fbpx 52174-001: Emergency Assistance Project | Asian Development Bank

Bangladesh: Emergency Assistance Project

Sovereign (Public) Project | 52174-001 Status: Active

The project will support the Government of Bangladesh in addressing the immediate and urgent needs of the displaced persons from Myanmar in Coxsbazar District, as identified by the United Nations (UN) in its Joint Response Plan (JRP) (displaced persons). The project will mainly support the improvement of water supply and sanitation, disaster risk management, sustainable energy supply, and access roads.

Project Details

Project Officer
Chowdhury, Marjana South Asia Department Request for information
Country
  • Bangladesh
Sector
  • Water and other urban infrastructure and services
 
Project Name Emergency Assistance Project
Project Number 52174-001
Country Bangladesh
Project Status Active
Project Type / Modality of Assistance Grant
Technical Assistance
Source of Funding / Amount
Grant 0582-BAN: Emergency Assistance Project
concessional ordinary capital resources lending / Asian Development Fund US$ 100.00 million
TA 9546-BAN: Implementing the Emergency Assistance Project
Technical Assistance Special Fund US$ 3.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Sector / Subsector

Energy / Electricity transmission and distribution

Transport / Road transport (non-urban)

Water and other urban infrastructure and services / Urban flood protection - Urban policy, institutional and capacity development - Urban sanitation - Urban solid waste management - Urban water supply

Gender Equity and Mainstreaming Effective gender mainstreaming
Description The project will support the Government of Bangladesh in addressing the immediate and urgent needs of the displaced persons from Myanmar in Coxsbazar District, as identified by the United Nations (UN) in its Joint Response Plan (JRP) (displaced persons). The project will mainly support the improvement of water supply and sanitation, disaster risk management, sustainable energy supply, and access roads.
Project Rationale and Linkage to Country/Regional Strategy On 7 May 2018, the Government of Bangladesh requested the Asian Development Bank (ADB) for grant support to provide high-priority basic infrastructure and essential services to help address the humanitarian crisis caused by the arrival of the displaced persons. The project meets the requirements for emergency assistance financing
Impact Social recovery of displaced persons in Teknaf and Ukhia camps accelerated
Project Outcome
Description of Outcome Living conditions and resilience of displaced persons improved
Progress Toward Outcome All sub-projects for improving living conditions and resilience of displaced persons have been identified with location. All bidding will be completed by October 2020 and implementation of packages of respective output indicators are in various stages of progress.
Implementation Progress
Description of Project Outputs

Water supply and sanitation improved.

Disaster risk management strengthened

Energy sources provided

Access Roads Improved

Status of Implementation Progress (Outputs, Activities, and Issues)

7 mobile water carriers for the distribution of potable water to the camps provided.

500 community bathing facilities for women constructed and maintained. The mid term review fielded in June 2019 has agreed to change the target value to 500 nos. (MTR aide memoire and BTOR attached). Contract awarded for 40 mini piped water supply systems through 5 packages. 25 of the 40 are commissioned and rest are on track.

4 Integrated waste management facilities are contracted out and implementation ongoing. The rest 1 facility is in contract signing stage.

Number of surface water treatment plant increased to 4 nos. 2 SWTPs are contracted out and 2 SWTPs are in bidding stage.

All 10 multipurpose school cum cyclone shelters are under construction through 3 packages. The overall progress is 64%.

The number of food distribution centres (FDCs) reduced to 7 after the mid term review and was decided in the Aide Memoir (although target population remained same). Again the contract has been revised with reduction of FDCs from 7 to 4 and all 4 centers are handed over. Another package comprising 3 FDCs was decided to proceed but later dropped, as requested by EA since WFP could not provide the and.

The hill slope protection work has been reduced to 1.2 km considering the actual condition of the sites. Contract signed on 18 June 2020 and 2% progress has been achieved to date.

The provision for storm water drainage network reduced from 13.6 Km to 11 Km. 2 packages comprising 11 km are contracted out and overall progress is 45%.

