India : Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project

Sovereign Project | 51308-001

The Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project will address the core problem of meeting the expected industrial power demand to ensure reliable power supply by augmenting the power transmission capacity between the southern part of the state (Madurai-Thoothukudi), the northern region (Chennai), and the western region (Coimbatore) at 765 kilovolt (kV) level. The proposed investment is expected to provide a transmission corridor to evacuate power from the renewable and thermal power plants to be located in Madurai-Thoothukudi area and supply industrial hubs in the Chennai-Madurai area and in Coimbatore.

The proposed project will have two outputs consisting of:

Project Name
Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project
Project Number
51308-001
Country / Economy
  • India
Project Status
Active
Project Type / Modality of Assistance
  • Loan
  • Technical Assistance
Source of Funding / Amount
Loan 3850-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project
Source Amount
Ordinary capital resources US$ 451.00 million
TA 9843-IND: Institutional Capacity Building of Tamil Nadu Transmission Corporation Limited
Source Amount
Technical Assistance Special Fund US$ 650,000.00
TA 9843-IND: Institutional Capacity Building of Tamil Nadu Transmission Corporation Limited (Supplementary)
Source Amount
Technical Assistance Special Fund US$ 350,000.00
TA 9843-IND: Institutional Capacity Building of Tamil Nadu Transmission Corporation Limited (Supplementary)
Source Amount
Technical Assistance Special Fund US$ 150,000.00
Operational Priorities
  • OP2: Accelerating progress in gender equality
  • OP3: Tackling climate change, building climate and disaster resilience, and enhancing environmental sustainability
  • OP6: Strengthening governance and institutional capacity
Sector / Subsector
  • Energy / Electricity transmission and distribution

Gender
Some gender elements
Description

The Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project will address the core problem of meeting the expected industrial power demand to ensure reliable power supply by augmenting the power transmission capacity between the southern part of the state (Madurai-Thoothukudi), the northern region (Chennai), and the western region (Coimbatore) at 765 kilovolt (kV) level. The proposed investment is expected to provide a transmission corridor to evacuate power from the renewable and thermal power plants to be located in Madurai-Thoothukudi area and supply industrial hubs in the Chennai-Madurai area and in Coimbatore.

The proposed project will have two outputs consisting of:

(i) Output 1: This will establish a 765 kV power transmission link between the energy generation hub in MaduraiThoothukudi area and load centers in the western and northern parts of the state. This output consists of (a) Virudhunagar (765/400/230 kV, 2x1,500 megavolt amperes [MVA] and 2x500 MVA) substation; (b) 320 km of 765 kV transmission lines from Virudhunagar to Coimbatore; and (c) 356 km of 400 kV transmission lines to link Virudhunagar substation to several 400/230 kV pooling substations for wind and solar power plants; and

(ii) Output 2: This will establish a pooling substation to receive electricity generated from power plants in the Thoothukudi district. This consists of (a) Ottapidaram (400/230/110 kV, 2x315 MVA and 2x200 MVA) substation; (b) 200 km of 400 kV transmission lines to connect Ottapidaram substation with several thermal and renewable power plants; and (c) 90 km of 230 kV and 110 kV transmission lines to connect Ottapidaram substation with nearby load centers.

(iii) : Financial and institutional capacity of Tamil Nadu Transmission Corporation Limited improved. This output will (i) assist TANTRANSCO in implementing the FRP to restore its financial sustainability; (ii) support the financial management action plan (FMAP) to improve the financial management capacity and corporate governance of TANTRANSCO; (iii) facilitate the introduction of gender-sensitive workplace practices; and (iv) enhance the capacity of TANTRANSCO to monitor the environmental and social impacts of transmission projects. The attached TA will support these activities.

Project Rationale and Linkage to Country/Regional Strategy

The MaduraiThoothukudi area of CKIC has excellent wind and solar resources, of which about 4,000 MW is proposed for development in the next 5 years. In addition, 4,000 MW of thermal capacity additions will also be located in this region. Due to inadequate transmission network capacity, there has been curtailment of wind and solar energy and this will continue to act as a barrier to the further development of renewable energy in the region. These constraints may also cause the reliability of power supply to industrial nodes in ChennaiTrichy area of CKIC and in Coimbatore to deteriorate, hindering further expansion of industrial development of the state.

Required strengthening of the transmission network includes a critical need to improve the transmission connectivity at extra high voltage 765 kilovolt (kV) level between the proposed energy hub in MaduraiThoothukudi area in the southeast region of Tamil Nadu and demand centers in ChennaiMadurai in the northern area of CKIC and Coimbatore. In addition, the proposed renewable energy hubs need to be connected to the 765 kV network through pooling substations at 400 kV level. Industrial parks in MaduraiThoothukudi area also require connectivity at 230 kV level to meet the expected increase in electricity demand.

Impact

Industrial development and renewable energy utilization in Tamil Nadu enhanced

Project Outcome

Description of Outcome

Power supply in the CKIC increased in a financially sustainable manner

Progress Toward Outcome
Progress will be measured on physical completion of the packages.

