Bangladesh : Emergency Assistance Project

Sovereign Project | 52174-001

The project will support the Government of Bangladesh in addressing the immediate and urgent needs of the displaced persons from Myanmar in Cox's Bazar District, as identified by the United Nations (UN) in its Joint Response Plan (JRP) (displaced persons). The project will mainly support the improvement of water supply and sanitation, disaster risk management, sustainable energy supply, and access roads.

Project Details

  • Project Officer
    Kabir, Md. Humayun
    South Asia Department
    Request for information
  • Country/Economy
    Bangladesh
  • Sector
    • Water and other urban infrastructure and services
Project Name Emergency Assistance Project
Project Number 52174-001
Country / Economy Bangladesh
Project Status Active
Project Type / Modality of Assistance Grant
Loan
Technical Assistance
Source of Funding / Amount
Grant 0582-BAN: Emergency Assistance Project
Asian Development Fund US$ 100.00 million
TA 9546-BAN: Implementing the Emergency Assistance Project
Technical Assistance Special Fund US$ 3.00 million
TA 9546-BAN: Implementing the Emergency Assistance Project (Supplementary)
Technical Assistance Special Fund US$ 1.00 million
Grant 0837-BAN: Emergency Assistance Project-Additional Financing
Asian Development Fund US$ 41.40 million
Loan 4192-BAN: Emergency Assistance Project-Additional Financing
Concessional ordinary capital resources lending US$ 30.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Sector / Subsector

Energy / Electricity transmission and distribution

Transport / Road transport (non-urban)

Water and other urban infrastructure and services / Urban flood protection - Urban policy, institutional and capacity development - Urban sanitation - Urban solid waste management - Urban water supply

Gender Effective gender mainstreaming
Description The project will support the Government of Bangladesh in addressing the immediate and urgent needs of the displaced persons from Myanmar in Cox's Bazar District, as identified by the United Nations (UN) in its Joint Response Plan (JRP) (displaced persons). The project will mainly support the improvement of water supply and sanitation, disaster risk management, sustainable energy supply, and access roads.
Project Rationale and Linkage to Country/Regional Strategy On 7 May 2018, the Government of Bangladesh requested the Asian Development Bank (ADB) for grant support to provide high-priority basic infrastructure and essential services to help address the humanitarian crisis caused by the arrival of the displaced persons. The project meets the requirements for emergency assistance financing.
Impact

Social recovery of displaced persons in Teknaf and Ukhiya camps accelerated (Defined by the project)

Project Outcome
Description of Outcome

Living and health conditions, safety, and resilience of displaced persons improved.

Progress Toward Outcome Works packages for all 4 component (a, b, c & d) awarded and most of them are about to accomplish. To be assessed after completion of project.
Implementation Progress
Description of Project Outputs

