China, People's Republic of : Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project

Sovereign Project | 51116-002

The proposed project will strengthen rural livelihoods, especially the rural poor who rely most on natural resources as the basis for their primary source of income, to modernize their agriculture production systems and minimize environmental degradation and nonpoint source (NPS) pollution. The proposed project will be implemented in five provinces and one municipality in the upper and middle reaches of the Yangtze River Basin, notably Yunnan, Sichuan, Guizhou, Chongqing, Hunan, and Hubei. The project area consists of 48 counties, which are characterized by the prevalence of low and medium agriculture productivity; high risk and occurrence of soil erosion; high levels of agriculture NPS pollution; lack of irrigation systems; limited farm access roads; and are in need for modernization and were selected for inclusion in the project based on geographical, financial, environmental and social criteria.

Project Details

  • Project Officer
    Niu, Zhiming
    East Asia Department
    Request for information
  • Country/Economy
    China, People's Republic of
  • Sector
    • Agriculture, natural resources and rural development
Project Name Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project
Project Number 51116-002
Country / Economy China, People's Republic of
Project Status Active
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 3740-PRC: Yangtze River Green Ecological Corridor Comprehensive Agriculture Development
Ordinary capital resources US$ 300.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Knowledge solutions
Sector / Subsector

Agriculture, natural resources and rural development / Agricultural policy, institutional and capacity development - Agricultural production - Land-based natural resources management - Water-based natural resources management

Gender Effective gender mainstreaming
Description The proposed project will strengthen rural livelihoods, especially the rural poor who rely most on natural resources as the basis for their primary source of income, to modernize their agriculture production systems and minimize environmental degradation and nonpoint source (NPS) pollution. The proposed project will be implemented in five provinces and one municipality in the upper and middle reaches of the Yangtze River Basin, notably Yunnan, Sichuan, Guizhou, Chongqing, Hunan, and Hubei. The project area consists of 48 counties, which are characterized by the prevalence of low and medium agriculture productivity; high risk and occurrence of soil erosion; high levels of agriculture NPS pollution; lack of irrigation systems; limited farm access roads; and are in need for modernization and were selected for inclusion in the project based on geographical, financial, environmental and social criteria. The project will have three outputs: (i) Modern farming systems applied; (ii) agriculture nonpoint source pollution reduced; and (iii) institutional capacity and coordination strengthened. These outputs will result in the following outcome: sustainable and modern agriculture production systems established in the participating project provinces. The project will be aligned with the following impact: improved environmental protection, rehabilitation, and management of the Yangtze River.
Project Rationale and Linkage to Country/Regional Strategy

The Yangtze River Economic Belt (YREB) has been earmarked as one of the three key growth engines to ensure the future economic development of the People's Republic of China (PRC). The Yangtze River is the third longest river in the world flowing through the eastern, central, and western part of the PRC covering more than 2 million square kilometers and accounting for one-fifth of the country geographically. Nine provinces and two specially-administered cities make up the YREB. Within the PRC, the YREB accounts for over 40% of the entire population and 40% of the freshwater resource; serves as the drinking water resources for 400 million people; provides 60% of total fisheries production; and has 20% of the total wetland area and already contributes about 45% of the country's economic output.

The YREB has benefitted from extensive development over the last 30 years, yet the current economic growth in the middle and upper reaches of the Yangtze River Basin is still considered below its potential capacity. Three key drivers that are considered crucial to promote further economic growth include: (i) strengthening of sustainable agriculture practices and ecological protection; (ii) transformation and greening of the key production sectors; and (iii) expanded development of inland water ways. These drivers are still constrained due to: (i) limited overall institutional coordination for strategic planning for the YREB; (ii) significant regional disparity between the highly developed eastern reaches of the YREB and the subregions of the central and western reaches; and (iii) increasing environmental pollution and pressure on natural resources.

