fbpx 51395-001: Uttar Pradesh Power Distribution Network Rehabilitation Project | Asian Development Bank

India: Uttar Pradesh Power Distribution Network Rehabilitation Project

Sovereign (Public) Project | 51395-001 Status: Dropped / Terminated

The proposed project will provide long-term solutions and restore financial viability of power utilities in electricity distribution in Uttar Pradesh. Project outputs are (i) electricity distribution network in 20,000 rural habitations rehabilitated; (ii) institutional capacity of UPPCL on financial management, billing and collection, social inclusivity, and gender sensitivity enhanced; and (iii) awareness on efficient electricity usage in rural households improved.

 
Project Name Uttar Pradesh Power Distribution Network Rehabilitation Project
Project Number 51395-001
Country India
Project Status Dropped / Terminated
Project Type / Modality of Assistance Grant
Loan
Source of Funding / Amount
Loan: Uttar Pradesh Power Distribution Network Rehabilitation Project
Ordinary capital resources US$ 300.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Knowledge solutions
Partnerships
Private sector development
Sector / Subsector

Energy / Electricity transmission and distribution

Gender Equity and Mainstreaming Effective gender mainstreaming
Description The proposed project will provide long-term solutions and restore financial viability of power utilities in electricity distribution in Uttar Pradesh. Project outputs are (i) electricity distribution network in 20,000 rural habitations rehabilitated; (ii) institutional capacity of UPPCL on financial management, billing and collection, social inclusivity, and gender sensitivity enhanced; and (iii) awareness on efficient electricity usage in rural households improved.
Project Rationale and Linkage to Country/Regional Strategy Uttar Pradesh has the largest number of unelectrified households (12.6 million) among Indian states and its household electrification rate of 66% as of July 2018 is the second lowest. The electrification rate in rural areas is even lower at less than 35% compared to over 90% in urban areas. Majority of rural households have unmetered electricity connections and the average duration of electricity supply in rural areas in Uttar Pradesh is around 12 18 hours per day compared to 22 hours per day in urban areas. In addition, there is a large number of unmetered connections provided to farmers for water pumping. Limited access, poor, and unreliable supply of electricity in rural areas are the key reasons for low socio-economic development of the state.
Impact Availability of power supply to rural areas in Uttar Pradesh improved
Project Outcome
Description of Outcome Efficiency and sustainability of power supply in selected rural areas in Uttar Pradesh improved
Progress Toward Outcome
Implementation Progress
Description of Project Outputs

Electricity distribution network in 20,000 rural habitations rehabilitated

Institutional capacity of UPPCL on financial management, billing and collection, social inclusivity, and gender sensitivity enhanced

Awareness on efficient electricity usage in rural households improved

Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Uttar Pradesh
Safeguard Categories
Environment C
Involuntary Resettlement C
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services All procurement of goods, works, nonconsulting, and consulting services will be undertaken in accordance with ADB Procurement Policy (2017, as amended from time to time) and ADB''s Procurement Regulations for ADB Borrowers (2017, as amended from time to time).
Procurement All procurement of goods, works, nonconsulting, and consulting services will be undertaken in accordance with ADB Procurement Policy (2017, as amended from time to time) and ADB''s Procurement Regulations for ADB Borrowers (2017, as amended from time to time).
Responsible ADB Officer Perera, Pradeep
Responsible ADB Department South Asia Department
Responsible ADB Division Energy Division, SARD
Executing Agencies
Uttar Pradesh Power Corporation Limited (UPPCL)
Shakti Bhawan 14 Ashok Marg, Lucknow,
Uttar Pradesh, India
Timetable
Concept Clearance 07 Dec 2018
Fact Finding 23 Sep 2019 to 01 Oct 2019
MRM 20 Apr 2020
Approval -
Last Review Mission -
Last PDS Update 12 Dec 2018

