China, People's Republic of : Piloting Innovative Flash Flood Early Warning Systems in Selected River Basins
The outcome of the TA is efficient and effective flash flood preparedness and emergency response in the Yangtze River Economic Belt enhanced. The TA will have the following impact: flood risk management capacity in the Yangtze River Economic Belt improved. The TA will have the following outputs: (i) Flash flood early warning in selected river sub-basins upgraded; (ii) Capacity development for flash flood emergency response at local level enhanced; and (iii) Knowledge on flash flood early warning system disseminated.
Project Details
-
Project Officer
Osti, Rabindra P.
East Asia Department
Request for information -
Country/Economy
China, People's Republic of -
Sector
- Agriculture, natural resources and rural development
Project Name | Piloting Innovative Flash Flood Early Warning Systems in Selected River Basins | ||||
Project Number | 51428-001 | ||||
Country / Economy | China, People's Republic of |
||||
Project Status | Closed | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
Drivers of Change | Gender Equity and Mainstreaming Governance and capacity development Knowledge solutions |
||||
Sector / Subsector | Agriculture, natural resources and rural development / Rural flood protection - Rural water policy, institutional and capacity development - Water-based natural resources management |
||||
Gender | Some gender elements | ||||
Description | The outcome of the TA is efficient and effective flash flood preparedness and emergency response in the Yangtze River Economic Belt enhanced. The TA will have the following impact: flood risk management capacity in the Yangtze River Economic Belt improved. The TA will have the following outputs: (i) Flash flood early warning in selected river sub-basins upgraded; (ii) Capacity development for flash flood emergency response at local level enhanced; and (iii) Knowledge on flash flood early warning system disseminated. | ||||
Project Rationale and Linkage to Country/Regional Strategy | Floods, together with storms, account for 76% of natural hazards that have occurred globally and caused 87% of economic loss due to such disasters from 2006 to 2015. Water crisis, climate change, and extreme weather events are identified as the top three global threats over the next 10 years. Historically, floods are the costliest natural hazard-induced disaster in the PRC. Annual economic loss due to floods in the PRC is estimated at about $20 billion, and the loss trend has been escalating by 7% since 1990. From 1980 to 2016, the PRC suffered from flood events that resulted in an annual average of 1,500 deaths and affected about 66 million people. Frequent flood disasters throughout history have setback the socioeconomic development of the PRC and now hinder the achievement of the sustainable development goals. An important lesson learned from recent flood events in 2016 and 2017, particularly along the Yangtze river basin, is that majority of flood damage does not come from the main stem river but from small-to-moderate sized river sub-basins and mostly associated with flash flood events. Rapid urbanization of small villages and towns in these sub-basins has triggered flash floods and landslides; these disaster events are not regarded as among the government's priorities in the past. Throughout the middle and lower Yangtze river basin, flood emergencies rose at more than 3,300 locations during the 2016 floods, resulting to over $40 billion in economic loss. Of those, over 3,200 flash flood events were reported to occur on small tributaries which are generally provided with lower standards of flood protection or where standards have not kept pace with the rapid rate of development. The excessive damage was attributed to the lack of spatial or temporal coverage of, and the gaps in end-to-end early warning system that involves six interactive elements: (i) risk knowledge; (ii) monitoring and data acquisition; (iii) forecasting and warning; (iv) dissemination and communication; (v) information type and reliability; and (vi) response capacity. In 2006, the State Council of the PRC launched the national flash flood disaster prevention plan with different targets including strengthening the monitoring and early warning system and enhancing the preparedness and emergency response capacity at national and local levels. The government has invested about CNY22.5 billion in national flash flood disaster prevention and mitigation projects during 2006 2015. As a result, the average annual flash flood disaster-related fatalities have remarkably been reduced from 1,100 to 400 persons during 1990 2015. The efforts to further reduce human casualties and economic loss due to flash floods in the PRC should consider a variety of factors including land use changes; flood exposures; climate change; uncertainty of temporal and spatial distribution of flash floods; and accuracy in early warning and localization of early warning system for emergency response with community empowerment. Forecasting and early warning is considered the most effective measure to save lives and reduce the damage from flash floods. While the PRC is pioneering flood preventive measures, the forecasting and early warning system in the PRC in general, is still at its primary stage of development. The challenges in establishing a reliable flash flood early warning system in the PRC are: (i) the national program is being implemented in a coarse spatial scale and has not yet been specialized for a large number of small river sub-basins, and scattered villages or towns in remote geographical settings; (ii) weather forecasts are becoming more detailed and accurate and yet to be employed to increase lead-time in flood early warning; (iii) a large number of small sub-basins are not being monitored by hydrological and meteorological stations, which made it difficult to develop a reliable localized flash flood early warning system; (iv) self-help and mutual-help conditions are yet to be promoted with awareness campaign and capacity building activities at grassroot communities to improve the effectiveness of the early warning system; and (v) institutional