Agricultural production systems, considered as a key for ensuring economic growth and providing livelihood income for a large part of the rural population in the YREB, are still not sustainable. Improper use of land and water resources, land conversion, inadequate agricultural extension services, excessive fertilizer and pesticide use, rapid expansion of intensive livestock production, and improper waste management and disposal practices all result in increasing concerns about nonpoint source (NPS) pollution. Impacts include excessive levels of nitrogen, phosphorus, and pesticide entering into water bodies and soils through agricultural chemical runoff, soil erosion, floods, landslides, reduced water quality, reduced land productivity, desertification, and loss of biodiversity. Agriculture accounts for 92% of the nitrogen discharged into the Yangtze River and large levels of sedimentation. Agricultural NPS pollution has a negative impact on farm productivity, human health, quality of natural resources, and sustainable economic development of the YREB.

The national and local governments are proactively trying to address pollution concerns and establish modern farming production systems. Most of the focus has been on reducing pollution identified from single localized sources (point source pollution) such as manufacturing and industry; however, new emphasis has been placed on developing measures to reduce all sources of pollution including agricultural NPS pollution. With heightened understanding about the impact of environmental degradation and emphasis on the 'new normal to promote economic development with environmental protection and rehabilitation, the State Council in April 2014 issued guidelines to stimulate economic development of the Yangtze River Basin in parallel with promoting sustainable natural resource use and protection and applying stricter control over pollution along the river. The National Development and Reform Commission subsequently prepared the YREB Development Plan 20162030, to promote environmental protection, rehabilitation, and management of water resources and strengthen green development. Modernizing the agriculture sector and reducing agriculture-related NPS pollution are key features of these key development strategies.

Impact

Environmental rehabilitation, protection, and management of the Yangtze River improved

Project Outcome
Description of Outcome

Sustainable and modern agriculture production systems in participating project watersheds increased.

Progress Toward Outcome The project became effective on 26 August 2019. Project implementation commenced in all six provinces.
Implementation Progress
Description of Project Outputs

Modern farming systems constructed

Waste and environmental management systems strengtened

Institutional, technical, and management capacity and coordination strengthened

Status of Implementation Progress (Outputs, Activities, and Issues) The project became effective on 26 August 2019. Activities for procurement is ongoing. As of September 2023, 355 contracts for civil works and goods are awarded under the project, and procurement of more contracts for civil works and goods are in process. Consulting services including 4 individual consultant and 7 firms are recruited.
Geographical Location Chongqing, Guizhou, Hubei, Hunan, Sichuan, Yunnan
Safeguard Categories
Environment B
Involuntary Resettlement C
Indigenous Peoples B
Summary of Environmental and Social Aspects
Environmental Aspects The project was classified by ADB as category B, and an initial environmental examination (IEE) report and an environmental management plan (EMP) are requirements under ADB's Safeguard Policy Statement (2009).
Involuntary Resettlement The project was classified by ADB as category C on involuntary resettlement according to ADB's Safeguard Policy Statement (2009). The project will not involve involuntary land acquisition and resettlement impacts.
Indigenous Peoples The project was classified by ADB as category B on indigenous peoples according to ADB's Safeguard Policy Statement (2009).
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services All ADB-financed individual consultants, consulting firms, and monitoring agencies will be recruited according to ADB's Guidelines on the Use of Consultants by the Asian Development Bank and Its Borrowers (2013, as amended from time to time).
Procurement All procurement of the ADB-financed works and goods will be undertaken in accordance with ADB's Procurement Guidelines.
Responsible ADB Officer Niu, Zhiming
Responsible ADB Department East Asia Department
Responsible ADB Division PRC Resident Mission (PRCM)
Executing Agencies
Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs
Sichuan Finance Department
Timetable
Concept Clearance 31 May 2017
Fact Finding 13 Nov 2017 to 17 Nov 2017
MRM 26 Jan 2018
Approval 16 Nov 2018
Last Review Mission -
Last PDS Update 20 Sep 2023

Loan 3740-PRC

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
16 Nov 2018 30 Apr 2019 26 Aug 2019 30 Nov 2024 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 333.10 Cumulative Contract Awards
ADB 300.00 20 Sep 2023 233.90 0.00 78%
Counterpart 33.10 Cumulative Disbursements
Cofinancing 0.00 20 Sep 2023 166.54 0.00 56%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating Satisfactory Satisfactory - Satisfactory - Satisfactory

