Regional : Regional Cooperation on Renewable Energy Integration to the Grid
The proposed knowledge and support technical assistance (TA) will support Afghanistan, Kazakhstan, Kyrgyz Republic, Pakistan, Tajikistan, Turkmenistan, and Uzbekistan (the region) increase intermittent renewable energy generation (solar and wind power generation) by providing training to transmission grid operators on modernized control techniques to address renewable energy intermittency and by analyzing regional cooperation arrangement options.
The TA will recruit consultants to solve the identified problems through following studies, among others:
(i) To estimate necessary grid reinforcement investment to accept large-scale intermittent renewable energy connection which are planned in the countries. A harmonized regional roadmap of renewable energy integration will be prepared.
Project Details
-
Project Officer
Abado, Sarin
Central and West Asia Department
Request for information -
Country/Economy
Regional -
Sector
- Energy
Project Name | Regional Cooperation on Renewable Energy Integration to the Grid | ||||
Project Number | 51148-001 | ||||
Country / Economy | Regional Afghanistan Kazakhstan Kyrgyz Republic Pakistan Tajikistan Turkmenistan Uzbekistan |
||||
Project Status | Closed | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Inclusive economic growth Regional integration |
||||
Drivers of Change | Knowledge solutions Partnerships |
||||
Sector / Subsector | Energy / Electricity transmission and distribution - Renewable energy generation - solar - Renewable energy generation - wind |
||||
Gender | No gender elements | ||||
Description | The proposed knowledge and support technical assistance (TA) will support Afghanistan, Kazakhstan, Kyrgyz Republic, Pakistan, Tajikistan, Turkmenistan, and Uzbekistan (the region) increase intermittent renewable energy generation (solar and wind power generation) by providing training to transmission grid operators on modernized control techniques to address renewable energy intermittency and by analyzing regional cooperation arrangement options. The TA will recruit consultants to solve the identified problems through following studies, among others: (i) To estimate necessary grid reinforcement investment to accept large-scale intermittent renewable energy connection which are planned in the countries. A harmonized regional roadmap of renewable energy integration will be prepared. (ii) To assess the benefit of using regional cooperation approach to achieve the above grid reinforcement, specifically to develop balancing capacity reserve, compared with the case without the cooperation. The capacity reserve provided by backup generators, such as gas turbines and hydro power plants, would balance with intermittent power from solar and wind power plants. The application of regional balancing coordination mechanism to the region, which is one of the regional cooperation schemes to share the capacity reserve among the countries, will be analyzed. Possible harmonized cooperation framework will be designed. (iii) To evaluate the impact of high-technology operation supporting tools, such as Energy Management Systems (EMS) with renewable energy output forecasting and demand response so that the most effective tools will be selected to be used in daily dispatching in the region. (iv) To provide capacity building to the countries' grid operators on the system operation of grid with intermittent renewable energy. Its topic will focus on the above mentioned regional balancing mechanism and the tools, e.g. how to utilize tools at their daily power dispatching operation. The transmission companies will be equipped with trained operation staff. The TA findings will be disseminated to the countries at workshops and meetings mainly at CAREC-ESCC through a working committee, which will be established for this TA. The capacity building will be also provided to the working committee members, who will be composed of grid operators of the target countries. |
||||
Project Rationale and Linkage to Country/Regional Strategy | The TA was agreed by the countries at the Energy Sector Coordinating Committee (ESCC) meeting under the Central Asia Regional Economic Cooperation (CAREC) to address the challenges of securely and less costly integrating renewable energy to the grid. This TA is aligned with ESCC's work plan. Despite abundant renewable energy potential, the current installed capacity share of intermittent renewable energy power generation in the region is less than 5% on average, while the majority of electricity is generated from fossil fuels or traditional hydropower. The region's abundant solar resource (8,700 gigawatts) is enough to replace the existing generation capacity of about 80 gigawatts. The countries committed to the targets of reducing carbon dioxide (CO2) emissions by 10% 15% of the 1990 levels on average by 2030 in their Nationally Determined Contributions (NDCs) and communications to the United Nations Framework Convention on Climate Change (UNFCCC). CO2 emissions could be doubled without any major action, such as promoting more renewable energy. Kazakhstan and Turkmenistan are among the world's top 20 countries with the highest CO2 emissions per capita. Thus, accelerating clean energy development is a top agenda in the