Water supply and sanitation, and COVID-19 response improved

Disaster risk management strengthened

Energy sources provided

Access Roads Improved

Status of Implementation Progress (Outputs, Activities, and Issues) The substation constructed and the system is in operation.This component was dropped during the mid-term review.Scope of distribution line reduced from 50 km to 43 km. Works completed.The number of streetlights increased from 2,000 nos. to 4,000 nos. All 4,000 nos. streetlights installed and are in operation.The number of solar PV nano-grid have been increased from 50 nos. to 100 nos. All 100 nos. solar nano-grid system installed and are in operation.7 Water Carriers (3000 liters capacity each) supplied.500 bathing facilities constructed and handed over to beneficiaries. Approximately, 13% of labor employed were women.40 mini piped water supply systems handed over to beneficiaries.Works for 3 nos. waste management facilities complete and the facilities are in operation; while works for rest 2 nos. is in progress.Number of surface water treatment plant increased to 4 nos. Works for 1 no. WTP complete and the facility is in operation; while works for rest 3 nos. is in progress.This component is dropped.Increased to 10.9 km. Works completed.FDCs' number reduced from 7 to 4. 4 FDCs handed over to beneficiaries. About 13% of women labor employed.Increased to 400 nos. All 400 lightning arresters installed.5 multipurpose cyclone shelters already handed over and remaining 5 shelters will be handed over by March 2022.Reduced to 1.22 km based on actual condition. However, works cancelled as relocation of site couldn't be possible.Length decreased to 23 km and total 4 contracts signed. Works for 1 contract (6.5 km) is completed and the road is in operation; while works for other 3 contracts is in progress.Works completed under 2 contracts and the road is in operation.Approximately, 13% of labor employed were women.Length decreased to 20 km and total 4 contracts signed. Works for 2 contracts (16.2 km) is completed and the roads are in operation; while works for other 2 contracts is in progress.
Geographical Location Cox's Bazar, Coxs Bazar
Safeguard Categories
Environment B
Involuntary Resettlement B
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects Awarded contracts included EMP(s) cleared by ADB. Contracts under bidding stage also included EMP(s) cleared by ADB. Where required, national clearances are obtained for components that are awarded. Time bound action plans are in place.
Involuntary Resettlement Only RHD component required RP. RP is disclosed. GRC establishment is under process. No CRP eligible complains.
Indigenous Peoples No impacts on Indigenous Peoples.
Stakeholder Communication, Participation, and Consultation
During Project Design All level of stakeholders relevant to Displaced Myanmar Nationals in Ukhiya, Teknaf and Cox's Bazar had been extensively consulted to design the project scope output and outcomes. The list includes all government agencies (MoDMR, MoLGRDC, ERD, MoFA, DC office, RRRC, LGED, DPHE, BREB, RHD, Dept. of Police, etc.), all development partners (UNHCR, WFP, IOM, ISCG, etc.)
During Project Implementation Consultation by Gender and Social Inclusion Team: 3 FGDs have been conducted at camp-3, camp-4 and camp-13 for validation of project activities. Due to social obligations of Rohingya society, FGDs were conducted with all women participants. Consists of 5-8 women in each FGD, participants have given their consent for construction of bathing facilities (please see attached photos for reference). 3 FGDs have been conducted to evaluate feasibility of recruiting women workers in construction activities. A significant number of women participants have shown strong enthusiasm to work in the construction activities and earth work.
Business Opportunities
Consulting Services

QCBS - national (for firm)

Individual consultant (national)

Procurement

Open competitive bidding (OCB) (national advertisement)

Open competitive bidding (OCB) (International advertisement)

Responsible ADB Officer Kabir, Md. Humayun
Responsible ADB Department South Asia Department
Responsible ADB Division Bangladesh Resident Mission (BRM)
Executing Agencies
Bangladesh Rural Electrification Board
Department of Public Health Engineering
Local Government Engineering Department
Roads and Highways Department
Timetable
Concept Clearance -
Fact Finding 03 Jun 2018 to 07 Jun 2018
MRM 19 Jun 2018
Approval 06 Jul 2018
Last Review Mission -
Last PDS Update 27 Apr 2022

Grant 0582-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
06 Jul 2018 09 Aug 2018 01 Oct 2018 30 Jun 2021 05 Jan 2023 -
Financing Plan Grant Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 120.00 Cumulative Contract Awards
ADB 100.00 25 Sep 2023 99.22 0.00 99%
Counterpart 20.00 Cumulative Disbursements
Cofinancing 0.00 25 Sep 2023 99.22 0.00 99%

Grant 0837-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
22 Jun 2022 29 Jun 2022 08 Aug 2022 30 Jun 2025 - -
Financing Plan Grant Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 53.89 Cumulative Contract Awards
ADB 41.40 25 Sep 2023 15.29 0.00 37%
Counterpart 12.49 Cumulative Disbursements
Cofinancing 0.00 25 Sep 2023 7.41 0.00 18%

Loan 4192-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
22 Jun 2022 29 Jun 2022 08 Aug 2022 30 Jun 2025 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 30.00 Cumulative Contract Awards
ADB 30.00 25 Sep 2023 20.53 0.00 68%
Counterpart 0.00 Cumulative Disbursements
Cofinancing 0.00 25 Sep 2023 2.80 0.00 9%