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Audited Project Financial Statements (January-December 2022) Audited Project Financial Statements Jun 2023
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Procurement Plan Procurement Plans Feb 2023
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Updated Project Administration Manual Project/Program Administration Manual Jan 2023
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Audited Project Financial Statements (January-December 2021) Audited Project Financial Statements Jun 2022
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Audited Project Financial Statements (26 August 2019-31 December 2020) Audited Project Financial Statements Jun 2021
Project Agreement for Loan 3740-PRC: Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project Project/Program Agreements Apr 2019
Loan Agreement (Ordinary Operations) for Loan 3740-PRC: Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project Loan Agreement (Ordinary Resources) Apr 2019
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Project Administration Manual Project/Program Administration Manual Oct 2018
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Gender Action Plan Gender Action Plans Oct 2018
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Report and Recommendation of the President Reports and Recommendations of the President Oct 2018
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Initial Poverty and Social Analysis Initial Poverty and Social Analysis May 2017

Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Environmental Monitoring Report (January-December 2022) Environmental Monitoring Reports Apr 2023
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Social Monitoring Report (July-December 2022) Social Monitoring Reports Apr 2023
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Social Monitoring Report (January-June 2022) Social Monitoring Reports Nov 2022
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Social Monitoring Report (July-December 2021) Social Monitoring Reports Jul 2022
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Environmental Monitoring Report (January-December 2021) Environmental Monitoring Reports Apr 2022
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Social Monitoring Report (January-June 2021) Social Monitoring Reports Dec 2021
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Environmental Monitoring Report Environmental Monitoring Reports Jun 2021
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Social Monitoring Report (July-December 2020) Social Monitoring Reports May 2021
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project: Draft Initial Environmental Examination Initial Environmental Examination Sep 2018
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development: Due Diligence Report on Land Use Rights Transfer and Land Acquisition and Resettlement Safeguards Due Diligence Reports Jan 2018
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development: Ethnic Minorities Development Plan Indigenous Peoples Planning Documents Dec 2017

Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Social Specialist Individual - Consulting Closed
Research on Social Benefits Evaluation and Sustainable Mechanism Construction of the Yangtze River Green Ecological Corridor Project Firm - Consulting Closed
Project Management Expert Individual - Consulting Closed
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project Firm - Consulting Closed
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project Firm - Consulting Closed
Research and Model Construction on Comprehensive Control Technology of Non-point Source Pollution Firm - Consulting Closed
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project Individual - Consulting Closed
Yangtze River Green Ecological Corridor Comprehensive Agriculture Development Project Firm - Consulting Closed
Financial Specialist Recruitment Individual - Consulting Closed
Research on International experience and development model of regional agricultural ecological construction Firm - Consulting Closed
Mechanism research on the reduction of fertilizers and pesticides application and the improvement of soil fertility Firm - Consulting Closed
Green Farmland Construction and High-quality Agricultural Development Technology Selection and Promotion Mode in the Yangtze River Green Ecological Corridor Project Area Firm - Consulting Closed
Research on Green Finance Supporting Regional Agricultural Ecological Construction and Industrial Development Firm - Consulting Closed
Research on the Effect of the ADB Yangtze River Green Ecological Corridor Project Implementation on Green Development of Regional Agriculture Firm - Consulting Closed
Research on the mode and Method of Rural women's participation in agricultural ecological development Firm - Consulting Closed
LAND USE RIGHT TRANSFER SPECIALIST Individual - Consulting Closed
Recruitment of social specialist Individual - Consulting Closed

