China, People's Republic of : Anhui Huangshan Xin'an River Ecological Protection and Green Development Project
Project Details
-
Project Officer
Fan, Mingyuan
Sectors Group
Request for information -
Country/Economy
China, People's Republic of -
Sector
- Agriculture, natural resources and rural development
Project Name | Anhui Huangshan Xin'an River Ecological Protection and Green Development Project | ||||||||
Project Number | 52026-001 | ||||||||
Country / Economy | China, People's Republic of |
||||||||
Project Status | Active | ||||||||
Project Type / Modality of Assistance | Loan |
||||||||
Source of Funding / Amount |
|
||||||||
Operational Priorities | OP1: Addressing remaining poverty and reducing inequalities OP2: Accelerating progress in gender equality OP3: Tackling climate change, building climate and disaster resilience, and enhancing environmental sustainability OP4: Making cities more livable OP5: Promoting rural development and food security OP6: Strengthening governance and institutional capacity OP7: Fostering regional cooperation and integration |
||||||||
Sector / Subsector |
Agriculture, natural resources and rural development / Agricultural policy, institutional and capacity development - Forestry - Rural sanitation Water and other urban infrastructure and services / Urban flood protection - Urban sewerage |
||||||||
Gender | Effective gender mainstreaming | ||||||||
Description | |||||||||
Project Rationale and Linkage to Country/Regional Strategy | |||||||||
Impact | Sustainable economic growth and environmental improvement in the Yangtze River Economic Belt achieved |
Project Outcome | |
---|---|
Description of Outcome | Economic and environmental conditions in the upstream of Xin'an River improved |
Progress Toward Outcome | The project is on track in achieving the target. |
Implementation Progress | |
Description of Project Outputs | Urban point source pollution management facilities upgraded Rural point and nonpoint source pollution control facilities and systems enhanced Green financing mechanisms piloted Capacity for ecological system and project management strengthened |
Status of Implementation Progress (Outputs, Activities, and Issues) | As of July 2023 the following have been achieved: Output 1 - (i) a total of 136.1 km sewage pipeline, (ii) 40.5 km stormwater pipeline installation, and (iii) 3.4 km river embankment construction have been completed; Output 2 - (i) a total of 90 distributed wastewater treatment systems have been constructed connecting about 12,800 households; (ii) 106.7 km of rural water supply pipelines have been installed, connecting to about 2,800 households; (iii) 548 ha (about 8,220 mu) of green agricultural demonstration parks have been constructed; (iv) 44,720 Ha of pine forest disease prevention in Xin'an River Basin have been completed, and (v) 318,694 pine trees have been protected by tree injection and 85,337 of dead pine trees cleared. Output 3 - (i) contract signing with three tea gardens subprojects in She County has been completed, and (ii) two equity investment agreements (on ecological agriculture and pollution control) with SMEs have been signed and approved by ADB. Output 4 - implementation of monitoring and management systems, technical support and project management are on track. |
Geographical Location | Huangshan |
Safeguard Categories | |
---|---|
Environment | B |
Involuntary Resettlement | B |
Indigenous Peoples | C |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | The project is classified by ADB as Category B for environment. The project environmental safeguard assessments and documents comprise: (i) an initial environmental examination (IEE) including an environmental management plan (EMP). The IEE and EMP cover all project components except one, a Green Investment Fund (under output 3), which will be implemented by HTIC; and (ii) an ESMS, for safeguard management for the Green Investment Fund. The IEE, EMP and ESMS have been prepared in compliance with ADB's Safeguard Policy Statement (2009). For all project matters relating to environmental safeguards, the IEE, EMP and ESMS form the basis of the official loan agreement between ADB and the executing agency. |