The number of lightning arrester increased to 400. Out of which 200 lightning arrestors already installed. Another package comprising 200 nos. lightning arresters contracted out on 3 March 2020 and progress is 75%.

The component for gender-sensitive disaster risk management plans has been dropped.

The progress of 33/11 kV, 10 MVA substation is 100% and the transmission system is running.

Contract for 50 km, d11 kV new distribution line signed on 10 December 2018. All 1130 poles have been installed. 43 km line completed. Overall physical progress is 93%.

2000 nos. standalone solar street lights already installed. For mini-grid connected solar lights, another 2000 nos. street lights have been also installed.

The number of solar PV nano-grid has been increased to 100. The progress of one package comprising 50 nos. nano-grid is 78%. And the progress of another package (with 2 Lots) comprising 50 nos. nano-grid is about 13%. The number of fully completed nano-grid is 30.

The component of 70,000 retained heat cookers was dropped during the mid term review.

The average progress of 2 packages (15 km) of internal roads is 15% and rest 2 packages (15 km) are contracted out recently.

The provision for rural roads increased to 42.5 km. Contract awarded for 30 km under 4 packages. Overall progress is 25%. The remaining 12.5 km under 1 package is in bidding stage.

The rehabilitation of national highway from Cox's Bazar to Teknaf (50 km) awarded in 2 packages on 27 December 2018 and overall civil works progress is 75%.

The employment of 10%-20% of women will be ensured throughout the project period.

Geographical Location Cox's Bazar, Coxs Bazar
Safeguard Categories
Environment B
Involuntary Resettlement B
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects Awarded contracts included EMP(s) cleared by ADB. Contracts under bidding stage also included EMP(s) cleared by ADB. Where required, national clearances are obtained for components that are awarded. Time bound action plans are in place.
Involuntary Resettlement Only RHD component required RP. RP is disclosed. GRC establishment is under process. No CRP eligible complains.
Indigenous Peoples No impacts on Indigenous Peoples.
Stakeholder Communication, Participation, and Consultation
During Project Design All level of stakeholders relevant to Displaced Myanmar Nationals in Ukhiya, Teknaf and Cox's Bazar had been extensively consulted to design the project scope output and outcomes. The list includes All government Agencies (MoDMR, MLGC, ERD, MoFA, DC office, RRRC, LGED, DPHE, BREB, RHD, Dept. of Police, etc.), all development Partners (UNHCR, WFP, IOM, ISCG, etc.)
During Project Implementation Consultation by Gender and Social Inclusion Team: 3 FGDs have been conducted at camp-3, camp-4 and camp-13 for validation of project activities. Due to social obligations of Rohingya society, FGDs were conducted with all women participants. Consists of 5-8 women in each FGD, participants have given their consent for construction of bathing facilities (please see attached photos for reference). 3 FGDs have been conducted to evaluate feasibility of recruiting women workers in construction activities. A significant number of women participants have shown strong enthusiasm to work in the construction activities and earth work.
Business Opportunities
Consulting Services

QCBS and CQS, OCB, international and or national advertisement or LCB - to be decided

Single source selection - to be decided

Individual consultant international advertisement/national advertisement - to be decided

