel, 1 signboard | Loan 3740 | 04 Apr 2023 | Guizhou Fanhua River Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,365,725.41 | 1,176,434.73 |
CW1A01-GZYH2020-01: 6.5km channel, 8.75km roads, and 1 new project signboard | Loan 3740 | 04 Apr 2023 | Guizhou Chengyu Construction Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,471,775.03 | 1,267,785.78 |
CW1A01-SCYT2019-01: Civil works in Daxing Hui Township | Loan 3740 | 15 Mar 2023 | Sichuan Decai Construction Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,341,576.63 | 1,227,800.01 |
CW1A01-SCZH2020-01: Construct 13.4km rural road, 7 ponds renovation, 7km road, and 48.8ha terracing | Loan 3740 | 15 Mar 2023 | Sichuan Decai Construction Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,578,658.58 | 1,444,775.49 |
CW1A01-SCYS2021-01: Construct 3km rural road, 42 reservoirs, 1.7km channel, 16 ponds renovation, 14.7km road, and 30.4ha terracing | Loan 3740 | 15 Mar 2023 | Sichuan Guojin Construction and Development Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,706,834.40 | 1,562,080.96 |
CW1A01-SCYT2020-01: Construct 22.7km ditch, 37 reservoirs, 1 pump, irrigation 53ha, 3.4km road and 98ha terracing | Loan 3740 | 15 Mar 2023 | Sichuan Province People's Canal Construction Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,734,780.91 | 1,587,657.38 |
CW1A01-SCNB2019-01: Civil works in Dongba Town | Loan 3740 | 15 Mar 2023 | Sichuan Dalu Road and Bridge Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 2,675,782.17 | 2,448,854.07 |
CW1A01-HBHH2019-01: Construct Shimoda road, culvert, 9 new pumping stations, etc. | Loan 3740 | 21 Mar 2023 | Shaanxi Shengxin Construction and Installation Engineering Co., Ltd. | Shaanxi | Farmland Construction and Management Dept, MARA | 1,244,329.18 | 1,145,617.05 |
CW1B07-HBDY2020-01: Greenhouse in Dangyang | Loan 3740 | 21 Mar 2023 | Hubei Chutian Dadi Construction Engineering Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,284,327.11 | 1,182,441.96 |
CS-TA-NPMO-2020-2: Carry out "1+N" knowledge sharing and communication activities | Loan 3740 | 06 Feb 2023 | Institute of Agriculture Resources and Regional Planning, Chinese Academy of Agricultural Science | Beijing | Farmland Construction and Management Dept, MARA | 965,685.00 | 965,685.00 |
CW1A01-SCNB2019-02: Construct 7.2km channel, 4 reservoirs, 10 ponds renovation, 14.2km road, 22ha terracing, 11.3ha land adjustment, and 1.75km embarkment | Loan 3740 | 03 Jan 2023 | Sichuan Dalu Road and Bridge Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 2,645,143.96 | 2,481,031.11 |
CW1A01-SCJG2020-02: Construct 9.3km ditches, 2 reservoirs, 3.9km road, 80.1ha terracing | Loan 3740 | 03 Jan 2023 | Chenzhou City Hydropower Construction Company | Hunan | Farmland Construction and Management Dept, MARA | 1,593,781.94 | 1,493,332.56 |
CW1A01-SCWC2020-01: Construct 10.4km rural road, 42 reservoirs, 7 ponds, 10.6km ditch, and 57ha terracing | Loan 3740 | 03 Jan 2023 | Sichuan Longshen Construction Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 2,467,386.68 | 2,311,877.66 |
CW1A03-GZSN2020-02: 1.42km interception ditch, 22.76km of concrete roads, 17 pools, 2 signboards | Loan 3740 | 14 Nov 2022 | Guizhou Yishui Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,449,379.81 | 1,268,038.09 |