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
CW1A04-HBHH2022-01: Hardened road 13.71km, green belt of river bank 2ha, 8 auxiliary structures, dredging irrigation and drainage ditches 3.22km Loan 3740 16 Aug 2023 Hubei Zhuoyu Construction Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,149,070.95 1,046,858.87
CW1A04-HBCB2022-01: Construction of 41.16km intercepting and drainage ditches; 19.11km field production road; 101 ancillary buildings; 5 ponds for maintenance Loan 3740 16 Aug 2023 Shandong Huanghe Construction Co., Ltd. | Shandong Farmland Construction and Management Dept, MARA 3,028,358.84 2,758,980.47
CW1A03-HBSZ2022-01: 9 new electromechanical irrigation and drainage stations, 9.15 kilometers of hardened roads, 4650 square meters of collecting and distributing fields, 1.8 hectares of sprinkler irrigation, and 3.74 kilometers of channel revetment Loan 3740 13 Jul 2023 Hubei Zude Water Conservancy and Hydropower Engineering Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,588,909.01 1,472,578.66
CW2B-HNNA2021-01: Civil works in Changbei Village Loan 3740 15 Jun 2023 Changsha Zhanggongling Construction Engineering Co. Ltd. | Hunan Farmland Construction and Management Dept, MARA 1,284,120.22 1,230,770.62
CW1A01-GZYP2020-01: 2.58km drainage ditch, 23.38km concrete road, 0.51ha new greenhouses, 2 new project signs Loan 3740 12 Jun 2023 Guizhou Jingtiancheng Construction Engineering Co. Ltd. | Guizhou Farmland Construction and Management Dept, MARA 2,110,981.99 1,793,271.27
CW1A06-HBZJ2022-01: Drip irrigation construction 133.33ha, 3 project signboards Loan 3740 04 May 2023 Shandong Yellow River Construction Co., Ltd. | Shandong Farmland Construction and Management Dept, MARA 1,422,428.13 1,274,612.61
CW1A04-GZJK2021-01: 1 sand dam, 5.7km channel, 10.5km road, 1 project sign Loan 3740 04 Apr 2023 Guizhou Hongruiteng Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,578,144.01 1,359,411.94
CW1A03-GZST2020-01: 4.9km channel, 2.1km ditch, 20.9km concrete road, 3.7km pipeline, and 3 pools Loan 3740 04 Apr 2023 Guizhou Yishui Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,698,698.98 1,463,257.89
CW1A02-GZJK2019-01: 3.2km channel, 5 pools, 95ha sprinkling irrigation, 11.33km road, 1 project sign Loan 3740 04 Apr 2023 Guizhou Hongruiteng Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 2,028,138.40 1,747,036.73
CW1A01-GZYJ2019-02: 15km concrete road; 1.8km drainage ditch, 22 pools, 1 signboard Loan 3740 04 Apr 2023 Guizhou Huaheng Water Conservancy and Power Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,341,215.47 1,155,321.89
CW1A01-GZYJ2018-01: 9.4km concrete road; 0.83km drainage ditch, 10 pools, 3.45km flood drainage channel, 1 signboard Loan 3740 04 Apr 2023 Guizhou Fanhua River Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,365,725.41 1,176,434.73
CW1A01-GZYH2020-01: 6.5km channel, 8.75km roads, and 1 new project signboard Loan 3740 04 Apr 2023 Guizhou Chengyu Construction Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,471,775.03 1,267,785.78
CW1A01-SCYT2019-01: Civil works in Daxing Hui Township Loan 3740 15 Mar 2023 Sichuan Decai Construction Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,341,576.63 1,227,800.01
CW1A01-SCZH2020-01: Construct 13.4km rural road, 7 ponds renovation, 7km road, and 48.8ha terracing Loan 3740 15 Mar 2023 Sichuan Decai Construction Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,578,658.58 1,444,775.49
CW1A01-SCYS2021-01: Construct 3km rural road, 42 reservoirs, 1.7km channel, 16 ponds renovation, 14.7km road, and 30.4ha terracing Loan 3740 15 Mar 2023 Sichuan Guojin Construction and Development Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,706,834.40 1,562,080.96