TA 9546-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
06 Jul 2018 30 Jul 2018 30 Jul 2018 30 Jun 2021 30 Jun 2025 -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
4,000,000.00 0.00 0.00 0.00 0.00 0.00 4,000,000.00 25 Sep 2023 1,367,127.56

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Emergency Assistance Project: Procurement Plan Procurement Plans Jul 2023
Emergency Assistance Project: Roads and Highways Department Audited Project Financial Statements (July 2021-June 2022) Audited Project Financial Statements May 2023
Emergency Assistance Project: Department of Public Health Engineering Audited Project Financial Statements (July 2021-June 2022) Audited Project Financial Statements Dec 2022
Emergency Assistance Project: Local Government Engineering Department Audited Project Financial Statements (July 2021-June 2022) Audited Project Financial Statements Dec 2022
Emergency Assistance Project: Local Government Engineering Department Audited Project Financial Statements (July 2020-June 2021) Audited Project Financial Statements Dec 2021
Emergency Assistance Project: Bangladesh Rural Electrification Board Audited Project Financial Statements (July 2020-June 2021) Audited Project Financial Statements Dec 2021
Emergency Assistance Project: Roads and Highways Department Audited Project Financial Statements (July 2020-June 2021) Audited Project Financial Statements Dec 2021
Emergency Assistance Project: Department of Public Health Engineering Audited Project Financial Statements (July 2020-June 2021) Audited Project Financial Statements Dec 2021
Emergency Assistance Project: Local Government Engineering Department Audited Project Financial Statements (July 2019-June 2020) Audited Project Financial Statements Dec 2020
Emergency Assistance Project: Roads and Highways Department Audited Project Financial Statements (July 2019-June 2020) Audited Project Financial Statements Dec 2020
Emergency Assistance Project: Bangladesh Rural Electrification Board Audited Project Financial Statements (July 2019-June 2020) Audited Project Financial Statements Dec 2020
Emergency Assistance Project: Department of Public Health Engineering Audited Project Financial Statements (July 2019-June 2020) Audited Project Financial Statements Dec 2020
Emergency Assistance Project: Roads and Highways Department Audited Project Financial Statements (July 2018-June 2019) Audited Project Financial Statements Jun 2020
Emergency Assistance Project: Local Government Engineering Department Audited Project Financial Statements (July 2018-June 2019) Audited Project Financial Statements Dec 2019
Emergency Assistance Project: Department of Public Health Engineering Audited Project Financial Statements (July 2018-June 2019) Audited Project Financial Statements Dec 2019
Emergency Assistance Project: Bangladesh Rural Electrification Board Audited Project Financial Statements (July 2018-June 2019) Audited Project Financial Statements Dec 2019
Grant Agreement (Special Operations) for Grant 0582-BAN: Emergency Assistance Project Grant Agreement Aug 2018
Emergency Assistance Project: Project Administration Manual Project/Program Administration Manual Jun 2018
Emergency Assistance Project: Gender Equality and Social Inclusion Action Plan Gender Action Plans Jun 2018
Emergency Assistance Project: Report and Recommendation of the President Reports and Recommendations of the President Jun 2018
Emergency Assistance Project: Technical Assistance Report Technical Assistance Reports Jun 2018

Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Emergency Assistance Project and Emergency Assistance Project – Additional Financing: Environmental Monitoring Report (July-December 2022) Environmental Monitoring Reports Mar 2023
Emergency Assistance Project: Environmental Monitoring Report (January-June 2022) Environmental Monitoring Reports Jul 2022
Emergency Assistance Project: Updated Resettlement Framework Resettlement Frameworks Apr 2022
Emergency Assistance Project: Updated Resettlement Framework Resettlement Frameworks Apr 2022
Emergency Assistance Project: Small Surface Water Treatment Plants Initial Environmental Examination Initial Environmental Examination Apr 2022
Emergency Assistance Project: Multipurpose Cyclone Shelters (Package EAP/LGED/2A) Initial Environmental Examination Initial Environmental Examination Apr 2022
Emergency Assistance Project: Environmental Assessment and Review Framework Environmental Assessment and Review Framework Apr 2022
Emergency Assistance Project: Improvement of National Highway (N1) From Link Road (Cox’sBazar) to Teknaf Initial Environmental Examination Initial Environmental Examination Apr 2022
Emergency Assistance Project: Environmental Monitoring Report (July-December 2021) Environmental Monitoring Reports Feb 2022
Emergency Assistance Project: Social Monitoring Report (July-December 2021) Social Monitoring Reports Jan 2022
Emergency Assistance Project: Environmental Monitoring Report (January-June 2021) Environmental Monitoring Reports Oct 2021
Emergency Assistance Project: Social Monitoring Report (January-June 2021) Social Monitoring Reports Jul 2021
Emergency Assistance Project: Water Supply in Cox’s Bazar Resettlement Plan Resettlement Plans Jun 2021
Emergency Assistance Project: Social Monitoring Report (July-December 2020) Social Monitoring Reports Dec 2020
Emergency Assistance Project: Environmental Monitoring Report (July-December 2020) Environmental Monitoring Reports Dec 2020
Emergency Assistance Project: Environmental Monitoring Report (January-June 2020) Environmental Monitoring Reports Jun 2020
Emergency Assistance Project: Social Monitoring Report (January-June 2020) Social Monitoring Reports Jun 2020
Emergency Assistance Project: Construction of Roads in Teknaf Upazila (EAP/LGED/OCB-N/W2B Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Improvement of Roads in Ukhiya Upazila (EAP/LGED/OCB-N/W4C Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Construction of Internal Roads and Stairs with Drainage Facilities at Ukhiya (Package No. W1B) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Construction of Roads in Ukhiya Upazila (EAP/LGED/OCB-N/W2A Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Improvement of Roads in Ukhiya Upazila (EAP/LGED/W4D Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Construction of Roads in Ukhiya Upazila (EAP/LGED/OCB-N/W1B Package) Initial Environmental Examination Initial Environmental Examination Mar 2020
Emergency Assistance Project: Mini Piped Water Supply Package 3 Subproject Initial Environmental Examination Initial Environmental Examination Feb 2020
Emergency Assistance Project: Mini Piped Water Supply Package 1 Subproject Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Social Monitoring Report (July-December 2019) Social Monitoring Reports Dec 2019
Emergency Assistance Project: Kutupalong- Balukhali Group 3 Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Mini Piped Water Supply Package 2 Subproject Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Semiannual Environmental Monitoring Report (July-December 2019) Environmental Monitoring Reports Dec 2019
Emergency Assistance Project: Shamlapur, Teknaf Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Teknaf and Ukhia Sub-districts Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Mini Piped Water Supply Package 4 Subproject Initial Environmental Examination Initial Environmental Examination Dec 2019
Emergency Assistance Project: Ecological Assessment Report Environmental Monitoring Reports Oct 2019
Emergency Assistance Project: Construction and Re-construction of Storm water Drainage Network on Primary Canal-02 (Package No. W21) Initial Environmental Examination Initial Environmental Examination Aug 2019
Emergency Assistance Project: Construction of Storm water Drainage Network on Primary Canal-01 (Package No. W20) Initial Environmental Examination Initial Environmental Examination Aug 2019
Emergency Assistance Project: Construction of Hill Slope Protection (Package No. W10) Initial Environmental Examination Initial Environmental Examination Jul 2019
Emergency Assistance Project: Ukhiya Cyclone Shelter Initial Environmental Examination Initial Environmental Examination Jun 2019
Emergency Assistance Project: Social Monitoring Report (January-June 2019) Social Monitoring Reports Jun 2019
Emergency Assistance Project: Development of Faliapara Primary School Road and Ukhiya Marine Drive Road Initial Environmental Examination Initial Environmental Examination Jun 2019
Emergency Assistance Project: Environmental Monitoring Report (January-June 2019) Environmental Monitoring Reports Jun 2019
Emergency Assistance Project: Upgradation of 8.8 km Link Road Connecting Cox's Bazar Initial Environmental Examination Initial Environmental Examination Jun 2019
Emergency Assistance Project: National Highway (N1) Improvement Initial Environmental Examination Initial Environmental Examination Feb 2019
Emergency Assistance Project: Teknaf School-cum-Cyclone Shelter (Package EAP/BREB/W9) Initial Environmental Examination Initial Environmental Examination Jan 2019
Emergency Assistance Project: Mini Piped Water Supply Package 5 (EAP/DPHE/W5) Initial Environmental Examination Initial Environmental Examination Jan 2019
Emergency Assistance Project: Ukhiya School-cum-Cyclone Shelter (Package EAP/BREB/W6) Initial Environmental Examination Initial Environmental Examination Dec 2018
Emergency Assistance Project: Social Monitoring Report (July-December 2018) Social Monitoring Reports Dec 2018
Emergency Assistance Project: Environmental Monitoring Report (July-December 2018) Environmental Monitoring Reports Dec 2018
Emergency Assistance Project: 33/11kV Substation in Ukhiya Upazila (Package EAP/BREB/W1A) Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: 33/11KV Substation (10/14MVA, Turn Key) at Palongkhali, Ukhiya Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: Ukhiya School-cum-Cyclone Shelter (Package EAP/BREB/W8) Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: Palongkhali Substations (Package EAP/BREB/W2) Initial Environmental Examination Initial Environmental Examination Nov 2018
Emergency Assistance Project: National Highway (N1) Improvement Resettlement Plan Resettlement Plans Aug 2018
Emergency Assistance Project: Environmental Assessment and Review Framework Environmental Assessment and Review Framework Jun 2018
Emergency Assistance Project: Resettlement Framework Resettlement Frameworks Jun 2018

Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Social Safeguards Consultant Individual - Consulting Active
Financial Management Expert Individual - Consulting Closed
Waste Management Expert (Coordinator) Individual - Consulting Closed
WASH Sector Expert Individual - Consulting Closed
Procurement Consultant Individual - Consulting Closed
Public Health expert Individual - Consulting Closed
Social Development Gender Expert Individual - Consulting Closed
Water Supply Expert Individual - Consulting Closed
Renewable Energy Expert (Rapid Assessment) Individual - Consulting Closed
Water and Sanitation Expert (Rapid Assessment) Individual - Consulting Closed
Water Supply and Sanitation Expert (National) Individual - Consulting Closed
Renewable Energy Expert Individual - Consulting Closed
Procurement Expert (National) Individual - Consulting Closed
Senior Structural Engineer (National) Individual - Consulting Closed
Project Manager/Project Management Specialist Individual - Consulting Closed
Emergency Assistance Project Individual - Consulting Closed
Environmental Specialist-3 Individual - Consulting Closed
G0582-BAN: Emergency Assistance Project [EAP/DPHE/W19] - CORRIGENDUM 2 Invitation for Bids Closed
G0582-BAN: Emergency Assistance Project [EAP/DPHE/W19] - ORIGINAL Invitation for Bids Closed
Structural Engineer for Design of surface water reservoir Individual - Consulting Closed
Geotechnical Engineer for Design of surface water reservoir Individual - Consulting Closed
Hydrologist for Design of Surface Water Reservoir Individual - Consulting Closed
Junior Field Supervision Engineer Individual - Consulting Closed
Junior Field Supervision Engineer Individual - Consulting Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W1A] Invitation for Bids Closed
Junior Field Supervision Engineer Individual - Consulting Closed
Junior Field Supervision Engineer Individual - Consulting Closed
Ecological Specialist Individual - Consulting Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W3 (Rebid 01)] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G5] Invitation for Bids Closed
Project Implementation Engineer Individual - Consulting Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G2B] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W3] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W4] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W3] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W19] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W9] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W1] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G1] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/W2] Invitation for Bids Closed
Design, Monitoring and Supervision Consulting Services of DPHE Component, Cox’s Bazar Firm - Consulting Closed
Procurement Specialist Individual - Consulting Closed
Financial Management Specialist Individual - Consulting Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/W13] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/DPHE/G1] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G2A] CORRIGENDUM Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [WP-01] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/W1A] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [WP-02] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/BREB/G2A] Invitation for Bids Closed
Grant No. 0582-BAN: Emergency Assistance Project [EAP/LGED/OCB-N/W8] Invitation for Bids Closed
Project Coordinator (POC) Individual - Consulting Closed
Design, Monitoring and Supervision Consulting Services Firm - Consulting Closed
Social Development Specialist(GAD) Individual - Consulting Closed
Project Management Specialist/Team Leader Individual - Consulting Closed
Environmental Specialist-1 Individual - Consulting Closed
Social Development Gender Expert Individual - Consulting Closed
Environmental Specialist-2 Individual - Consulting Closed
Construction Supervision Consultancy (CSC) Services for Rehabilitation of National Highway from Link Road (Cox's Bazar) to Unchiprang (50 km) Firm - Consulting Closed
Project Selection and Preparation Engineer Individual - Consulting Closed
Water Supply Engineer Individual - Consulting Closed
Solid Waste Management (SWM) Expert Individual - Consulting Closed
Social Safeguards Specialist Individual - Consulting Closed
Design/Structural Engineer for Storm Water Drainage Individual - Consulting Closed
Procurement Specialist Individual - Consulting Closed
Power System Engineer Individual - Consulting Closed
Renewable Energy Expert Individual - Consulting Closed
Structural Engineer (Hillside slope protection/Food Distribution Center) Individual - Consulting Closed

