Turkmenistan : Central Asia Regional Economic Cooperation Corridors 2, 3 and 6 (Turkmenabat-Mary) Railway Modernization Project
The Government of Turkmenistan intends to modernize the 1,147km line spanning the width of the country from Turkmenabat to Turkmenbashi, in three phases. This project intends to support the Government in the rehabilitation of the line from Turkmenabat to Mary, of 243km.
Project Details
-
Project Officer
Sakamoto, Ko
Central and West Asia Department
Request for information -
Country/Economy
Turkmenistan -
Sector
- Transport
Project Name | Central Asia Regional Economic Cooperation Corridors 2, 3 and 6 (Turkmenabat-Mary) Railway Modernization Project | ||||
Project Number | 51360-001 | ||||
Country / Economy | Turkmenistan |
||||
Project Status | Proposed | ||||
Project Type / Modality of Assistance | Loan |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth Regional integration |
||||
Drivers of Change | Gender Equity and Mainstreaming Governance and capacity development Knowledge solutions Partnerships |
||||
Sector / Subsector | Transport / Rail transport (non-urban) |
||||
Gender Equity and Mainstreaming | Effective gender mainstreaming | ||||
Description | The Government of Turkmenistan intends to modernize the 1,147km line spanning the width of the country from Turkmenabat to Turkmenbashi, in three phases. This project intends to support the Government in the rehabilitation of the line from Turkmenabat to Mary, of 243km. | ||||
Project Rationale and Linkage to Country/Regional Strategy | Rail transport has a unique competitive advantage over road transport for moving commodities and goods in bulk over long distances. The more than 3,000 km Turkmenistan rail network plays a vital role in the transport of both freight and passengers. Since 2012, Turkmenistan's gross domestic product has grown by an average of 8.9% per year, contributing to strong demand for rail transport. Turkmenistan has continued to modernize and expand its railway infrastructure. MRT is gradually implementing a holistic railway modernization program, including the completion of new railway lines, modernization of existing lines, and improvement of rolling stock. Electrification of the network, as well as double-tracking of main lines are currently being studied.
Despite these efforts, the railways still face long transport times, inadequate service quality, and high operating costs, because of aged or inadequate infrastructure, operational inefficiencies, competition from road transport, and insufficient rolling stock. This results in lost economic opportunities, suboptimal regional trade, and negative environmental impacts. The Government intends to tackle this core problem by modernizing the 1,147km line spanning the width of the country from Turkmenabat to Turkmenbashi. This is the arterial line for Turkmenistan's railway network, linking approximately 3/4ths of the urban population along its route. Yet, the line is in poor state, arising from a backlog of maintenance issues, partly inherited from the Former Soviet Union. The last capital repair was completed in the 1970s. Operational speeds are limited to 30km/hour, and major safety issues are existent. The poor state of the line poses a major challenge to the further expansion of freight and passenger train services on a reliable and safe basis. The Government prioritizes the Turkmenabat-Mary section as Phase 1, primarily due to the higher traffic volume on this section of the track, with Mary serving as a key junction. |
||||
Impact | Accelerate diversification, improve infrastructure, modernize institutions, and increase competitiveness. | ||||
Outcome | Travel costs and environmental costs reduced for passenger and freight transport between Turkmenabat and Mary | ||||
Outputs | Track rehabilitated between Turkmenabat and Mary Signaling and communication equipment installed Specialized machinery and equipment commissioned Sleeper factory constructed |
||||
Geographical Location |
Safeguard Categories | |
---|---|
Environment | B |
Involuntary Resettlement | B |
Indigenous Peoples | C |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | The project is expected to contribute to a reduction of local pollutants as well as greenhouse gases. Concerns of potential environmental impacts would include change in the level of noise and vibration due to the increased speed and frequency of train movement. The project is initially suggested as B-category for Environment. This assessment and classification are subject to the final scope of the project and the results of due diligence to be conducted. |
Involuntary Resettlement | There will likely be some land acquisition and resettlement, and the project is suggested to be classified as category B for the involuntary resettlement safeguard, according to ADB's Safeguard Policy Statement (SPS) of 2009. This assessment and classification are subject to the final scope of the project and the results of due diligence to be conducted. |
Indigenous Peoples | The country in general, and the project area in particular, does not have indigenous peoples communities as defined in ADB's SPS for operational purposes. It is proposed to classify the project for the indigenous peoples safeguard as category C, and no further action will be required. This assessment and classification are subject to the final scope of the project and the results of due diligence to be conducted. |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | The main stakeholder of the project is the Ministry of Railway Transport, who is in charge of construction, maintenance and operation of railway lines in Turkmenistan. Other important stakeholders include local governments, residents residing directly alongside the railway line, and businesses which will benefit from the project. Such stakeholders will be consulted through local governments. |
During Project Implementation | The same stakeholders listed above will continue to be consulted during project implementation. Opportunities to maximize positive social impact from the project will continue to be pursued. Records of such consultations shall be recorded for ongoing reference and to serve as meaningful inputs to the project execution. |
Responsible ADB Officer | Sakamoto, Ko |
Responsible ADB Department | Central and West Asia Department |
Responsible ADB Division | Transport and Communications Division, CWRD |
Executing Agencies |
Ministry of Railway Transport of Turkmenistan 744007, 7 Saparmyrat Turkmenbashy The Great Avenue, Ashgabat, Turkmenistan |
Timetable | |
---|---|
Concept Clearance | 30 Sep 2018 |
Fact Finding | 04 Mar 2019 to 15 Mar 2019 |
MRM | 12 Apr 2019 |
Approval | - |
Last Review Mission | - |
Last PDS Update | 19 Sep 2018 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
None currently available.
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
None currently available.