Procurement

Open competitive bidding (OCB) (national advertisement) - to be decided

Direct contracting - to be decided

Limited competitive bidding (LCB) - to be decided

Request for Quotation - to be decided

Responsible ADB Officer Chowdhury, Marjana
Responsible ADB Department South Asia Department
Responsible ADB Division Bangladesh Resident Mission
Executing Agencies
Bangladesh Rural Electrification Board
Directorate of Procurement
Head Office Bldg.-7th Flr, Zoar Sahara,
Khilkhet, Dhaka-1229, Bangladesh
Department of Public Health Engineering
DPHE Bhaban, 14 Shaheed Captain Mansur
Ali Sarani, Kakrail
Dhaka, Bangladesh
Local Government Engineering Department
[email protected]
LGED Bhaban (Level 6), Agargaon
Sher-e-Bangla Nagar,
Dhaka 1207, Bangladesh
Ministry of Energy and Mineral Resources
Bhaban 6, Room 113
Bangladesh Secretariat
Dhaka, Bangladesh
Ministry of Local Government, Rural Development, and Co-operatives
Rural Development and Cooperatives
Room 632, Bldg 7
Block-B, Dhaka-1207, Bangladesh
Ministry of Road Transport and Bridges
The Roads and Highways Department
Dhaka, Bangladesh
Roads and Highways Department
Sarak Bhaban
Tejgaon, Dhaka-1208
Bangladesh
Timetable
Concept Clearance -
Fact Finding 03 Jun 2018 to 07 Jun 2018
MRM 19 Jun 2018
Approval 06 Jul 2018
Last Review Mission -
Last PDS Update 30 Sep 2020

Grant 0582-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
06 Jul 2018 09 Aug 2018 01 Oct 2018 30 Jun 2021 - -
Financing Plan Grant Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 120.00 Cumulative Contract Awards
ADB 100.00 06 Jul 2018 92.47 0.00 92%
Counterpart 20.00 Cumulative Disbursements
Cofinancing 0.00 06 Jul 2018 44.78 0.00 45%

TA 9546-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
06 Jul 2018 30 Jul 2018 30 Jul 2018 30 Jun 2021 - -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
3,000,000.00 0.00 0.00 0.00 0.00 0.00 3,000,000.00 06 Jul 2018 841,259.53

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Emergency Assistance Project: Social Monitoring Report (January-June 2020) Social Monitoring Reports Jun 2020
Emergency Assistance Project: Environmental Monitoring Report (January-June 2020) Environmental Monitoring Reports Jun 2020
Emergency Assistance Project: Construction of Internal Roads and Stairs with Drainage Facilities at Ukhiya (Package No. W1B) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Improvement of Roads in Ukhiya Upazila (EAP/LGED/W4D Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Construction of Roads in Ukhiya Upazila (EAP/LGED/OCB-N/W2A Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Construction of Roads in Teknaf Upazila (EAP/LGED/OCB-N/W2B Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Improvement of Roads in Ukhiya Upazila (EAP/LGED/OCB-N/W4C Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Construction of Roads in Ukhiya Upazila (EAP/LGED/OCB-N/W1B Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Mini Piped Water Supply Package 3 Subproject Initial Environmental Examination Initial Environmental Examination Feb 2020
Emergency Assistance Project: Kutupalong- Balukhali Group 3 Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Shamlapur, Teknaf Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Mini Piped Water Supply Package 1 Subproject Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Social Monitoring Report (July-December 2019) Social Monitoring Reports Dec 2019