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
SUPPLY AND OPERATION OF WASTE MANAGEMENT EQUIPMENT /VEHICLE FOR CAMPS IN UKHIYA COX'S BAZAR. Grant 0582 27 Dec 2020 M/S. SARKER KABIR AHAMED | 31 BIR UTTAM K. M. SHAFIULLAH ROAD DHA KA-1205. BANGLADESH Local Government Engineering Department 1,013,819.12
CONSTRUCTION OF PIPED WATER SUPPLY WITH SURFACE WA TER RESERVOIR TREATMENT PLANT AND OTHER ASSOCIATE Grant 0582 27 Dec 2020 S.S RAHMAN INTERNATIONAL - M/S MA ZAHER - M/S | FLAT-1C HOUSE-27 ROAD-08 DHANMONDI BANGLADESH Local Government Engineering Department 2,610,938.52
CONSTRUCTION OF PIPED WATER SUPPLY WITH SURFACE WA TER RESERVOIR TREATMENT PLANT AND OTHER FACILITIE Grant 0582 30 Nov 2020 TITAS-LJI JV | 108 AIRPORT ROAD TEJGAON DHAKA. BANGLADESH Local Government Engineering Department 1,921,468.46
CONSTRUCTION OF PIPED WATER SUPPLY WITH SURFACE WA TER RESERVOIR TREATMENT PLANT AND OTHER FACILITIE Grant 0582 05 Oct 2020 MECL-AWCL (JV) | 269 KOBORSTHAN ROAD MIAPARA GOPALGANJ SADAR GOPALGANJ BANGLADESH Local Government Engineering Department 1,369,156.06
CONSTRUCTION OF SURFACE WATER RESERVOIR BASED PIPE D WATER SYSTEM AT NAYAPARA TEKNAF Grant 0582 17 Aug 2020 ABM WATER COMPANY - M/S. MD. JAMIL IQBAL (ABM | HOUSE-B/113 MOSQUE ROAD NEW DOHS MOHA KHALI DHAKA-1206. BANGLADESH Local Government Engineering Department 2,308,878.87
CONSTRUCTION OF SURFACE WATER RESERVOIR BASED PIPE D WATER SYSTEM AT NAYAPARA TEKNAF Grant 0582 18 Jun 2020 MOSHIUR RAHMAN CHOWDHURY - M/S PARADISE TRADE | HOTEL SUKARNA INT. (RES.) SAMOBOY SUPER MARKET 1ST FLOOR MALOPARA RAJSHAHI BANGLADESH Local Government Engineering Department 1,756,263.35
CONSTRUCTION OF SURFACE WATER TREATMENT PLANT (SWT P) FOR SUPPORTING WATER SUPPLY AT COX'S BAZAR CIT Grant 0582 29 Jun 2020 AWCL-GDL (JV) | HOUSE - B/113 MOSQUE ROAD NEW DOHS MO HAKHALI DHAKA - 1206. BANGLADESH Local Government Engineering Department 2,164,007.58
CONSTRUCTION OF SURFACE WATER TREATMENT PLANT (SWT P) FOR SUPPORTING WATER SUPPLY AT COX?S BAZAR CIT Grant 0582 29 Jun 2020 MONIR ENGINEERING AND CONSTRUCTION LTD. | 269 MIAPARA GOPALGANJ - 8100. BANGLADESH Local Government Engineering Department 2,435,675.11
CONSTRUCTION OF SURFACE WATER TREATMENT PLANT (SWT P) FOR SUPPORTING WATER SUPPLY AT COX?S BAZAR CIT Grant 0582 30 Jun 2020 NC-SEBL (JV) | GULSHAN 1 DHAKA 1212. BANGLADESH Local Government Engineering Department 2,495,485.60