Involuntary Resettlement | The project is classified as category B for involuntary resettlement. In total, the project involves 72.31 mu of permanent land occupation (4.63 mu state-owned land and 67.68 mu collective owned land), affecting 200 households with 830 persons. A total of 60 m2 of non-residential house will be affected, involving 1 household with 4 persons. No household will have significant impacts from permanent land acquisition or relocation. A total of 316.43 mu land will be used temporarily, including 219.39 mu state-owned land and 97.04 mu collective land. |
Indigenous Peoples | The project does not involve impacts on ethnic minority villages or communities that would trigger ADB's Safeguard Policy Statement requirements on indigenous peoples. There are only a few ethnic minority individuals living dispersedly in five counties among the seven project counties/districts. The scattered ethnic minority individuals in the project area are not expected to have differential impacts; and they will enjoy the project benefits as residents in the project area. Therefore, the project is classified as category C on indigenous peoples according to ADB's Safeguard Policy Statement (2009); and no action plan needs to be prepared for ESMS. |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | The consulting firms and individual consultants will be engaged in accordance with ADB's Procurement Policy (2017, as amended from time to time) and the associated project administration instructions and/or staff instructions. |
Responsible ADB Officer | Fan, Mingyuan |
Responsible ADB Department | Sectors Group |
Responsible ADB Division | Agriculture, Food, Nature, and Rural Development Sector Office (SG-AFNR) |
Executing Agencies |
Anhui Provincial Finance Department Huangshan Municipal Government |
Timetable | |
---|---|
Concept Clearance | 16 Oct 2018 |
Fact Finding | 31 Jul 2019 to 08 Aug 2019 |
MRM | 14 Oct 2019 |
Approval | 11 Dec 2019 |
Last Review Mission | - |
Last PDS Update | 18 Sep 2023 |
Loan 3888-PRC
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
11 Dec 2019 | 17 Jun 2020 | 25 Sep 2020 | 30 Dec 2026 | - | - |
Financing Plan | Loan Utilization | ||||
---|---|---|---|---|---|
Total (Amount in US$ million) | Date | ADB | Others | Net Percentage | |
Project Cost | 155.50 | Cumulative Contract Awards | |||
ADB | 100.00 | 18 Sep 2023 | 49.21 | 0.00 | 58% |
Counterpart | 55.50 | Cumulative Disbursements | |||
Cofinancing | 0.00 | 18 Sep 2023 | 16.66 | 0.00 | 20% |
Status of Covenants | ||||||
---|---|---|---|---|---|---|
Category | Sector | Safeguards | Social | Financial | Economic | Others |
Rating | - | - | - | - | - | Unsatisfactory |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
Title | Document Type | Document Date |
---|---|---|
基于生态系统的综合生态保护与绿色发展模式案例:中国黄山项目 | Papers and Briefs | Sep 2021 |
A Holistic Ecosystem-Based Approach to Ecological Protection and Green Development: The Case of Huangshan in the People’s Republic of China | Papers and Briefs | Sep 2021 |
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Cleaning Up Xin’an River to Unleash a New Era of Growth in the People's Republic of China
Pollution threatens the Xin’an River, a river system within the People’s Republic of China's Yangtze River Economic Belt that provides water supply to millions of households.Supporting the Yangtze River Economic Belt Development
Two investment projects that can revitalize the Yangtze River Economic Belt emerged from a technical assistance facility funded by ADB and the Multidonor Trust Fund under the Water Financing Partnership Facility.ADB Approves Green Financing, River Restoration Demonstration Project in Anhui, PRC
ADB has approved a $100 million loan for a demonstration project that will help clean up the Xin’an River in Anhui Province in the PRC. The project will also pilot an innovative financing mechanism to reduce rural pollution...