Emergency Assistance Project: Mini Piped Water Supply Package 2 Subproject Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Semiannual Environmental Monitoring Report (July-December 2019) Environmental Monitoring Reports Dec 2019
Emergency Assistance Project: Teknaf and Ukhia Sub-districts Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Mini Piped Water Supply Package 4 Subproject Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Ecological Assessment Report Environmental Monitoring Reports Oct 2019
Emergency Assistance Project: Construction and Re-construction of Storm water Drainage Network on Primary Canal-02 (Package No. W21) Initial Environmental Examination Initial Environmental Examination Aug 2019
Emergency Assistance Project: Construction of Storm water Drainage Network on Primary Canal-01 (Package No. W20) Initial Environmental Examination Initial Environmental Examination Aug 2019
Emergency Assistance Project: Construction of Hill Slope Protection (Package No. W10) Initial Environmental Examination Initial Environmental Examination Jul 2019
Emergency Assistance Project: Ukhiya Cyclone Shelter Initial Environmental Examination Initial Environmental Examination Jun 2019
Emergency Assistance Project: Social Monitoring Report (January-June 2019) Social Monitoring Reports Jun 2019
Emergency Assistance Project: Development of Faliapara Primary School Road and Ukhiya Marine Drive Road Initial Environmental Examination Initial Environmental Examination Jun 2019
Emergency Assistance Project: Environmental Monitoring Report (January-June 2019) Environmental Monitoring Reports Jun 2019
Emergency Assistance Project: Upgradation of 8.8 km Link Road Connecting Cox's Bazar Initial Environmental Examination Initial Environmental Examination Jun 2019
Emergency Assistance Project: National Highway (N1) Improvement Initial Environmental Examination Initial Environmental Examination Feb 2019
Emergency Assistance Project: Teknaf School-cum-Cyclone Shelter (Package EAP/BREB/W9) Initial Environmental Examination Initial Environmental Examination Jan 2019
Emergency Assistance Project: Ukhiya School-cum-Cyclone Shelter (Package EAP/BREB/W6) Initial Environmental Examination Initial Environmental Examination Dec 2018
Emergency Assistance Project: Social Monitoring Report (July-December 2018) Social Monitoring Reports Dec 2018
Emergency Assistance Project: Environmental Monitoring Report (July-December 2018) Environmental Monitoring Reports Dec 2018
Emergency Assistance Project: Ukhiya School-cum-Cyclone Shelter (Package EAP/BREB/W8) Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: 33/11kV Substation in Ukhiya Upazila (EAP/BREB/W1A Package) Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: 33/11KV Substation (10/14MVA, Turn Key) at Palongkhali, Ukhiya Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: Palongkhali Substations (Package EAP/BREB/W2) Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: National Highway (N1) Improvement Resettlement Plan Resettlement Plans Aug 2018
Emergency Assistance Project: Resettlement Framework Resettlement Frameworks Jun 2018
Emergency Assistance Project: Environmental Assessment and Review Framework Environmental Assessment and Review Framework Jun 2018