CW1A01-SCYT2020-01: Construct 22.7km ditch, 37 reservoirs, 1 pump, irrigation 53ha, 3.4km road and 98ha terracing Loan 3740 15 Mar 2023 Sichuan Province People's Canal Construction Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,734,780.91 1,587,657.38
CW1A01-SCNB2019-01: Civil works in Dongba Town Loan 3740 15 Mar 2023 Sichuan Dalu Road and Bridge Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 2,675,782.17 2,448,854.07
CW1A01-HBHH2019-01: Construct Shimoda road, culvert, 9 new pumping stations, etc. Loan 3740 21 Mar 2023 Shaanxi Shengxin Construction and Installation Engineering Co., Ltd. | Shaanxi Farmland Construction and Management Dept, MARA 1,244,329.18 1,145,617.05
CW1B07-HBDY2020-01: Greenhouse in Dangyang Loan 3740 21 Mar 2023 Hubei Chutian Dadi Construction Engineering Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,284,327.11 1,182,441.96
CS-TA-NPMO-2020-2: Carry out "1+N" knowledge sharing and communication activities Loan 3740 06 Feb 2023 Institute of Agriculture Resources and Regional Planning, Chinese Academy of Agricultural Science | Beijing Farmland Construction and Management Dept, MARA 965,685.00 965,685.00
CW1A01-SCNB2019-02: Construct 7.2km channel, 4 reservoirs, 10 ponds renovation, 14.2km road, 22ha terracing, 11.3ha land adjustment, and 1.75km embarkment Loan 3740 03 Jan 2023 Sichuan Dalu Road and Bridge Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 2,645,143.96 2,481,031.11
CW1A01-SCJG2020-02: Construct 9.3km ditches, 2 reservoirs, 3.9km road, 80.1ha terracing Loan 3740 03 Jan 2023 Chenzhou City Hydropower Construction Company | Hunan Farmland Construction and Management Dept, MARA 1,593,781.94 1,493,332.56
CW1A01-SCWC2020-01: Construct 10.4km rural road, 42 reservoirs, 7 ponds, 10.6km ditch, and 57ha terracing Loan 3740 03 Jan 2023 Sichuan Longshen Construction Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 2,467,386.68 2,311,877.66
CW1A03-GZSN2020-02: 1.42km interception ditch, 22.76km of concrete roads, 17 pools, 2 signboards Loan 3740 14 Nov 2022 Guizhou Yishui Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,449,379.81 1,268,038.09
CW2B-HNPJ2020-01: 2223 anaerobic purification tanks in Pingjiang County Loan 3740 25 Oct 2022 Hunan Yixiang Construction Engineering Co., Ltd. | Hunan Farmland Construction and Management Dept, MARA 1,144,171.57 1,106,307.65
CW1A-HNDK2019-01: Modern Agricultural Engineering in Dongkou County (Package 2) Loan 3740 18 Aug 2022 Hunan Lianzhong Construction Group Co., Ltd. | Hunan Farmland Construction and Management Dept, MARA 1,085,092.68 1,033,650.98
CW1A-HNHN2019-01: Modern Agricultural Engineering in Hengnan County (Package 2) Loan 3740 18 Aug 2022 Yuanwu Construction Group Co., Ltd. | Henan Farmland Construction and Management Dept, MARA 1,156,716.77 1,101,879.54
CW2B-HNDK2018-01: 3.96km channel and 7 canal structures in Dongkou County Loan 3740 29 Aug 2022 Hunan Lianzhong Construction Group Co., Ltd. | Hunan Farmland Construction and Management Dept, MARA 1,221,522.03 1,178,403.57
CW1A01-CQZX2021-01: Construct 1km ditch, 6.5km road, 9 reservoirs, land leveling of 62ha, planting 90000 seedlings, 3km pipes and 1 pump station Loan 3740 10 Aug 2022 Chongqing Longsheng Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,222,804.96 1,188,153.35
CW2B03-CQ2020-01: Fruit forest seedlings of 2691ha Loan 3740 10 Aug 2022 Chongqing Xinyeyuan Agricultural Development Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 4,388,182.83 4,237,839.53