Tenders
Tender Title | Type | Status | Posting Date | Deadline |
---|---|---|---|---|
Pilot Scheme for Realizing the Value of Ecologcal Products in Huangshan Municipality | Firm - Consulting | Closed | ||
Pine Forest Disease Prevention Project- Monitoring and Prevention System 2 (Satellite Remote Sensing, Drone Aerial Monitoring ) | Firm - Consulting | Closed | ||
Green Incentive Fund Feasibility Study | Firm - Consulting | Closed | ||
External Social and Resettlement Monitoring | Firm - Consulting | Closed | ||
Study on the Establishment of Performance Evaluation System and Compensation Standard for Ecological Compensation in Xin’an River | Firm - Consulting | Closed | ||
Construction Supervision Service - Xiuning County | Firm - Consulting | Closed | ||
Construction Supervision Service for Shexian County Project | Firm - Consulting | Closed | ||
Individual Consulting Services of the Project Start-Up Phase | Individual - Consulting | Closed | ||
Project Management Supporting Consulting Service | Firm - Consulting | Closed |
Contracts Awarded
Contract Title | Approval Number | Contract Date | Contractor | Address | Executing Agency | Total Contract Amount (US$) | Contract Amount Financed by ADB (US$) |
---|---|---|---|---|---|---|
Xitou and Yancun Water Supply Network Construction | Loan 3888 | 12 Aug 2022 | Tianjin Pipeline Engineering Group Co., Ltd. | No. 91, Chifeng Road, Heping District, Tianjin | Huangshan Municipal Government | 2,265,808.44 | 1,341,531.76 |
Works-SX-7: Environmental Infrastructure Improvement along Xin'an River in She County | Loan 3888 | 06 Jul 2022 | Shanhu Horticulture Construction Co., Ltd. | No. 28, Wuhua Road, Changji Industrial Zone, Xinjian District, Nanchang City, Jiangxi Province, PRC | Huangshan Municipal Government | 2,656,405.09 | 1,599,518.22 |
Works-SX-2: Sewage and Stormwater Sewer Upgrade Project in She County-2 | Loan 3888 | 06 Jul 2022 | Tianjin Pipeline Engineering Group Co., Ltd. | No. 91, Chifeng Road, Heping District, Tianjin, PRC | Huangshan Municipal Government | 3,132,180.84 | 1,886,000.12 |
Works-XN-4: Village Environment Improvement Project in Xiuning County-Shangshan 2 | Loan 3888 | 25 May 2022 | Bainian Construction Group Co., Ltd. | 1/F Management and Service Building, Intelligent Manufacturing Industrial Park, East of Xiuxian Road and north of Yingxiong Avenue, Nanchang Economic and Technological Development Zone, Nanchang City, Jiangxi Province, PRC | Huangshan Municipal Government | 2,229,629.08 | 1,357,564.76 |
Works-XN-5: Village Environment Improvement Project in Xiuning County-Shangshan 3 | Loan 3888 | 25 May 2022 | Tianjin Pipeline Engineering Group Co., Ltd. | 91 Chifeng Road, Heping District, Tianjin, PRC | Huangshan Municipal Government | 2,508,739.09 | 1,527,507.79 |
Serv-HSC-14: Green Incentive Fund Feasibility Study | Loan 3888 | 26 Apr 2022 | China Agricultural University | Room 404, Floor 4, City Hall, Tunxi District, Huangshan City, Anhui Province | Huangshan Municipal Government | 388,391.96 | 189,558.90 |
Xinhua Village Green Agriculture Demonstration Project in Huangshan District | Loan 3888 | 18 Apr 2022 | Zhongdi Yingang Construction Group Co., Ltd. | Floor 20 and 21, Block C, Times Square, Yellow River Street, Rare-earth High-tech Zone, Baotou, Inner Mongolia Province, PRC | Huangshan Municipal Government | 2,158,334.73 | 1,040,220.34 |
