Bangladesh : South Asia Subregional Economic Cooperation Dhaka–Sylhet Corridor Road Investment Project-Tranche 1

Sovereign Project | 53382-002

The investment project will finance improvement of the approximately 210 kilometers Dhaka-Sylhet section of the existing National Highway No. 2 from a two-lane road into four lanes, with slow moving vehicular traffic lanes on both sides. The project road connects to the borders with India via the Sylhet-Tamabil section and is designed with features for elderly, women, children and differently-abled inclusion, and disaster and climate risks. This will improve efficiency, connectivity and safety of the Dhaka-Sylhet international corridor.

Project Details

Project Name South Asia Subregional Economic Cooperation Dhaka–Sylhet Corridor Road Investment Project-Tranche 1
Project Number 53382-002
Country / Economy Bangladesh
Project Status Active
Project Type / Modality of Assistance Loan
Technical Assistance
Source of Funding / Amount
TA 6772-BAN: Institutional Strengthening of Roads and Highways Department on Road Safety and Maintenance
Technical Assistance Special Fund US$ 1.00 million
Japan Fund for Prosperous and Resilient Asia and the Pacific US$ 2.00 million
Loan 4108-BAN: South Asia Subregional Economic Cooperation Dhaka"Sylhet Corridor Road Investment Project-Tranche 1
Ordinary capital resources US$ 400.00 million
Operational Priorities OP1: Addressing remaining poverty and reducing inequalities
OP2: Accelerating progress in gender equality
OP3: Tackling climate change, building climate and disaster resilience, and enhancing environmental sustainability
OP6: Strengthening governance and institutional capacity
OP7: Fostering regional cooperation and integration
Sector / Subsector

Transport / Road transport (non-urban)

Gender Effective gender mainstreaming
Description

The investment project will finance improvement of the approximately 210 kilometers Dhaka-Sylhet section of the existing National Highway No. 2 from a two-lane road into four lanes, with slow moving vehicular traffic lanes on both sides. The project road connects to the borders with India via the Sylhet-Tamabil section and is designed with features for elderly, women, children and differently-abled inclusion, and disaster and climate risks. This will improve efficiency, connectivity and safety of the Dhaka-Sylhet international corridor.

The investment project will also improve the geometric design of the existing alignment at major control points such as sharp curves and commercial and residential centers, in line with best engineering practice. The Investment Project will also assist the Roads and Highways Department (RHD) in strengthening its capacity for road safety and road asset maintenance, partly through the attached transaction technical assistance funded by the Japan Fund for Poverty Reduction (subject to the approval of the Government of Japan) and the ADB's Technical Assistance Special Fund.

Project Rationale and Linkage to Country/Regional Strategy

Upgrading Bangladesh's major roads, especially the subregional trade corridors, to internationally comparable standards will contribute to facilitating international trade. This will, in turn, support the country's economic growth and reduce poverty, as well as ensure inclusiveness of road transport. The government's Eighth Five Year Plan (2020-2025) therefore aims to construct 550 km of new multi-lane roads, add 150 km of new lanes, improve or rehabilitate 1,800 km of the National Highways, as well as achieve 10% reduction in road traffic accidents by 2025. For achieving these targets, the Plan prioritizes core transformational road projects requiring large investments and emphasizes stronger implementation capacity of the RHD for completing these projects timely. The investment project will contribute to achieving these targets of the Plan.

Transport infrastructure is also the centerpiece of the ADB-supported SASEC program, which promotes regional prosperity. The SASEC Operational Plan, 2016-2025 identified 112 priority regional cooperation and integration transport projects worth about $58.9 billion. It includes the widening of the NH2 of which the proposed SASEC Dhaka-Sylhet Corridor Road Investment Project is a major part.

Impact

An efficient, sustainable, safe and regionally balanced transport system developed.

Project Outcome
Description of Outcome

Mobility, access, and regional trade along the Dhaka-Sylhet corridor road improved.