Implementation Progress

Description of Project Outputs

Transmission link from southern CKIC to load centers in northern CKIC established

Pooling substation established in Thoothukudi District

Financial and institutional capacity of TANTRANSCO improved

Strategic recommendation to improve the financial sustainability and operational efficiency of Tamil Nadu power sector made.

Status of Implementation Progress (Outputs, Activities, and Issues)
All works and Consultancy contracts envisaged under the loan awarded. The Project is being implemented smoothly.
Geographical Location
Tamil Nadu

Safeguard Categories

Environment
B
Involuntary Resettlement
B
Indigenous Peoples
C

Summary of Environmental and Social Aspects

Environmental Aspects
The Environmental Consultants are on field, and working with in coordination with the EA towards environmental compliance.
Involuntary Resettlement
Indigenous Peoples

Stakeholder Communication, Participation, and Consultation

During Project Design
Undertaken.
During Project Implementation
Being undertaken.

Business Opportunities

Consulting Services
A transaction technical assistance of $500,000 to be financed through TASF Others is proposed to (i) enhance TANTRANSCO's financial management capacity; (ii) address remaining legacy issues from incomplete unbundling of TANTRANSCO (transmission company) from distribution and generation operations of erstwhile Tamil Nadu Electricity Board (TNEB); and (iii) enhance gender inclusivity of the project.
Procurement
Advanced procurement action will be used for procurement of EPC contractors for supply and installation of substations and transmission lines. It is likely that contracts up to 30% of the proposed loan amount may be awarded as advanced contracts. The recommended project procurement classification is category A given (i) the presence of high value contracts in excess of $100 million; (ii) TANTRANSCO''s lack of experience in implementing ADB-financed projects.

Contact

Responsible ADB Officer
Banerjee, Jyotirmoy
Responsible ADB Department
Sectors Group
Responsible ADB Division
Energy Sector Office (SG-ENE)
Executing Agencies
Ministry of Finance (Aid Accounts & Audit Division)
Tamil Nadu Transmission Corporation Limited (TANTRANSCO)

Timetable

Concept Clearance
12 Jul 2018
Fact Finding
21 Jan 2019 to 28 Jan 2019
MRM
31 Jul 2019
Approval
04 Nov 2019
Last Review Mission
-
Last PDS Update
13 Dec 2022

Funding

Loan 3850-IND

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
04 Nov 2019 28 Nov 2019 17 Jan 2020 30 Jun 2025 - -
Financing Plan
  Total (Amount in US$ million)
Project Cost 653.50
ADB 451.00
Counterpart 202.50
Cofinancing 0.00
Loan Utilization
  Date ADB Others Net Percentage
Cumulative Contract Awards 01 Jul 2024 384.03 0.00 85%
Cumulative Disbursements 01 Jul 2024 284.62 0.00 63%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating Partly satisfactory - - Unsatisfactory - -

TA 9843-IND

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
04 Nov 2019 30 Dec 2019 30 Dec 2019 30 Nov 2021 29 Dec 2024 -
Financing Plan/TA Utilization
ADB Cofinancing Counterpart Total
Gov Beneficiaries Project Sponsor Others
1,150,000.00 0.00 0.00 0.00 0.00 0.00 1,150,000.00
Cumulative Disbursements
Date Amount
01 Jul 2024 1,116,967.61
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating Unsatisfactory - - Unsatisfactory - -

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project: Audited Project Financial Statements (April 2022-March 2023) Audited Project Financial Statements Oct 2023
Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project: Audited Project Financial Statements (April 2021-March 2022) Audited Project Financial Statements Jun 2022
Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project: Audited Project Financial Statements (April 2020-March 2021) Audited Project Financial Statements Jun 2022
Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project: Audited Project Financial Statements (April 2019-March 2020) Audited Project Financial Statements May 2021
Amendment to the Loan Agreement (Ordinary Operations) for Loan 3850-IND Chennai-Kanyakumari Industrial Corridor: Power Sector Investment Project Loan Agreement (Ordinary Resources) Feb 2021
Loan Agreement (Ordinary Operations) for Loan 3850-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project Loan Agreement (Ordinary Resources) Nov 2019
Project Agreement for Loan 3850-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project Project/Program Agreements Nov 2019
Institutional Capacity Building of Tamil Nadu Transmission Corporation Limited: Technical Assistance Report Technical Assistance Reports Oct 2019
Chennai-Kanyakumari Industrial Corridor - Power Sector Investment Project: Report and Recommendation of the President Reports and Recommendations of the President Oct 2019
Chennai-Kanyakumari Industrial Corridor - Power Sector Investment Project: Project Administration Manual Project/Program Administration Manual Oct 2019
Chennai-Kanyakumari Industrial Corridor - Power Sector Investment Project: Procurement Plan Procurement Plans Jan 2019
Chennai–Kanyakumari Industrial Corridor Power Sector Investment Project: Initial Poverty and Social Analysis Initial Poverty and Social Analysis Jun 2018

Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Environmental Monitoring Report (July-December 2023) Environmental Monitoring Reports May 2024
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (January-June 2023) Social Monitoring Reports Mar 2024
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (July-December 2023) Social Monitoring Reports Mar 2024
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (July-December 2022) Social Monitoring Reports Jun 2023
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (January-June 2022) Social Monitoring Reports Nov 2022
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (July-December 2021) Social Monitoring Reports May 2022
Chennai–Kanyakumari Industrial Corridor – Power Sector Investment Project: Addendum to Initial Environmental Examination Initial Environmental Examination Feb 2022
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (January-June 2021) Social Monitoring Reports Sep 2021
Chennai-Kanyakumari Industrial Corridor Power Transmission Improvement Project: Updated Resettlement Plan Resettlement Plans Aug 2021
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Environmental Monitoring Report (January-June 2021) Environmental Monitoring Reports Aug 2021
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Environmental Safeguard Monitoring Report (July-December 2020) Environmental Monitoring Reports Mar 2021
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (August-December 2020) Social Monitoring Reports Feb 2021
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Social Monitoring Report (February-July 2020) Social Monitoring Reports Sep 2020
Chennai-Kanyakumari Industrial Corridor – Power Sector Investment Project: Environmental Safeguard Monitoring Report (February-July 2020) Environmental Monitoring Reports Jul 2020
Chennai–Kanyakumari Industrial Corridor – Power Sector Investment Project: Draft Initial Environmental Examination Initial Environmental Examination Jul 2019
Chennai-Kanyakumari Industrial Corridor Power Transmission Improvement Project: Resettlement Plan Resettlement Plans May 2019
Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project: Initial Environmental Examination (Draft) Initial Environmental Examination May 2019

Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Environment Supervision and Monitoring Specialist Individual - Consulting Closed
Heath and Safety Monitoring Consultant Individual - Consulting Closed
Strategic Study on Tamilnadu Power Sector Firm - Consulting Closed
Gender Specialist Individual - Consulting Closed
Support for the implementation of the FRP and Ind-As Firm - Consulting Closed
Social Safeguard Monitoring Expert Individual - Consulting Closed
Environmental Monitoring Expert Individual - Consulting Closed
Support for the implementation of the FRP and Ind-As Firm - Consulting Closed
Financial Management Advisor Individual - Consulting Closed
51308-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project [Package No. 9] Invitation for Bids Closed
Loan No. 51308-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project [Package No. VII] Invitation for Bids Closed
Loan No. 51308-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project [Package No. X] Invitation for Bids Closed
Loan No. 51308-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project [Package No. V] Invitation for Bids Closed
Loan No. 51308-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project [Package No. VI] Invitation for Bids Closed
Loan No. 51308-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project [Package No. IV] Invitation for Bids Closed
Loan No. 51308-IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project [Package No. II] Invitation for Bids Closed
IND: Chennai-Kanyakumari Industrial Corridor Power Sector Investment Project Advance Notice Active

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
Strategic Study on Tamil Nadu Power Sector Loan 3850 16 Nov 2021 ERNST AND YOUNG LIMITED, NEW DELHI | 3rd and 6th Floor, Worldmark - 1, Aerocity, New Delhi - 110 037 Tamil Nadu Transmission Corporation Limited 12,982,010.54 1,284,724.79
Capacity Development Technical Assistance 9843 16 Dec 2020 KPMG Assurance and Consulting Services LLP(INDIA) | DLF Building No 10, 8th Floor, Tower B, City, Phase 2 Gurgaon, Haryana 122002 In Tamil Nadu Transmission Corporation Limited 447,325.00
PACKAGE 5(T-21)765KV DC TRANSMISSION LINE-PACKAGE 2 ASSOCIATED WITH 765/400KV VIRUDHUNAGAR STATION Loan 3850 28 Jan 2020 M/S KEC INTERNATIONAL LIMITED,GURGAON | RPG HOUSE,FIRST FLOOR 463 DR. ANNIE BESANT ROAD,MUMBAI 400030 INDIA Tamil Nadu Transmission Corporation Limited 62,227,989.68 62,227,989.68
PACKAGE 4(T-20) 765KV DC TRANSMISSION LINE-PACKAGE 1, ASSOCIATED WITH 765/400 KV VIRUDHUNAGAR STATION Loan 3850 28 Jan 2020 KALPATARU POWER TRANSMISSION LIMITED | 101 PART III GIDC ESTATE,SECTION 28, GANDHINAGAR,GUJARAT 382028 INDIA Tamil Nadu Transmission Corporation Limited 62,253,126.88 62,253,126.88
PACKAGE 7(T-2096) OTTAPIDARAM 400KV SUBSTATIONS & ASSOCIATED 400KV TRANSMISSION LINES Loan 3850 21 Jan 2020 LARSEN & TOUBRO LIMITED, CHENNAI 600 089 | P.O. BOX 979 MOUNT POONAMMALLEE ROAD, CHENNAI 600 089 TAMIL NADU INDIA Tamil Nadu Transmission Corporation Limited 100,881,413.90 100,644,556.40

Procurement Plan

Title Document Type Document Date
Chennai-Kanyakumari Industrial Corridor - Power Sector Investment Project: Procurement Plan Procurement Plans Jan 2019