Serv-HSC-27: Pine Forest Disease Prevention Project - Disease control system (Prevention and control of key forest areas, trunk injection, training of full-time and part-time reporters) in Huangshan District | Loan 3888 | 26 Apr 2022 | Fuzhou lvdun Pest Control Co., Ltd. | Room 2301, building 2, linhuyuan, Minjiang Century City, Cangshan District, Fuzhou | Huangshan Municipal Government | 2,347,032.11 | 1,145,494.44 |
Contract No. Serv-HSC-14: Green Incentive Fund Feasibility Study | Loan 3888 | 01 Mar 2022 | China Agricultural University | PRC | Huangshan Municipal Government | 395,847.82 | 197,347.07 |
Goods-HSC-5: Smart River Monitoring System of Huangshan | Loan 3888 | 28 Dec 2021 | Changjiang Survey, Planning, Design and Research Co., Ltd. and Changjiang Xinda Software Technology (Wuhan) Co., Ltd. | No.1863 Jiefang Avenue, Jiang'an District, Wuhan City; and Building 24-1, No.1863 Jiefang Avenue, Jiang'an District, Wuhan City | Huangshan Municipal Government | 2,023,579.65 | 1,011,265.93 |
Works-XN-6: Village Environment Improvement Project in Xiuning County-Xikou | Loan 3888 | 13 Dec 2021 | Zhejiang Jiuhe Environment Co., Ltd. and Anhui Changcheng Construction Engineering Co., Ltd. | Room 901-903, Building 3, Fortune Center, 51 Xujiang Road, Kecheng District, Quzhou City, Zhenjiang Province | Huangshan Municipal Government | 1,682,474.12 | 1,014,955.92 |
Works-XN-7: Village Environment Improvement Project in Xiuning County-Wucheng | Loan 3888 | 16 Dec 2021 | Tongling Municipal Construction Co., Ltd. | Huafu Building, Huaihe Road, Tongling City, Anhui Province | Huangshan Municipal Government | 1,758,056.72 | 1,060,551.28 |
Works-SX-8: Xin'an River Green Agriculture Demonstration Project in She County | Loan 3888 | 28 Dec 2021 | Jinguangdao Environmental Construction Group Co., Ltd. and Zhejiang Jiuhe Environmental Co., Ltd. | 8/F, Building 1,123 Jinggang Mountains Avenue, Jizhou District, Jiangxi Province; and Room 901-903, building 3, Fortune Center, 51 Xujiang Road, Kecheng District, Zhejiang Province | Huangshan Municipal Government | 1,787,155.21 | 1,082,455.28 |
Works-QM-2: Sewage and Stormwater Sewer Upgrade Project in Qimen County-2 | Loan 3888 | 28 Dec 2021 | Mountain Lake Construction Group Co., Ltd. | 28 Wuhua Road, Changling Industrial Zone, New District, Nanchang City, Jiangxi Province | Huangshan Municipal Government | 3,225,237.76 | 1,611,783.88 |
Serv-HSC-1: Study on Xinan River Eco-Compensation Evaluation System | Loan 3888 | 21 Oct 2021 | CECEP & CIECC Huarui Technology Co., Ltd. | Room 901, Block A, Fenglan International Center, No. 32, Xizhimen North Street, Haidian District, Beijing | Huangshan Municipal Government | 511,028.17 | 256,483.39 |
Works-QM-1: Sewage and Stormwater Sewer Upgrade Project in Qimen County-1 | Loan 3888 | 23 Sep 2021 | Anhui Xinjian Holding Group Co. Ltd. | 75 Chaohu Road Hefei City Anhui Province PRC | Huangshan Municipal Government | 2,297,318.43 | 1,154,085.08 |
Works-SX-6: Xitou Village Environment Improvement Project in She County-1 | Loan 3888 | 15 Sep 2021 | Tianjin Pipeline Engineering Group Co. Ltd. | 91 Chifeng Road Heping District Tianjin PRC | Huangshan Municipal Government | 4,026,743.33 | 2,447,676.05 |
WORKS-XN-2: SEWAGE AND STORMWATER SEWER UPGRADE PROJECT IN XIUNING COUNTY-2 | Loan 3888 | 13 Jul 2021 | TIANGONG FANGYUAN CONSTRUCTION GROUP CO. LTD. | 101 SUIDU BLDG 1 1039 XIANLAI WEST AVE YUSHUI DIST XINYU CITY JIANGXI PROV CHINA PEOPLE'SREP.OF | Huangshan Municipal Government | 4,442,525.74 | 4,442,525.74 |