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Project Management Agency for Paschimanchal Vidyut Vitran Nigam Ltd Firm - Consulting Closed 20 Aug 2019 03 Sep 2019
Project Management Agency for Project Management Agency for Madhyanchal Vidyut Vitran Nigam Ltd Firm - Consulting Closed 02 Aug 2019 16 Aug 2019
Project Management Agency for Project Management Agency for Madhyanchal Vidyut Vitran Nigam Ltd Firm - Consulting Closed 22 Jun 2019 06 Jul 2019
Project Management Agency (PMA) for Dakshinanchal Vidyut Vitaran Nigam Ltd. (DVVNL) Firm - Consulting Closed 16 Jun 2019 15 Jul 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: MVVNL/OCB/2019/08] Invitation for Bids Closed 13 Jun 2019 07 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: MVVNL/OCB/2019/09] Invitation for Bids Closed 13 Jun 2019 08 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: MVVNL/OCB/2019/010] Invitation for Bids Closed 13 Jun 2019 08 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: MVVNL/OCB/2019/011] Invitation for Bids Closed 13 Jun 2019 09 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: MVVNL/OCB/2019/012] Invitation for Bids Closed 13 Jun 2019 09 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: MVVNL/OCB/2019/07] Invitation for Bids Closed 13 Jun 2019 07 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: MVVNL/OCB/2019/013] Invitation for Bids Closed 13 Jun 2019 09 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: DVVNL/OCB/T-6/18-19/P17] Invitation for Bids Closed 10 Jun 2019 21 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: PVVNL/OCB/T-5/18-19/P25] Invitation for Bids Closed 10 Jun 2019 16 Sep 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: DVVNL/OCB/T-7/18-19/P18] Invitation for Bids Closed 10 Jun 2019 18 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: PVVNL/OCB/T-6/18-19/P26] Invitation for Bids Closed 10 Jun 2019 16 Sep 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: PVVNL/OCB/T-4/18-19/P21] Invitation for Bids Closed 10 Jun 2019 16 Sep 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: DVVNL/OCB/T-4/18-19/P19] Invitation for Bids Closed 10 Jun 2019 14 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: DVVNL/OCB/T-2/18-19/P14] Invitation for Bids Closed 10 Jun 2019 13 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: PVVNL/OCB/T-2/18-19/P22] Invitation for Bids Closed 10 Jun 2019 16 Sep 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: DVVNL/OCB/T-5/18-19/P20] Invitation for Bids Closed 10 Jun 2019 16 Jul 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: DVVNL/OCB/T-1/18-19/P15] Invitation for Bids Closed 10 Jun 2019 13 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: PVVNL/OCB/T-3/18-19/P23] Invitation for Bids Closed 10 Jun 2019 16 Sep 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: DVVNL/OCB/T-3/18-19/P16] Invitation for Bids Closed 10 Jun 2019 14 Aug 2019
L51395-IND: Uttar Pradesh Power Distribution Rehabilitation Project [OCB No: PVVNL/OCB/T-1/18-19/P24] Invitation for Bids Closed 10 Jun 2019 16 Sep 2019
Engagement of Project Management Agency (PMA) Firm - Consulting Closed 08 Jun 2019 07 Jul 2019
Project Management Consultants (PMC) Firm - Consulting Closed 30 May 2019 27 Jun 2019
Project Management Agency for Paschimanchal Vidyut Vitran Nigam Ltd Firm - Consulting Closed 01 May 2019 22 Jul 2019
Loan No. 51395-IND: Uttar Pradesh Power Distribution Network Rehabilitation Project [PuVVNL/OCB/18-19/03] Invitation for Bids Closed 15 Mar 2019 15 Jun 2019
Loan No. 51395-IND: Uttar Pradesh Power Distribution Network Rehabilitation Project [PuVVNL/OCB/18-19/04] Invitation for Bids Closed 15 Mar 2019 15 Jun 2019
Loan No. 51395-IND: Uttar Pradesh Power Distribution Network Rehabilitation Project [PuVVNL/OCB/18-19/05] Invitation for Bids Closed 15 Mar 2019 13 Jun 2019
Loan No. 51395-IND: Uttar Pradesh Power Distribution Network Rehabilitation Project [PuVVNL/OCB/18-19/06] Invitation for Bids Closed 15 Mar 2019 14 Jun 2019
Loan No. 51395-IND: Uttar Pradesh Power Distribution Network Rehabilitation Project [PuVVNL/OCB/18-19/01] Invitation for Bids Closed 15 Mar 2019 14 Jun 2019
Loan No. 51395-IND: Uttar Pradesh Power Distribution Network Rehabilitation Project [PuVVNL/OCB/18-19/02] Invitation for Bids Closed 15 Mar 2019 13 Jun 2019
IND: Uttar Pradesh Power Distribution Network Rehabilitation Project Advance Notice Active 14 Mar 2019

Contracts Awarded

No contracts awarded for this project were found

Procurement Plan

None currently available.