CONSTRUCTION OF INTERNAL ROAD & STAIR WITH DRAINAG E FACILITIES INSIDE THE CAMP IN UKHIYA I) CAMP-20 Grant 0582 04 Jun 2020 CSI CONSTRUCTIONS LTD. | 60/2 NAYA PALTAN DHAKA - 1000. BANGLADESH Local Government Engineering Department 2,595,188.80
IMPROVEMENT OF RATNAPALONG UP OFFICE COAT BAZAR ? VALUKHIYA BAZAR ROAD BY BC AT CH. 00-4300M & GOYAL Grant 0582 02 Apr 2020 NABARUN TRADERS LIMITED | HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,235,480.88
IMPROVEMENT OF HAJIRPARA MUKTER SWDAGOR BARI SIDE- DAKHIN FALIAPARA SAJAHAN BARI RD. CH. 0-2400M MAL Grant 0582 15 Apr 2020 NABARUN TRADERS LIMITED | HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,979,161.15
DETAILED DESIGN AND CONST SUPERVISION OF SECOND NO RTHERN GMS TRANSPORT NETWORK IMPVT PROJECT ADB12 Grant 0582 03 Mar 2020 BETS-DEVCON-IWM JV | HOUSE # 10 RD 135 GULSHAN - 1 DHAKA 12 12. BANGLADESH Local Government Engineering Department 1,129,587.09
CONSTRUCTION & OPERATION OF SURFACE WATER BASED PI PE WATER SYSTEMS FOR UNCHIPRANG TEKNAF Grant 0582 19 Jan 2020 ABM-MSCL JV | HOUSE-B/113 MOSQUE ROAD NEW DOHS MOHA KHALI DHAKA - 1206. BANGLADESH Local Government Engineering Department 2,742,106.72
CONSTRUCTION AND RE-CONSTRUCTION OF STORM WATER DRAINAGE NETWORK ON PRIMARY CANAL - 02 FROM CAMP 20 Grant 0582 22 Dec 2019 NABARUN TRADERS LIMITED | HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,178,822.91
CONSTRUCTION AND RE-CONSTRUCTION OF STORM WATER DRAINAGE NETWORK ON PRIMARY CANAL -01 FROM MODHURCH Grant 0582 22 Dec 2019 NABARUN TRADERS LIMITED | HOUSE NO - 180/7 LAKE CIRCUS BASHIR UD DIN ROAD KALABAGAN DHAKA-1205. BANGLADESH Local Government Engineering Department 1,561,220.36
REHABILITATION OF NATIONAL HIGHWAY FROM UKHIA (CHAINAGE 406 494) TO UNCHIPRANG (CHAINAGE- 431 494) Grant 0582 27 Dec 2018 TAHER BROTHERS-HASSAN TEC.BLD.-SALEH AHMED JV | STEEL MILL BAZAR NORTH PATENGA CHATTOG RAM BANGLADESH Local Government Engineering Department 15,659,807.25
REHABILITATION OF NATIONAL HIGHWAY FROM LINK ROAD (COX'S BAZAR) (CHAINAGE 381 494) TO UKHIA (CHAINAG Grant 0582 27 Dec 2018 TCCL-JI JV | HOUSE 28 BRAMMONPARA SHIBGONG SYLHET BANGLADESH Local Government Engineering Department 12,337,125.74