capacity in flood forecasting and early warning at local governments is not sufficient. Rapid socioeconomic development on the flash flood prone areas have called for a reliable flash flood forecasting and early warning system with strong engagement of the local communities. In December 2017, the Ministry of Water Resources issued the National Flash Flood Disaster Prevention Project Implementation Plan (2017 2020), which prioritizes flash flood monitoring and warning provisions nationwide, reflecting the lessons learned from the recent disasters. The government has requested ADB for a technical assistance in piloting a standalone flash flood early warning system suitable for small river sub-basins to be a benchmark for future investment under the national plan. The TA aims to pilot a standalone end-to-end flash flood early warning system, which is compatible to small sub-basins. The TA will demonstrate new approach, methodology, and technology to (i) increase warning accuracy and its effectiveness in evacuation and emergency response; (ii) extend the lead time of warning to provide more time to local residents to save valuables and their own lives; (iii) support the local governments and communities through the establishment of decision support system in emergency response; and (iv) improve information dissemination, and promote community-based early warning. The pilots will be implemented in Xinyu City in Jiangxi Province and Luanchuan County in Henan Province, both suffered serious flash floods in the past. More than 100 villages in the mountains of Luanchuan County in Henan Province heavily suffered flash floods in 2016. These villages are in the corridor of Yangtze River. During the past flash flood events in the pilot areas, centralized early warning information could not reach all the communities in a reliable manner; the early warning information given to the public was too coarse as there are no hydro-meteorological observation stations, it was difficult to make evacuation order; the time available to the communities for evacuation was too short, people either did not evacuate or have been mistakenly evacuated; and communities did not know when and how to evacuate, resulting in huge loss and damage. The TA will help upgrade and strengthen the application of flash flood early warning system in the PRC, mainly in many isolated or remote small villages, which have not benefitted from the centralized early warning system. |
||||
Impact | Flood risk management capacity in the Yangtze River Economic Belt improved |
Project Outcome | |
---|---|
Description of Outcome | Efficient and effective flash flood preparedness and emergency response in the YREB enhanced |
Progress Toward Outcome | |
Implementation Progress | |
Description of Project Outputs | Flash flood early warning in selected river sub-basins upgraded Capacity development for flash flood emergency response at local level enhanced Knowledge on flash flood early warning system disseminated |
Status of Implementation Progress (Outputs, Activities, and Issues) | The executing agency has completed the procurement and installation of (i) rainfall monitoring and alarming equipment and automatic water level station in Laoguan River Basin, (ii) forecasting and early warning software for Xixia County in Henan Province and Xinyu City in Jiangxi Province, and (iii) wireless early warning broadcast transmitter including wireless early warning terminals. The TA was extended to 31 December 2020 in order to complete the following activities: (i) remaining installation of flash flood disaster forecast and early warning system in Xixia County in Henan Province and Xinyu City in Jiangxi Province and the conduct of related community-based flash flood disaster awareness campaigns; (ii) preparation of the final report; (iii) conduct of national technical training and workshop in flash food early warning system; and (iv) conduct of the final workshop. |
Geographical Location | Nation-wide, Yangtze River |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | The TA will require 1.5 person-months of international (flash flood management specialist) and 17.5 person-months of national (flood disaster risk mitigation specialist/team leader, flood forecasting and early warning specialist, and community-based disaster mitigation specialists). |
Responsible ADB Officer | Osti, Rabindra P. |
Responsible ADB Department | East Asia Department |
Responsible ADB Division | Environment, Natural Resources & Agriculture Division, EARD |
Executing Agencies |
Ministry of Water Resources 2 Lane 2, Baijuang Road Beijing 100053 People's Republic of China |
Timetable | |
---|---|
Concept Clearance | 12 Apr 2018 |
Fact Finding | - |
MRM | - |
Approval | 20 Aug 2018 |
Last Review Mission | - |
Last PDS Update | 28 Sep 2020 |
TA 9566-PRC
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
20 Aug 2018 | 12 Sep 2018 | 12 Sep 2018 | 29 Feb 2020 | 31 Dec 2020 | 15 Mar 2021 |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
400,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 400,000.00 | 17 Jun 2022 | 286,158.60 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
Piloting Innovative Flash Flood Early Warning Systems in Selected River Basins: Technical Assistance Completion Report | TA Completion Reports | Nov 2021 |
Piloting Innovative Flash Flood Early Warning Systems in Selected River Basins: Technical Assistance Report | Technical Assistance Reports | Aug 2018 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Technology and Tradition Save Lives from Flash Flood Disasters in the People’s Republic of China
Forecasting and early warning are considered the most effective measures to save lives and reduce the damage from flash floods. In the PRC, an ADB project combines tradition with technology to prevent flash flood-induced disasters.ADB Develops Innovative Flash Flood Early Warning Systems in the People’s Republic of China
Floods are the costliest natural hazard-induced disaster in the People’s Republic of China. To respond to this, ADB in 2018 piloted innovative flash flood disaster early warning systems in two provinces of the PRC.
Tenders
Contracts Awarded
Procurement Plan
None currently available.