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
G0582-BAN: Emergency Assistance Project [EAP/DPHE/W19] - CORRIGENDUM 2 Invitation for Bids Closed 06 Feb 2020 01 Mar 2020
G0582-BAN: Emergency Assistance Project [EAP/DPHE/W19] - ORIGINAL Invitation for Bids Closed 06 Jan 2020 20 Feb 2020
Structural Engineer for Design of surface water reservoir Individual - Consulting Closed 10 Jun 2019 12 Jun 2019
Hydrologist for Design of Surface Water Reservoir Individual - Consulting Closed 29 May 2019 04 Jun 2019
Geotechnical Engineer for Design of surface water reservoir Individual - Consulting Closed 29 May 2019 04 Jun 2019
Junior Field Supervision Engineer Individual - Consulting Closed 08 May 2019 11 May 2019
Junior Field Supervision Engineer Individual - Consulting Closed 08 May 2019 11 May 2019
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W1A] Invitation for Bids Closed 29 Apr 2019 08 May 2019
Junior Field Supervision Engineer Individual - Consulting Closed 26 Mar 2019 01 Apr 2019
Junior Field Supervision Engineer Individual - Consulting Closed 26 Mar 2019 01 Apr 2019
Ecological Specialist Individual - Consulting Closed 18 Mar 2019 24 Mar 2019
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W3 (Rebid 01)] Invitation for Bids Closed 13 Mar 2019 20 Mar 2019
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G5] Invitation for Bids Closed 12 Mar 2019 08 Apr 2019
Project Implementation Engineer Individual - Consulting Closed 06 Mar 2019 17 Mar 2019
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G2B] Invitation for Bids Closed 04 Feb 2019 04 Mar 2019
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W4] Invitation for Bids Closed 14 Jan 2019 28 Jan 2019
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W3] Invitation for Bids Closed 14 Jan 2019 21 Jan 2019
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W3] Invitation for Bids Closed 16 Nov 2018 03 Dec 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W19] Invitation for Bids Closed 08 Nov 2018 26 Nov 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W9] Invitation for Bids Closed 08 Nov 2018 26 Nov 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W1] Invitation for Bids Closed 27 Sep 2018 22 Oct 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G1] Invitation for Bids Closed 26 Sep 2018 15 Oct 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/W2] Invitation for Bids Closed 26 Sep 2018 15 Oct 2018
Design, Monitoring and Supervision Consulting Services of DPHE Component, Cox’s Bazar Firm - Consulting Closed 24 Sep 2018 08 Oct 2018
Procurement Specialist Individual - Consulting Closed 21 Sep 2018 27 Sep 2018
Financial Management Specialist Individual - Consulting Closed 15 Sep 2018 21 Sep 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W13] Invitation for Bids Closed 11 Sep 2018 27 Sep 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/G1] Invitation for Bids Closed 11 Sep 2018 27 Sep 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G2A] CORRIGENDUM Invitation for Bids Closed 03 Sep 2018 27 Sep 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G2A] Invitation for Bids Closed 31 Aug 2018 27 Sep 2018
Grant No. 0582-BAN: Emergency Assistance Project [WP-01] Invitation for Bids Closed 31 Aug 2018 27 Sep 2018
Grant No. 0582-BAN: Emergency Assistance Project [WP-02] Invitation for Bids Closed 31 Aug 2018 27 Sep 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W8] Invitation for Bids Closed 31 Aug 2018 08 Oct 2018
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/W1A] Invitation for Bids Closed 31 Aug 2018 27 Sep 2018
Project Coordinator (POC) Individual - Consulting Closed 21 Aug 2018 27 Aug 2018
Design, Monitoring and Supervision Consulting Services Firm - Consulting Closed 14 Aug 2018 29 Aug 2018
Environmental Specialist-1 Individual - Consulting Closed 10 Aug 2018 16 Aug 2018
Environmental Specialist-2 Individual - Consulting Closed 10 Aug 2018 16 Aug 2018
Project Management Specialist/Team Leader Individual - Consulting Closed 10 Aug 2018 16 Aug 2018
Social Development Gender Expert Individual - Consulting Closed 10 Aug 2018 16 Aug 2018
Social Development Specialist(GAD) Individual - Consulting Closed 10 Aug 2018 19 Aug 2018
Construction Supervision Consultancy (CSC) Services for Rehabilitation of National Highway from Link Road (Cox's Bazar) to Unchiprang (50 km) Firm - Consulting Closed 09 Aug 2018 29 Aug 2018
Solid Waste Management (SWM) Expert Individual - Consulting Closed 08 Aug 2018 14 Aug 2018
Project Selection and Preparation Engineer Individual - Consulting Closed 08 Aug 2018 14 Aug 2018
Water Supply Engineer Individual - Consulting Closed 08 Aug 2018 14 Aug 2018
Social Safeguards Specialist Individual - Consulting Closed 03 Aug 2018 09 Aug 2018
Procurement Specialist Individual - Consulting Closed 02 Aug 2018 08 Aug 2018
Renewable Energy Expert Individual - Consulting Closed 02 Aug 2018 08 Aug 2018
Structural Engineer (Hillside slope protection/Food Distribution Center) Individual - Consulting Closed 02 Aug 2018 13 Aug 2018
Design/Structural Engineer for Storm Water Drainage Individual - Consulting Closed 02 Aug 2018 08 Aug 2018
Power System Engineer Individual - Consulting Closed 02 Aug 2018 08 Aug 2018