CONSTRUCTION OF SEMI-PERMANENT FOOD DISTRIBUTION CENTERS AND LOADING /UNLOADING YARD IN UKHIYA AND Grant 0582 13 Feb 2019 M/S. THOHID & BROTHERS - QC (JV) | SATTAR MANSION (1ST FLOOR) 52 KATALGONJ PANCHLAISH CHITTAGONG BANGLADESH Local Government Engineering Department 1,077,358.22
CONSTRUCTION AND OPERATION OF MINI PIPED WATER Grant 0582 24 Mar 2019 M/S. MT & SS CONSORTIUM | DHAKA BANGLADESH Local Government Engineering Department 1,658,891.67
CONSTRUCTION AND OPERATION OF MINI PIPED WATER SUPPLY SYSTEM Grant 0582 06 Mar 2019 ABM WATER COMPANY | LAL DIGIRPAR SADAR SHYLET BANGLADESH Local Government Engineering Department 1,621,939.21
UPGRADATION OF ROAD Grant 0582 23 Jun 2019 YAKUB-FMC(JV) | ROAD 1 HOUSE 3 FMC HOUSE CHATTOGRAM BANGLADESH Local Government Engineering Department 1,724,545.33
SUPPLY INSTALLATION AND OPERATION & MAINTENANCE OF SOLAR PV MINI GRID CONNECTED 2000 NOS STREET LIGHT Grant 0582 10 Jun 2019 SUPER STAR RENEWABLE ENERGY LIMITED | UCEP CHEYNE TOWER (3RD FLOOR) 25 SEGUN BAGICHA RAMNA DHAKA-1000 BANGLADESH Local Government Engineering Department 1,332,515.67
SUPPLY INSTALLATION AND OPERATION & MAINTENANCE OF SOLAR PV NANO GRID FOR HOUSEHOLD ELECTRICITY SU Grant 0582 26 Aug 2019 B-TRAC ENGINEERING LIMITED BANGLADESH | 335/A TEJGAON I/A DHAKA BANGLADESH Local Government Engineering Department 1,596,568.79
DESIGN MONITORING AND SUPERVISION CONSULTING SERVICES Grant 0582 24 Jan 2019 EPTISA SERVICIOS DE INGENIERIA S.L | SPAIN SPAIN Local Government Engineering Department 725,553.19
CONSTRUCTION SUPERVISION CONSULTING SERVICES Grant 0582 24 Apr 2019 DESH UPODESH LTD. | HOUSE. 21/B ROAD NO.16(27 OLD) DHANMON DI DHAKA BANGLADESH Local Government Engineering Department 633,870.68
CONSTRUCTION OF 3 NOS. SCHOOL CUM CYCLONE SHELTER FOR AFFECTED PEOPLE 3 STORY LGED PROTOTYPE IN UK Grant 0582 28 Nov 2018 CONSONANCE AND ABUL BASHAR JV | SATTAR CHAMBER 52 KATALGANJ PANCHLAISH CHITTAGONG BANGLADESH Local Government Engineering Department 1,288,479.00
SUPPLY INSTALLATION AND OPERATION & MAINTENANC E OF 2 000 NOS. SOLAR POWERED 20-WATT LED STREET L Grant 0582 26 Nov 2018 INGEN TECHNOLOGY LIMITED | RED CRECENT CONCORD TOWER (4TH FLOOR) 1 7 MAHAKHALI C/A DHAKA BANGLADESH Local Government Engineering Department 1,188,710.00

Procurement Plan

Title Document Type Document Date
Emergency Assistance Project: Procurement Plan Procurement Plans Jul 2023