Progress Toward Outcome
Implementation Progress
Description of Project Outputs

The Dhaka-Sylhet corridor road upgraded with enhanced road safety, elderly, women, children, and differently abled- responsive, and climate- and disaster-resilient features

Institutional capacity of the Roads and Highways Department enhanced

Status of Implementation Progress (Outputs, Activities, and Issues)

Not yet due.

The consulting service contract with the consultant for Output 1 & 2 of the attached TRTA was signed on 16 September 2022.

The consultant will propose an optimal institutional arrangement and business process for mainstreaming road safety in RHD's

operation.

The consulting service contract with the consultant for Output 3 of the attached TRTA was signed on 16 September 2022. The consultant will assist the RHD in utilizing the adopted tool for optimizing its annual road maintenance plan.

The consulting service contract with the consultant for Output 1 & 2 of the attached TRTA was signed on 16 September 2022. The consultant will propose an optimal institutional arrangement and business process for mainstreaming road safety in RHD's operation.

Not yet due

Not yet due

As of end Q3 2023: out of 6 packages comprising of 13 lots, 6 packages comprising 12 contracts are awarded, and 1 package/contract was recommended for contract award.

Geographical Location Dhaka, Sylhet
Safeguard Categories
Environment B
Involuntary Resettlement A
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects The investment project is categorized as B as per ADB's Safeguard Policy Statement (SPS) 2009. The initial environmental examination (IEE), prepared for the entire project road in compliance with ADB's SPS and satisfying the Government's Environmental Conservation Rules 1997, concluded that most of the potential significant impacts such as large volumes of construction materials, transportation, storage and handling, increase in air pollutants, noise and vibration levels, management of construction and demolition waste, siltation of waterways, and traffic obstruction near active construction sites are reversible, largely limited to construction period, mostly localized, and short-term in nature. The entire alignment is not passing through or located proximate to any protected/eco-sensitive area. Diversion of forest land is minimal and limited to a single location. Cutting of trees and loss of agricultural land and physical assets will be compensated in accordance with ADB's SPS and the national requirements. Additional plantations are proposed on top of regulatory requirement to enhance the micro-climate and serve as carbon sink.
Involuntary Resettlement The investment project is categorized as A as per ADB's SPS. A draft resettlement plan is prepared for the entire Dhaka-Tamabil section excluding the 11.5km section to be funded by the Exim Bank of India based on draft design of the alignment. The resettlement plan is based on the preliminary design. A total of 582.51 hectares of private land will need to be acquired. Total of 9,286 households/unit/entities (55,454 affected persons) will be affected due to the project implementation, which are disaggregated into 8,905 households, 302 common property resources, 56 government offices, 21 RHD owned structures and 2 NGO/Association structures. The total 7,355 households/unit/entities will require physical displacement, of which 4,679 are titleholders, 2,060 are non-title holders, and 276 are common property resources and other government and non-government offices. A total 10 stakeholder consultation meetings and 61 focus groups discussion were conducted between October 2019 and February 2020. Stakeholder engagement will continue throughout the land acquisition process.
Indigenous Peoples The investment project is categorized as C as per ADB's SPS. It does not affect tribal lands, and the survey confirmed that no indigenous communities, as defined under the ADB SPS, is affected.
Stakeholder Communication, Participation, and Consultation
During Project Design A total 10 stakeholder consultation meetings and 61 focus groups discussion were conducted between October 2019 and February 2020.
During Project Implementation Stakeholder engagement will continue throughout the land acquisition process.
Business Opportunities
Consulting Services For consultancies financed by ADB, all consultants will be recruited according to ADB Procurement Policy (2017, as amended from time to time) and ADB Procurement Regulations for ADB Borrowers (2017, as amended from time to time).
Procurement For procurement of goods, works and consulting services to be financed by ADB, ADB Procurement Policy (2017, as amended from time to time) and Procurement Regulations for ADB Borrowers (2017, amended from time to time) shall apply. ADB's standards bidding documents with pre- or post-qualification will be adopted with appropriate modifications.
Responsible ADB Officer Zhao, Gengwen
Responsible ADB Department Sectors Group
Responsible ADB Division Transport Sector Office (SG-TRA)
Timetable
Concept Clearance -
Fact Finding -
MRM 01 Jun 2021
Approval 27 Aug 2021
Last Review Mission -
Last PDS Update 01 Dec 2023