CW1A01-HBSS2018-01: Construct 20.8km channel, 10.4km ditches, 94 auxiliary structures and 11.9km irrigation and drainage channel Loan 3740 15 Jul 2022 Hubei Yingdu Water Resources Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,146,534.24 1,048,316.54
CW1A08-HBZJ2021-01: Construct 6km channels, 10km road, 8 ponds maintenance and leveling 66.7ha of land Loan 3740 15 Jul 2022 Qingdao Ruiyuan Engineering Group Co., Ltd. | Shandong Farmland Construction and Management Dept, MARA 1,531,567.10 1,400,365.61
CW1A01-CQWS2020-02: Civil works in Wushan County (package 2) Loan 3740 01 Jun 2022 Mianyang Jiacheng Construction Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,120,054.89 1,097,408.08
CW1A-HNHN2018-01: Modern Agricultural Engineering in Hengnan County (Package 1) Loan 3740 13 Jun 2022 Henan Shuicheng Construction Engineering Co., Ltd. | Henan Farmland Construction and Management Dept, MARA 1,148,302.00 1,111,085.90
CW1A01-CQWL2020-01: Civil works in Wulong County (package 1) Loan 3740 01 Jun 2022 Chongqing Xinyixing Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,164,703.22 1,141,153.65
CW1A03-HBSZ2018-01: Construct 13 irrigation stations and 23km road Loan 3740 01 Jun 2022 Guangdong Zhaoqing Water Conservancy and Hydropower Engineering Co., Ltd. | Guangdong Farmland Construction and Management Dept, MARA 1,253,846.89 1,149,520.22
CW1A01-SCYS2020-01: Civil works in Huangdu Town Loan 3740 02 Jun 2022 Sichuan Tianyin Municipal Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,336,822.74 1,208,008.76
CW1A01-SCAZ2020-01: Civil works in Heqing Town Loan 3740 02 Jun 2022 Sichuan Taida Construction Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,367,288.41 1,235,538.81
CW1A01-SCAZ2019-01: Civil works in Tashui Town Loan 3740 02 Jun 2022 Guohe Construction Group Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,369,374.46 1,237,423.85
CW1A01-HBGA2021-01: Construct 33.27km channel, 3.78km ditch, 13 irrigation stations, and repair 36 ponds Loan 3740 02 Jun 2022 Hubei Jinjiang Construction Engineering Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,588,565.71 1,448,127.82
CW2B02-HBSZ2020-01: 35.29km of ecological ditches, 7.5km of ecological corridors, 17.54km of nitrogen and phosphorus intercepting ditch Loan 3740 02 Jun 2022 Shaanxi Shengxin Construction and Installation Engineering Co., Ltd. | Shaanxi Farmland Construction and Management Dept, MARA 3,605,989.44 3,287,200.26
CW1A01-CQWS2020-01: Civil works in Wushan County (package 1) Loan 3740 29 Apr 2022 Sichuan Lizhao Construction Group Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,144,231.56 1,112,540.40
CW1A01-CQZX2020-03: Civil works in Zhong County (package 3) Loan 3740 29 Apr 2022 Chongqing Longsheng Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,165,944.57 1,133,652.05
CW1A08- HBCB2020-01: Civil works in Chibi City (Taipingkou Village,Dongliu Village, Canghu Ecological Agriculture Development Zone, Chibi Town) Loan 3740 13 Apr 2022 Yichang Fangyuan Water Conservancy and Hydropower Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,305,585.02 1,153,108.06
CW1A04-HBYD2021-02: Construct 6km ditch, 11.1km road, 16 grit chambers, 1 auxiliary structure and repair 2 ponds Loan 3740 26 Apr 2022 Hubei Chuyao Water Conservancy and Hydropower Engineering Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,295,027.52 1,159,183.75
CW1A01-CQFL2020-01: Civil works in Fuling County (package 1) Loan 3740 29 Apr 2022 Chongqing Yiyiyi Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,192,375.91 1,159,351.33
CW1A01-CQWS2020-03: Civil works in Wushan County (package 3) Loan 3740 29 Apr 2022 Chongqing Ereryi Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,277,930.91 1,242,536.76