CW2B-HNPJ2020-01: 2223 anaerobic purification tanks in Pingjiang County | Loan 3740 | 25 Oct 2022 | Hunan Yixiang Construction Engineering Co., Ltd. | Hunan | Farmland Construction and Management Dept, MARA | 1,144,171.57 | 1,106,307.65 |
CW1A-HNDK2019-01: Modern Agricultural Engineering in Dongkou County (Package 2) | Loan 3740 | 18 Aug 2022 | Hunan Lianzhong Construction Group Co., Ltd. | Hunan | Farmland Construction and Management Dept, MARA | 1,085,092.68 | 1,033,650.98 |
CW1A-HNHN2019-01: Modern Agricultural Engineering in Hengnan County (Package 2) | Loan 3740 | 18 Aug 2022 | Yuanwu Construction Group Co., Ltd. | Henan | Farmland Construction and Management Dept, MARA | 1,156,716.77 | 1,101,879.54 |
CW2B-HNDK2018-01: 3.96km channel and 7 canal structures in Dongkou County | Loan 3740 | 29 Aug 2022 | Hunan Lianzhong Construction Group Co., Ltd. | Hunan | Farmland Construction and Management Dept, MARA | 1,221,522.03 | 1,178,403.57 |
CW1A01-CQZX2021-01: Construct 1km ditch, 6.5km road, 9 reservoirs, land leveling of 62ha, planting 90000 seedlings, 3km pipes and 1 pump station | Loan 3740 | 10 Aug 2022 | Chongqing Longsheng Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,222,804.96 | 1,188,153.35 |
CW2B03-CQ2020-01: Fruit forest seedlings of 2691ha | Loan 3740 | 10 Aug 2022 | Chongqing Xinyeyuan Agricultural Development Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 4,388,182.83 | 4,237,839.53 |
CW1A01-HBSS2018-01: Construct 20.8km channel, 10.4km ditches, 94 auxiliary structures and 11.9km irrigation and drainage channel | Loan 3740 | 15 Jul 2022 | Hubei Yingdu Water Resources Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,146,534.24 | 1,048,316.54 |
CW1A08-HBZJ2021-01: Construct 6km channels, 10km road, 8 ponds maintenance and leveling 66.7ha of land | Loan 3740 | 15 Jul 2022 | Qingdao Ruiyuan Engineering Group Co., Ltd. | Shandong | Farmland Construction and Management Dept, MARA | 1,531,567.10 | 1,400,365.61 |
CW1A01-CQWS2020-02: Civil works in Wushan County (package 2) | Loan 3740 | 01 Jun 2022 | Mianyang Jiacheng Construction Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,120,054.89 | 1,097,408.08 |
CW1A-HNHN2018-01: Modern Agricultural Engineering in Hengnan County (Package 1) | Loan 3740 | 13 Jun 2022 | Henan Shuicheng Construction Engineering Co., Ltd. | Henan | Farmland Construction and Management Dept, MARA | 1,148,302.00 | 1,111,085.90 |
CW1A01-CQWL2020-01: Civil works in Wulong County (package 1) | Loan 3740 | 01 Jun 2022 | Chongqing Xinyixing Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,164,703.22 | 1,141,153.65 |
CW1A03-HBSZ2018-01: Construct 13 irrigation stations and 23km road | Loan 3740 | 01 Jun 2022 | Guangdong Zhaoqing Water Conservancy and Hydropower Engineering Co., Ltd. | Guangdong | Farmland Construction and Management Dept, MARA | 1,253,846.89 | 1,149,520.22 |
CW1A01-SCYS2020-01: Civil works in Huangdu Town | Loan 3740 | 02 Jun 2022 | Sichuan Tianyin Municipal Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,336,822.74 | 1,208,008.76 |
CW1A01-SCAZ2020-01: Civil works in Heqing Town | Loan 3740 | 02 Jun 2022 | Sichuan Taida Construction Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,367,288.41 | 1,235,538.81 |