region. While the costs of solar and wind power generations are becoming competitive with conventional generation, making it financially and environmentally more viable, lack of technical experience to address the intermittency of renewable energy generation remains as one of major technical challenges for renewable energy adaptation into generation mix. This TA will assist the countries in achieving their target by addressing this challenge: (i) training transmission operators on modernized techniques to control the intermittency, and (ii) analyzing least-cost balancing capacity reserve development. Lessons from leading renewable energy countries like Germany show that regional cooperation is less costly than national remedies. The wider the regional connectivity and cooperation, the less total backup generation or storage capacity to balance with intermittency is necessary. The TA is expected to facilitate the transition by exploring regional cooperation arrangements to increase energy security and decrease costs. Seven Central and West Asian countries were selected because they are geographically connected, enabling them to share backup generators or storage capacity. Since these countries have historically shared electricity with each other, their legacy-sharing protocols and/or mechanisms can be easily utilized. |
||||
Impact | (i) Selected CAREC countries' emissions reductions target achieved (ii) CAREC regional cooperation framework accomplished |
Project Outcome | |
---|---|
Description of Outcome | CAREC countries' transmission capacities for renewable energy enhanced |
Progress Toward Outcome | In progress based on the ESCC-supported road map of regional transmission system cooperation for increasing renewable energy (CAREC Energy Strategy 2030). |
Implementation Progress | |
Description of Project Outputs | Transmission grid reinforcement investment plan developed Regional cooperation framework to share balancing capacity reserve designed Transmission system operation enhancement tools analyzed Utilities' system operation skills reinforced |
Status of Implementation Progress (Outputs, Activities, and Issues) | The technical assistance project is almost completed. All reports were finalized and submitted.Six working committee meetings were held which resulted in achieving 4 key outputs: Output 1-Grid reinforcement plan ready to accept intermittent renewable energy; Output 2- Regional cooperation framework to share balancing capacity reserve; Output 3 Dispatch operation support tool; and Output 4 Capacity building on international best practices regarding balancing capacity reserves under regional cooperation to the 15 working committee members (2 delegates by country and a delegate from Coordinating Dispatch Centre _Energiya_ of Central Asian Power System). |
Geographical Location | Afghanistan - Nation-wide; Kazakhstan - Nation-wide; Kyrgyz Republic - Nation-wide; Pakistan - Nation-wide; Tajikistan - Nation-wide; Turkmenistan - Nation-wide; Uzbekistan - Nation-wide |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | A consulting firm has been engaged to support the working committee in the administration and coordination of TA activities. An individual consultant will also be recruited to evaluate the local impact of intermittent renewable energy integration. |
Responsible ADB Officer | Abado, Sarin |
Responsible ADB Department | Central and West Asia Department |
Responsible ADB Division | Energy Division, CWRD |
Executing Agencies |
Asian Development Bank 6 ADB Avenue, Mandaluyong City 1550, Philippines |
Timetable | |
---|---|
Concept Clearance | 10 Jun 2017 |
Fact Finding | 11 May 2017 to 12 May 2017 |
MRM | - |
Approval | 07 Sep 2017 |
Last Review Mission | - |
Last PDS Update | 31 Mar 2020 |
TA 9365-REG
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
07 Sep 2017 | - | 07 Sep 2017 | 30 Jun 2019 | 30 Jun 2020 | 21 Jul 2020 |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
0.00 | 1,500,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1,500,000.00 | 17 Jun 2022 | 1,204,199.62 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
Regional Cooperation on Renewable Energy Integration to the Grid: Technical Assistance Completion Report | TA Completion Reports | Oct 2020 |
Regional Cooperation on Renewable Energy Integration to the Grid: Technical Assistance Consultant’s Report | Consultants' Reports | Jun 2020 |
Regional Cooperation on Renewable Energy Integration to the Grid: Technical Assistance Report | Technical Assistance Reports | Sep 2017 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Tender Title | Type | Status | Posting Date | Deadline |
---|---|---|---|---|
UZB: Local Impact Study on Connecting Intermittent Renewable Energy to the Grid | Individual - Consulting | Closed | ||
Regional Cooperation on Renewable Energy Integration to the Grid | Firm - Consulting | Closed |
Contracts Awarded
Contract Title | Approval Number | Contract Date | Contractor | Address | Executing Agency | Total Contract Amount (US$) | Contract Amount Financed by ADB (US$) |
---|---|---|---|---|---|---|
Capacity Development | Technical Assistance 9365 | 26 Dec 2017 | RTE INTERNATIONAL(FRANCE) in association with CORESO() | 1 TERRASSE BELLINI TSA 41000 92919 LA DEFENSE CEDEX FRANCE | None | 1,219,392.00 | — |
Procurement Plan