CW2B02-HBHH2020-01: 24.3km embankment Loan 3740 26 Apr 2022 Hubei Zhuoyu Construction Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,392,709.41 1,246,619.16
CW1A01-CQZX2020-04: Civil works in Zhong County (package 1) Loan 3740 29 Apr 2022 Chongqing Huisheng Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,297,882.97 1,261,936.22
CW1A01-CQJJ2020-01: Civil works in Jiangjin County (package 1) Loan 3740 29 Apr 2022 Chongqing Shengshihua Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,317,231.03 1,280,748.41
CW1A06- HBZJ2019-01: 280ha drip irrigation and 40ha sprinkler irrigation in Zhijiang City Loan 3740 13 Apr 2022 Yichang Jinli Water Conservancy and Hydropower Engineering Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 1,153,945.15 1,019,177.94
CW1A01- SCJG2019-01: Civil works in Jiange County Loan 3740 18 Apr 2022 Ligang Construction Group Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 2,404,838.00 2,107,105.34
CW1A01-CQZX2020-01 Loan 3740 29 Apr 2022 Chongqing Fubo Construction Engineering Co., Ltd. | Chongqing Farmland Construction and Management Dept, MARA 1,118,045.15 1,087,079.27
CW1A04-HBDY2021-01: civil works in Dangyang City Loan 3740 26 Apr 2022 Hubei Longyuzhou Engineering Construction Co., Ltd. | Hubei Farmland Construction and Management Dept, MARA 2,398,956.94 2,147,314.91
CW1A04-GZSN2021-02: Construct 12.7km main road, 8.8km production road, 2.9km ditch and 48 pools Loan 3740 03 Mar 2022 Guizhou Qianhaiyuan Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,489,121.13 1,280,277.27
CW1A02-GZSN2019-02: Construct 17.9km main road, 13.7km production road, 2.5km ditch and 42 pools Loan 3740 03 Mar 2022 Guizhou Sifangyin Ecological Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 1,979,185.84 1,701,612.18
CW2A-HNNA2021-01: 5641 anaerobic purification tanks and pollutant emission early warning monitoring station Loan 3740 09 Feb 2022 Henan Xinpin Construction Engineering Co., Ltd. | Henan Farmland Construction and Management Dept, MARA 2,030,452.19 1,987,345.65
CW1A02-GZBJ2019-01: Construct 4.2km embarkment, 4.2km channel, 7.3km main road and 6.4km production road Loan 3740 05 Jan 2022 Qianxin Construction Engineering Co., Ltd. | Guizhou Farmland Construction and Management Dept, MARA 2,127,941.54 1,843,505.10
Green finance supports research on regional agricultural ecological construction and industrial development Loan 3740 30 Jul 2021 University of International Business and Economics | Beijing Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs 101,000.00 101,000.00
Research on international experience and development model of regional agro-ecological construction Loan 3740 30 Jul 2021 Agricultural Information Institute Chinese Academy of Agricultural Sciences | Beijing Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs 101,600.00 101,600.00
Study on the effect of the implementation of the Yangtze River Ecological Corridor Project on the green and high-quality development of regional agriculture Loan 3740 30 Jul 2021 Institute of Agricultural Resources and Regional Planning Chinese Academy of Agricultural Science | Beijing Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs 101,888.00 101,888.00
Research on the mode and method of rural women's participation in agricultural ecological development Loan 3740 30 Jul 2021 Central University of Finance and Economics | Beijing Farmland Construction and Management Department, Ministry of Agriculture and Rural Affairs 151,000.00 151,000.00
CW1A01-SCZH2018-01, Civil works in Shuangshi Village, Hongyan Town Loan 3740 05 Aug 2021 Sichuan Dongyi Construction Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 1,630,759.11 1,481,305.58