CW1A01-SCAZ2019-01: Civil works in Tashui Town | Loan 3740 | 02 Jun 2022 | Guohe Construction Group Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,369,374.46 | 1,237,423.85 |
CW1A01-HBGA2021-01: Construct 33.27km channel, 3.78km ditch, 13 irrigation stations, and repair 36 ponds | Loan 3740 | 02 Jun 2022 | Hubei Jinjiang Construction Engineering Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,588,565.71 | 1,448,127.82 |
CW2B02-HBSZ2020-01: 35.29km of ecological ditches, 7.5km of ecological corridors, 17.54km of nitrogen and phosphorus intercepting ditch | Loan 3740 | 02 Jun 2022 | Shaanxi Shengxin Construction and Installation Engineering Co., Ltd. | Shaanxi | Farmland Construction and Management Dept, MARA | 3,605,989.44 | 3,287,200.26 |
CW1A01-CQWS2020-01: Civil works in Wushan County (package 1) | Loan 3740 | 29 Apr 2022 | Sichuan Lizhao Construction Group Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,144,231.56 | 1,112,540.40 |
CW1A01-CQZX2020-03: Civil works in Zhong County (package 3) | Loan 3740 | 29 Apr 2022 | Chongqing Longsheng Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,165,944.57 | 1,133,652.05 |
CW1A08- HBCB2020-01: Civil works in Chibi City (Taipingkou Village,Dongliu Village, Canghu Ecological Agriculture Development Zone, Chibi Town) | Loan 3740 | 13 Apr 2022 | Yichang Fangyuan Water Conservancy and Hydropower Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,305,585.02 | 1,153,108.06 |
CW1A04-HBYD2021-02: Construct 6km ditch, 11.1km road, 16 grit chambers, 1 auxiliary structure and repair 2 ponds | Loan 3740 | 26 Apr 2022 | Hubei Chuyao Water Conservancy and Hydropower Engineering Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,295,027.52 | 1,159,183.75 |
CW1A01-CQFL2020-01: Civil works in Fuling County (package 1) | Loan 3740 | 29 Apr 2022 | Chongqing Yiyiyi Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,192,375.91 | 1,159,351.33 |
CW1A01-CQWS2020-03: Civil works in Wushan County (package 3) | Loan 3740 | 29 Apr 2022 | Chongqing Ereryi Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,277,930.91 | 1,242,536.76 |
CW2B02-HBHH2020-01: 24.3km embankment | Loan 3740 | 26 Apr 2022 | Hubei Zhuoyu Construction Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,392,709.41 | 1,246,619.16 |
CW1A01-CQZX2020-04: Civil works in Zhong County (package 1) | Loan 3740 | 29 Apr 2022 | Chongqing Huisheng Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,297,882.97 | 1,261,936.22 |
CW1A01-CQJJ2020-01: Civil works in Jiangjin County (package 1) | Loan 3740 | 29 Apr 2022 | Chongqing Shengshihua Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,317,231.03 | 1,280,748.41 |
CW1A06- HBZJ2019-01: 280ha drip irrigation and 40ha sprinkler irrigation in Zhijiang City | Loan 3740 | 13 Apr 2022 | Yichang Jinli Water Conservancy and Hydropower Engineering Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 1,153,945.15 | 1,019,177.94 |
CW1A01- SCJG2019-01: Civil works in Jiange County | Loan 3740 | 18 Apr 2022 | Ligang Construction Group Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 2,404,838.00 | 2,107,105.34 |
CW1A01-CQZX2020-01 | Loan 3740 | 29 Apr 2022 | Chongqing Fubo Construction Engineering Co., Ltd. | Chongqing | Farmland Construction and Management Dept, MARA | 1,118,045.15 | 1,087,079.27 |