Loan 4108-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
08 Sep 2021 04 Oct 2021 15 Nov 2021 30 Sep 2024 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 879.90 Cumulative Contract Awards
ADB 400.00 24 Jan 2024 384.47 0.00 96%
Counterpart 479.90 Cumulative Disbursements
Cofinancing 0.00 24 Jan 2024 153.86 0.00 38%

TA 6772-BAN

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
27 Aug 2021 03 Jan 2022 03 Jan 2022 30 Sep 2024 - -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
1,000,000.00 2,000,000.00 0.00 0.00 0.00 0.00 3,000,000.00 24 Jan 2024 918,232.19
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating Satisfactory Satisfactory Satisfactory Satisfactory - Satisfactory

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.


Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.


Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Individual Consultant Service as Financial Management Expert (Nat'l) for SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
53382-BAN: South Asia Subregional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project [WP-6 LOT No. DS-12B] Invitation for Bids Closed
Individual Consultant Service as Senior Contract Specialist (Intl) Individual - Consulting Closed
Individual Consultant Service as Health and Safety Expert (int'I) SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
L4108-BAN:South Asia Subregional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project (WP-5) Invitation for Bids Closed
4108-BAN: South Asia Sub-Regional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project (WP-4) Invitation for Bids Closed
Individual Consultant Service as Gender Expert (National) FOR SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
Individual Consultant Service as Senior Gender Expert (International) for SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
Individual Consultant Service as Senior Social Safeguard Expert (International) for SASEC Dhaka-Sylhet Corridor Road investment [02 Person]] Individual - Consulting Closed
Individual Consultant Service as Social Safeguard Expert (National) [06 Persons] for SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
Individual Consultant Service as Environmental Safeguard Expert (National) [03 Persons] for SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
Individual Consultant Service as Senior Environmental Safeguards Specialist/Environment Team Leader (Construction Management Expertise) (International) for SASEC Dhaka-Sylhet Corridor Road investment Individual - Consulting Closed
Individual Consultant Service as Environmental Safeguard Expert (External Monitor) (International) for SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
Individual Consultant Service as Senior Environmental Specialist (Environmental Impact/Biodiversity Management Expertise) (International) Individual - Consulting Closed
53382-BAN: South Asia Subregional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project [WP-6 Lot No. DS-11 and Lot No. DS-12A] Invitation for Bids Closed
53382-BAN: South Asia Subregional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project [WP-3 Lot No. DS-5 and Lot No. DS-6] Invitation for Bids Closed
Consulting services for value addition in road safety Firm - Consulting Closed
South Asia Subregional Economic Cooperation Dhaka–Sylhet Corridor Road Investment Project-Tranche 1: Road Safety Firm - Consulting Closed
SASEC Dhaka–Sylhet Corridor Road Investment Project-Tranche 1 - Output 3 (Road Asset Maintenance) Firm - Consulting Closed
Individual Consultant Service as Financial management expert (Nat'l) for SASEC Dhaka-Sylhet Corridor Road Investment Project Individual - Consulting Closed
53382-BAN: South Asia Subregional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project [WP-2 Lots DS-3 and DS-4] Invitation for Bids Closed
53382-BAN: South Asia Subregional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project – Tranche 1 [WP-1] Invitation for Bids Closed
Consulting Service by Project Implementation Consultants for Supervision of Civil Works and Safeguard Activities of South Asia Subregional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Pr Firm - Consulting Closed