CW1A01-SCWC2019-01, Civil works in Donghe Town Loan 3740 05 Aug 2021 Sichuan Dafu Construction Engineering Co., Ltd. | Sichuan Farmland Construction and Management Dept, MARA 2,172,140.94 1,973,071.60
CW1A01-GZYJ2018-02 CONSTRUCT 8.75KM MAIN ROAD, 14. 1KM PRODUCTION ROAD, 3.6HA LOW PRESSURE PIPELINE, 0.94KM DITCH, 17 POOLS, ETC. Loan 3740 10 May 2021 GUIZHOU GUANGYUNLONG CONSTRUCTION ENGINEERING | GUIYANG CHINA, PEOPLE'S REP. OF Farmland Construction and Management Dept, MARA 1,226,906.64 1,076,840.86
CW1A01-GZBJ2018-01 RIVER EMBANKMENT OF 5.78KM Loan 3740 19 May 2021 GUIZHOU CONSTRUCTION ENGINEERING GROUP FIFTH | GUIZHOU CHINA, PEOPLE'S REP. OF Farmland Construction and Management Dept, MARA 1,420,103.34 1,237,610.06
CW1A01-GZBJ2018-02 CONSTRUCT 2KM CHANNEL, 13.1KM M AIN ROAD AND 0.4KM FIELD ROAD Loan 3740 19 May 2021 GUIZHOU SANPU CONSTRUCTION ENGINEERING (GROUP | GUIZHOU CHINA, PEOPLE'S REP. OF Farmland Construction and Management Dept, MARA 1,438,455.46 1,253,603.80
CW2A-HNSF2020-01 HUTANG VILLAGE HEJIABAO ECOLOGICA L AGRICULTURE MODERN INDUSTRIAL PARK POLLUTANT EMI SSION REDUCTION Loan 3740 11 Mar 2021 HUNAN XIANGYU ENGINEERING CO., LTD. | LOUDI, HUNAN CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 1,125,199.13 1,082,070.08
CW2B03-CQ2019-01 340,500 CITRUS SEEDLING, 189,000 PLUM SEEDLING, 26,000 LOQUAT SEEDLING AND 5,000 WA LNUT SEEDLING Loan 3740 26 Mar 2021 CHONGQING XINYEYUAN AGRICULTURAL DEVELOPMENT | CHONGQING CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 2,419,889.04 2,359,560.36
CW1A01-CQJJ2019-01 1.9KM DRAINAGE DITCH, 14 POOLS, 9 PONDS, AND 6.85KM LOW-PRESSURE PIPELINE Loan 3740 22 Dec 2020 CHONGQING SHENGSHIHUA CONSTRUCTION ENGINEERIN | CHONGQING CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 1,019,482.82 1,013,624.13
CW1A-HNLI2018-01 DRAINAGE & IRRIGATION DITCHES 4.8 KM, FIELD ROADS 6.3KM, 79 CANAL STRUCTURES, 1 RIVE R DAM, 1.3KM ECO-REVETMENT SLOPE Loan 3740 15 Dec 2020 HUNAN POWER ENGINEERING CO., LTD. | HUNAN CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 1,648,224.99 1,623,737.76
CW1A01-SCYT2018-01 CIVIL WORKS IN YANTING (CONSTRU CTION 4.79KM CHANNEL, 6 IRRIGATION STATIONS, 15.87 KM ROAD, 86.28HA MICRO-IRRIGATION, 43 R'RS,ETC.) Loan 3740 25 Sep 2020 SICHUAN DONGYI CONSTRUCTION ENGINEERING CO., | SICHUAN CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 2,135,225.46 1,933,145.98
CW1A01-SCNB2018-01 CIVIL WORKS OF NANBU IN 2019(C ONSTRUCT 13.69KM DITCHES, 13.64KM ROAD, 42 RESERVO IRS, 66.98HA TERRACING, ETC.) Loan 3740 25 Sep 2020 SICHUAN HONGHE CONSTRUCTION CO., LTD. | SICHUAN CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 2,147,352.95 1,948,782.09
CIVIL WORKS IN WUSHAN, CHONGQING (0.9KM DRAINAGE D ITCH, 5.4KM MACHINE ROAD, 3.8KM PRODUCTION ROAD, 3 .8KM PIPELINE, 2 RESERVOIRS) Loan 3740 25 Aug 2020 JIANGXI PACIFIC CONSTRUCTION GROUP CO., LTD. | JIANGXI CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 1,109,776.02 1,109,776.02
FIELD ENGINEERING IN JIANGE COUNTY OF 2019 (4.04KM CHANNEL, 6.9KM ROAD, 5 RESERVOIRS, 1.07KM RIVERBAK PROTECTION, 35HA LAND CONSOLIDATION) Loan 3740 26 Aug 2020 XIANGSHENG CONSTRUCTION ENGINEERING CO., LTD. | CHENGDU, SICHUAN CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 1,665,794.62 1,533,655.48
FIELD ENGINEERING CONSTRUCTION FOR WANGCANG COUNTY OF 2019 (19.19KM CHANNEL, 18KM ROAD, 39 RESERVOIRS 1 POND, 22.64HA TERRACING) Loan 3740 26 Aug 2020 NUCLEAR INDUSTRY SOUTHWEST CONSTRUCTION GROUP | CHENGDU, SICHUAN CHINA,PEOPLE'SREP.OF Farmland Construction and Management Dept, MARA 2,038,167.85 1,876,490.20

Procurement Plan