CW1A04-HBDY2021-01: civil works in Dangyang City | Loan 3740 | 26 Apr 2022 | Hubei Longyuzhou Engineering Construction Co., Ltd. | Hubei | Farmland Construction and Management Dept, MARA | 2,398,956.94 | 2,147,314.91 |
CW1A04-GZSN2021-02: Construct 12.7km main road, 8.8km production road, 2.9km ditch and 48 pools | Loan 3740 | 03 Mar 2022 | Guizhou Qianhaiyuan Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,489,121.13 | 1,280,277.27 |
CW1A02-GZSN2019-02: Construct 17.9km main road, 13.7km production road, 2.5km ditch and 42 pools | Loan 3740 | 03 Mar 2022 | Guizhou Sifangyin Ecological Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 1,979,185.84 | 1,701,612.18 |
CW2A-HNNA2021-01: 5641 anaerobic purification tanks and pollutant emission early warning monitoring station | Loan 3740 | 09 Feb 2022 | Henan Xinpin Construction Engineering Co., Ltd. | Henan | Farmland Construction and Management Dept, MARA | 2,030,452.19 | 1,987,345.65 |
CW1A02-GZBJ2019-01: Construct 4.2km embarkment, 4.2km channel, 7.3km main road and 6.4km production road | Loan 3740 | 05 Jan 2022 | Qianxin Construction Engineering Co., Ltd. | Guizhou | Farmland Construction and Management Dept, MARA | 2,127,941.54 | 1,843,505.10 |
Green finance supports research on regional agricultural ecological construction and industrial development | Loan 3740 | 30 Jul 2021 | University of International Business and Economics | Beijing | Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs | 101,000.00 | 101,000.00 |
Research on international experience and development model of regional agro-ecological construction | Loan 3740 | 30 Jul 2021 | Agricultural Information Institute Chinese Academy of Agricultural Sciences | Beijing | Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs | 101,600.00 | 101,600.00 |
Study on the effect of the implementation of the Yangtze River Ecological Corridor Project on the green and high-quality development of regional agriculture | Loan 3740 | 30 Jul 2021 | Institute of Agricultural Resources and Regional Planning Chinese Academy of Agricultural Science | Beijing | Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs | 101,888.00 | 101,888.00 |
Research on the mode and method of rural women's participation in agricultural ecological development | Loan 3740 | 30 Jul 2021 | Central University of Finance and Economics | Beijing | Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs | 151,000.00 | 151,000.00 |
CW1A01-SCZH2018-01, Civil works in Shuangshi Village, Hongyan Town | Loan 3740 | 05 Aug 2021 | Sichuan Dongyi Construction Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 1,630,759.11 | 1,481,305.58 |
CW1A01-SCWC2019-01, Civil works in Donghe Town | Loan 3740 | 05 Aug 2021 | Sichuan Dafu Construction Engineering Co., Ltd. | Sichuan | Farmland Construction and Management Dept, MARA | 2,172,140.94 | 1,973,071.60 |
CW1A01-GZYJ2018-02 CONSTRUCT 8.75KM MAIN ROAD, 14. 1KM PRODUCTION ROAD, 3.6HA LOW PRESSURE PIPELINE, 0.94KM DITCH, 17 POOLS, ETC. | Loan 3740 | 10 May 2021 | GUIZHOU GUANGYUNLONG CONSTRUCTION ENGINEERING | GUIYANG CHINA, PEOPLE'S REP. OF | Farmland Construction and Management Dept, MARA | 1,226,906.64 | 1,076,840.86 |