Contracts Awarded

Contract Title Approval Number Contract Date Contractor Contractor Address Executing Agency Contract Description Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
CONSTRUCTION OF SURFACE WATER RESERVOIR BASED PIPE D WATER SYSTEM AT NAYAPARA TEKNAF Grant 0582 17 Aug 2020 ABM WATER COMPANY - M/S. MD. JAMIL IQBAL (ABM HOUSE-B/113 MOSQUE ROAD NEW DOHS MOHA KHALI DHAKA-1206. BANGLADESH Local Government Engineering Department 2,308,878.87
CONSTRUCTION OF SURFACE WATER TREATMENT PLANT (SWT P) FOR SUPPORTING WATER SUPPLY AT COX?S BAZAR CIT Grant 0582 30 Jun 2020 NC-SEBL (JV) GULSHAN 1 DHAKA 1212. BANGLADESH Local Government Engineering Department 2,495,485.60
CONSTRUCTION OF SURFACE WATER TREATMENT PLANT (SWT P) FOR SUPPORTING WATER SUPPLY AT COX'S BAZAR CIT Grant 0582 29 Jun 2020 AWCL-GDL (JV) HOUSE - B/113 MOSQUE ROAD NEW DOHS MO HAKHALI DHAKA - 1206. BANGLADESH Local Government Engineering Department 2,164,007.58
CONSTRUCTION OF SURFACE WATER TREATMENT PLANT (SWT P) FOR SUPPORTING WATER SUPPLY AT COX?S BAZAR CIT Grant 0582 29 Jun 2020 MONIR ENGINEERING AND CONSTRUCTION LTD. 269 MIAPARA GOPALGANJ - 8100. BANGLADESH Local Government Engineering Department 2,435,675.11
CONSTRUCTION OF SURFACE WATER RESERVOIR BASED PIPE D WATER SYSTEM AT NAYAPARA TEKNAF Grant 0582 18 Jun 2020 MOSHIUR RAHMAN CHOWDHURY - M/S PARADISE TRADE HOTEL SUKARNA INT. (RES.) SAMOBOY SUPER MARKET 1ST FLOOR MALOPARA RAJSHAHI BANGLADESH Local Government Engineering Department 1,756,263.35
CONSTRUCTION OF INTERNAL ROAD & STAIR WITH DRAINAG E FACILITIES INSIDE THE CAMP IN UKHIYA I) CAMP-20 Grant 0582 04 Jun 2020 CSI CONSTRUCTIONS LTD. 60/2 NAYA PALTAN DHAKA - 1000. BANGLADESH Local Government Engineering Department 2,595,188.80
IMPROVEMENT OF HAJIRPARA MUKTER SWDAGOR BARI SIDE- DAKHIN FALIAPARA SAJAHAN BARI RD. CH. 0-2400M MAL Grant 0582 15 Apr 2020 NABARUN TRADERS LIMITED HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,979,161.15
IMPROVEMENT OF RATNAPALONG UP OFFICE COAT BAZAR ? VALUKHIYA BAZAR ROAD BY BC AT CH. 00-4300M & GOYAL Grant 0582 02 Apr 2020 NABARUN TRADERS LIMITED HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,235,480.88
DETAILED DESIGN AND CONST SUPERVISION OF SECOND NO RTHERN GMS TRANSPORT NETWORK IMPVT PROJECT ADB12 Grant 0582 03 Mar 2020 BETS-DEVCON-IWM JV HOUSE # 10 RD 135 GULSHAN - 1 DHAKA 12 12. BANGLADESH Local Government Engineering Department 1,129,587.09
CONSTRUCTION & OPERATION OF SURFACE WATER BASED PI PE WATER SYSTEMS FOR UNCHIPRANG TEKNAF Grant 0582 19 Jan 2020 ABM-MSCL JV HOUSE-B/113 MOSQUE ROAD NEW DOHS MOHA KHALI DHAKA - 1206. BANGLADESH Local Government Engineering Department 2,742,106.72
CONSTRUCTION AND RE-CONSTRUCTION OF STORM WATER DRAINAGE NETWORK ON PRIMARY CANAL - 02 FROM CAMP 20 Grant 0582 22 Dec 2019 NABARUN TRADERS LIMITED HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,178,822.91
CONSTRUCTION AND RE-CONSTRUCTION OF STORM WATER DRAINAGE NETWORK ON PRIMARY CANAL -01 FROM MODHURCH Grant 0582 22 Dec 2019 NABARUN TRADERS LIMITED HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,561,220.36