WORKS-HS-1: XINHUA VILLAGE ENVIRONMENT IMPROVEMENT PROJECT IN HUANGSHAN DISTRICT | Loan 3888 | 09 Jun 2021 | FUJIAN YUCHENG CONSTRUCTION ENGINEERING CO. | 6 ZIYUN WEST ROAD, BANGSHAN TOWN, LONGHAI CITY, FUJIAN PROVINCE CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 2,131,077.14 | 1,051,740.78 |
WORKS-TX-2: VILLAGE ENVIRONMENT IMPROVEMENT PROJECT IN TUNXI DISTRICT-2 | Loan 3888 | 08 Jun 2021 | KUNPENG CONSTRUCTION GROUP CO., LTD. | 3RD FLOOR, 47 SHANQIAN ST., WENZHOU CITY ZHEJIANG PROVINCE CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 1,762,200.12 | 1,055,465.94 |
WORKS-SX-5: XITOU VILLAGE ENVIRONMENT IMPROVEMENT PROJECT IN SHE COUNTY-2 | Loan 3888 | 29 Jun 2021 | XINGRUN CONSTRUCTION GROUP CO., LTD. | 216 XIANGSHAN STREET, FEICHENG CITY, TAI'AN CITY, SHANDONG PROVINCE CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 2,208,276.95 | 1,336,708.09 |
WORKS-TX-3: ECOLOGICAL VILLAGE CONSTRUCTION PROJECT IN TUNXI DISTRICT-3 | Loan 3888 | 08 Jun 2021 | KUNPENG CONSTRUCTION GROUP CO., LTD. | 3RD FLOOR, 47 SHANQIAN ST., WENZHOU CITY ZHEJIANG PROVINCE CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 2,652,134.26 | 1,588,490.07 |
SERV-HSC-10: CONSTRUCTION SUPERVISION SERVICE - XIUNING COUNTY | Loan 3888 | 20 May 2021 | HEBEI SANYUAN ENGINEERING SUPERVISION CO., | NO. 9 ZHAIYING SOUTH ST. CHANG'AN DIST. SHIJIAZUANG CITY, HEBEI, 050031 CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 609,352.14 | 308,051.65 |
WORKS-HS-4: SEWAGE AND STORMWATER SEWER UPGRADE PROJECT IN HUANGSHAN DISTRICT | Loan 3888 | 20 May 2021 | ZHEJIANG JIUHE ENVIRONMENT CO., LTD. | 901-903 BLDG 3, FORTUNE CENTER, NO. 51 XUJIANG RD, KECHENG DIST, QUZHOU CITY CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 2,442,162.44 | 1,232,141.43 |
WORKS-SX-1: SEWAGE AND STORMWATER SEWER UPGRADE PROJECT IN SHE COUNTY-1 | Loan 3888 | 20 May 2021 | CHINA PETROLEUM PIPELINE ENGINEERING CO., | 87 GUANGYANG ROAD, LANGFANG CITY HEBEI PROVINCE CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 2,576,632.92 | 1,575,582.62 |
WORKS-XN-1: SEWAGE AND STORMWATER SEWER UPGRADE PROJECT IN XIUNING COUNTY-1 | Loan 3888 | 24 May 2021 | ANHUI XINDA CONSTRUCTION AND INSTALLATION | QIANQIAO TOWN, SHUCHENG COUNTY LU'AN CITY, ANHUI PROVINCE CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 5,279,469.78 | 3,226,231.84 |
WORKS-HZ-1: SEWAGE AND STORMWATER SEWER UPGRADE PROJECT IN HUIZHOU DISTRICT-1 | Loan 3888 | 25 May 2021 | SHANHU CONSTRUCTION GROUP CO., LTD. | 28 WUHUA ROAD, CHANGLING INDUSTRIAL ZONE NEW DISTRICT, NANCHANG CITY, JIANGXI CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 5,402,183.30 | 3,301,169.56 |
WORKS-YX-1: SEWAGE AND STORMWATER SEWER UPGRADE PROJECT IN YI COUNTY, AND ZHANG RIVER REHABILITATION PROJECT IN YI COUNTY | Loan 3888 | 20 May 2021 | ANHUI XINJIAN HOLDING GROUP CO., LTD. | 75 CHAOHU ROAD, HEFEI CITY ANHUI PROVINCE CHINA, PEOPLE'S REP. OF | Huangshan Municipal Government | 5,805,969.47 | 3,550,286.32 |
CONTRACT NO. HSC-12 CONSTRUCTION SUPERVISION SERVI CE - SHE COUNTY | Loan 3888 | 31 Mar 2021 | ZHEJIANG YIHUA ENGINEERING CONSTRUCTION | YIPENG STREET, EAST INDUSTRIAL CLUSTER DISTRICT, HANGZHOU, ZHEJIANG PROVINCE CHINA,PEOPLE'SREP.OF | Huangshan Municipal Government | 429,897.57 | 215,001.38 |
CONTRACT NO. SERV-HSC-5 PROJECT MANAGEMENT | Loan 3888 | 13 Nov 2020 | ESD CHINA LIMITED | PRC CHINA,PEOPLE'SREP.OF | Huangshan Municipal Government | 1,193,966.08 | 600,916.12 |
Procurement Plan
Title | Document Type | Document Date |
---|---|---|
Anhui Huangshan Xin'an River Ecological Protection and Green Development Project: Procurement Plan | Procurement Plans | Jul 2023 |