CW1A01-GZBJ2018-01 RIVER EMBANKMENT OF 5.78KM | Loan 3740 | 19 May 2021 | GUIZHOU CONSTRUCTION ENGINEERING GROUP FIFTH | GUIZHOU CHINA, PEOPLE'S REP. OF | Farmland Construction and Management Dept, MARA | 1,420,103.34 | 1,237,610.06 |
CW1A01-GZBJ2018-02 CONSTRUCT 2KM CHANNEL, 13.1KM M AIN ROAD AND 0.4KM FIELD ROAD | Loan 3740 | 19 May 2021 | GUIZHOU SANPU CONSTRUCTION ENGINEERING (GROUP | GUIZHOU CHINA, PEOPLE'S REP. OF | Farmland Construction and Management Dept, MARA | 1,438,455.46 | 1,253,603.80 |
CW2A-HNSF2020-01 HUTANG VILLAGE HEJIABAO ECOLOGICA L AGRICULTURE MODERN INDUSTRIAL PARK POLLUTANT EMI SSION REDUCTION | Loan 3740 | 11 Mar 2021 | HUNAN XIANGYU ENGINEERING CO., LTD. | LOUDI, HUNAN CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 1,125,199.13 | 1,082,070.08 |
CW2B03-CQ2019-01 340,500 CITRUS SEEDLING, 189,000 PLUM SEEDLING, 26,000 LOQUAT SEEDLING AND 5,000 WA LNUT SEEDLING | Loan 3740 | 26 Mar 2021 | CHONGQING XINYEYUAN AGRICULTURAL DEVELOPMENT | CHONGQING CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 2,419,889.04 | 2,359,560.36 |
CW1A01-CQJJ2019-01 1.9KM DRAINAGE DITCH, 14 POOLS, 9 PONDS, AND 6.85KM LOW-PRESSURE PIPELINE | Loan 3740 | 22 Dec 2020 | CHONGQING SHENGSHIHUA CONSTRUCTION ENGINEERIN | CHONGQING CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 1,019,482.82 | 1,013,624.13 |
CW1A-HNLI2018-01 DRAINAGE & IRRIGATION DITCHES 4.8 KM, FIELD ROADS 6.3KM, 79 CANAL STRUCTURES, 1 RIVE R DAM, 1.3KM ECO-REVETMENT SLOPE | Loan 3740 | 15 Dec 2020 | HUNAN POWER ENGINEERING CO., LTD. | HUNAN CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 1,648,224.99 | 1,623,737.76 |
CW1A01-SCYT2018-01 CIVIL WORKS IN YANTING (CONSTRU CTION 4.79KM CHANNEL, 6 IRRIGATION STATIONS, 15.87 KM ROAD, 86.28HA MICRO-IRRIGATION, 43 R'RS,ETC.) | Loan 3740 | 25 Sep 2020 | SICHUAN DONGYI CONSTRUCTION ENGINEERING CO., | SICHUAN CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 2,135,225.46 | 1,933,145.98 |
CW1A01-SCNB2018-01 CIVIL WORKS OF NANBU IN 2019(C ONSTRUCT 13.69KM DITCHES, 13.64KM ROAD, 42 RESERVO IRS, 66.98HA TERRACING, ETC.) | Loan 3740 | 25 Sep 2020 | SICHUAN HONGHE CONSTRUCTION CO., LTD. | SICHUAN CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 2,147,352.95 | 1,948,782.09 |
CIVIL WORKS IN WUSHAN, CHONGQING (0.9KM DRAINAGE D ITCH, 5.4KM MACHINE ROAD, 3.8KM PRODUCTION ROAD, 3 .8KM PIPELINE, 2 RESERVOIRS) | Loan 3740 | 25 Aug 2020 | JIANGXI PACIFIC CONSTRUCTION GROUP CO., LTD. | JIANGXI CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 1,109,776.02 | 1,109,776.02 |
FIELD ENGINEERING IN JIANGE COUNTY OF 2019 (4.04KM CHANNEL, 6.9KM ROAD, 5 RESERVOIRS, 1.07KM RIVERBAK PROTECTION, 35HA LAND CONSOLIDATION) | Loan 3740 | 26 Aug 2020 | XIANGSHENG CONSTRUCTION ENGINEERING CO., LTD. | CHENGDU, SICHUAN CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 1,665,794.62 | 1,533,655.48 |
FIELD ENGINEERING CONSTRUCTION FOR WANGCANG COUNTY OF 2019 (19.19KM CHANNEL, 18KM ROAD, 39 RESERVOIRS 1 POND, 22.64HA TERRACING) | Loan 3740 | 26 Aug 2020 | NUCLEAR INDUSTRY SOUTHWEST CONSTRUCTION GROUP | CHENGDU, SICHUAN CHINA,PEOPLE'SREP.OF | Farmland Construction and Management Dept, MARA | 2,038,167.85 | 1,876,490.20 |
Procurement Plan
Title | Document Type | Document Date |
---|---|---|
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Procurement Plan | Procurement Plans | Feb 2023 |