SUPPLY INSTALLATION AND OPERATION & MAINTENANCE OF SOLAR PV NANO GRID FOR HOUSEHOLD ELECTRICITY SU Grant 0582 26 Aug 2019 B-TRAC ENGINEERING LIMITED BANGLADESH 335/A TEJGAON I/A DHAKA BANGLADESH Local Government Engineering Department 1,596,568.79
UPGRADATION OF ROAD Grant 0582 23 Jun 2019 YAKUB-FMC(JV) ROAD 1 HOUSE 3 FMC HOUSE CHATTOGRAM BANGLADESH Local Government Engineering Department 1,724,545.33
SUPPLY INSTALLATION AND OPERATION & MAINTENANCE OF SOLAR PV MINI GRID CONNECTED 2000 NOS STREET LIGHT Grant 0582 10 Jun 2019 SUPER STAR RENEWABLE ENERGY LIMITED UCEP CHEYNE TOWER (3RD FLOOR) 25 SEGUN BAGICHA RAMNA DHAKA-1000 BANGLADESH Local Government Engineering Department 1,332,515.67
CONSTRUCTION SUPERVISION CONSULTING SERVICES Grant 0582 24 Apr 2019 DESH UPODESH LTD. HOUSE. 21/B ROAD NO.16(27 OLD) DHANMON DI DHAKA BANGLADESH Local Government Engineering Department CONSULTANCY 633,870.68
CONSTRUCTION AND OPERATION OF MINI PIPED WATER Grant 0582 24 Mar 2019 M/S. MT & SS CONSORTIUM DHAKA BANGLADESH Local Government Engineering Department 1,658,891.67
CONSTRUCTION AND OPERATION OF MINI PIPED WATER SUPPLY SYSTEM Grant 0582 06 Mar 2019 ABM WATER COMPANY LAL DIGIRPAR SADAR SHYLET BANGLADESH Local Government Engineering Department 1,621,939.21
CONSTRUCTION OF SEMI-PERMANENT FOOD DISTRIBUTION CENTERS AND LOADING /UNLOADING YARD IN UKHIYA AND Grant 0582 13 Feb 2019 M/S. THOHID & BROTHERS - QC (JV) SATTAR MANSION (1ST FLOOR) 52 KATALGONJ PANCHLAISH CHITTAGONG BANGLADESH Local Government Engineering Department 1,077,358.22
DESIGN MONITORING AND SUPERVISION CONSULTING SERVICES Grant 0582 24 Jan 2019 EPTISA SERVICIOS DE INGENIERIA S.L SPAIN SPAIN Local Government Engineering Department CONSULTANCY 725,553.19
REHABILITATION OF NATIONAL HIGHWAY FROM UKHIA (CHAINAGE 406 494) TO UNCHIPRANG (CHAINAGE- 431 494) Grant 0582 27 Dec 2018 TAHER BROTHERS-HASSAN TEC.BLD.-SALEH AHMED JV STEEL MILL BAZAR NORTH PATENGA CHATTOG RAM BANGLADESH Local Government Engineering Department 15,659,807.25
REHABILITATION OF NATIONAL HIGHWAY FROM LINK ROAD (COX'S BAZAR) (CHAINAGE 381 494) TO UKHIA (CHAINAG Grant 0582 27 Dec 2018 TCCL-JI JV HOUSE 28 BRAMMONPARA SHIBGONG SYLHET BANGLADESH Local Government Engineering Department 12,337,125.74
CONSTRUCTION OF 3 NOS. SCHOOL CUM CYCLONE SHELTER FOR AFFECTED PEOPLE 3 STORY LGED PROTOTYPE IN UK Grant 0582 28 Nov 2018 CONSONANCE AND ABUL BASHAR JV SATTAR CHAMBER 52 KATALGANJ PANCHLAISH CHITTAGONG BANGLADESH Local Government Engineering Department 1,288,479.00
SUPPLY INSTALLATION AND OPERATION & MAINTENANC E OF 2 000 NOS. SOLAR POWERED 20-WATT LED STREET L Grant 0582 26 Nov 2018 INGEN TECHNOLOGY LIMITED RED CRECENT CONCORD TOWER (4TH FLOOR) 1 7 MAHAKHALI C/A DHAKA BANGLADESH Local Government Engineering Department 1,188,710.00

Procurement Plan

Title Document Type Document Date
Emergency Assistance Project: Procurement Plan Procurement Plans Jun 2018