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
WP-06B/Improvement of Dhaka-Sylhet National Highway (N2) into 4-lane highway with service lanes on both sides from 7 Armed Police Battalion HQ, Lalabazar to Peer Habibur Rahman Chattar (Ch 211+900 to 222+600 km) Loan 4108 29 Mar 2024 JOINT VENTURE OF ZHENGZHOU CITY HIGHWAY ENGINEERING COOPERATION, CHINA & MAX INFRASTRUCTURE LIMITED, BANGLADESH (ZZHE-MIL) | 6th Floor, Baitul Hossain Building, 27, Dilkusha Commercial Area, Dhaka 1000, Bangladesh Road Transport and Highways Division, Ministry of Road Transport and Bridges 61,025,791.18 6,661,286.13
DS 9 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Square Textiles Land, Bahubal to Sadarghat Natun Bazar Jame Masjid (chainage 151+000 to 169+900) Loan 4108 17 Oct 2023 Concord Pragatee Consortium - China Railway First Group Co., Ltd. JV | 5/10, Lalmatia Housing Society, Block #D, Dhaka-12-7, Bangladesh Road Transport and Highways Division, Ministry of Road Transport and Bridges 107,217,517.40 28,929,654.73
DS 10 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Sadarghat Natun Bazar Jame Masjid to Sherpur Bridge Toll Plaza (chainage 169+900 to 186+700) Loan 4108 17 Oct 2023 China Railway First Group Co., Ltd. | #1, Yantabeilu Road, Xi'an, China Road Transport and Highways Division, Ministry of Road Transport and Bridges 136,999,956.80 36,702,769.43
Value addition in road safety 4108 23 Jun 2023 Joint venture of AYOLEEZA CONSULTANTS PRIVATE LIMITED (India), JP RESEARCH INDIA PRIVATE LIMITED (India), Musad Engineering & Consultancy (India), and Road Safety International (Australia) | A-5, Sector-4, Noida, India Road Transport and Highways Division, MORTB 1,501,313.99 751,911.50
DS-7 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from S M Spinning Mills Limited to Sayestaganj Bypass BM Auto Gas Filling Station (chainage 116+400 to 134+600) Loan 4108 20 Jun 2023 Sichuan Road and Bridge (Group) Corporation Ltd. - Biswas Trading and Construction JV | New Market City Complex, 44/1 Rahim Square, New Market, Dhaka, Bangladesh Road Transport and Highways Division, MORTB 94,833,490.79 24,436,659.52
DS-8 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into 4-Lane Highway w Service Lane on Both Sides from Sayestaganj Bypass BM Auto Gas Filling Station to Square Textiles Land, Bahubal. (chainage 134+600 to 151+000) Loan 4108 27 Jun 2023 China Construction Seventh Engineering Division Corp. Ltd. - Spectra Engineers Limited JV (CSCEC7- SPECTRA JV) | House 11, Road 9, Baridhara Diplomatic Zone, Dhaka 1212 Road Transport and Highways Division, MORTB 120,388,147.90 33,069,009.62
SP-5: Senior Contract Specialist (International) Loan 4108 09 May 2023 Shambhu KC | New Baneswore, Kathmandu, Nepal Road Transport and Highways Division, MORTB 160,540.00 111,680.00
DS-3 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Narsingdi BSCIC to Marco LPG Autogas Filling Station (chainage 35+000 to 53+500) Loan 4108 24 Mar 2023 Henan Highway Engineering Group Co., Ltd. - Mir Akhter Hossain Ltd. | No. 91 Zhongyuan Road, Zhengzhiu City Road Transport and Highways Division, MORTB 113,600,446.80 33,173,482.09
DS-4 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Marco LPG Autogas Filling Station to Bairab Bridge West End Toll Plaza (chainage 53+500 to 67+850) Loan 4108 31 Mar 2023 Henan Highway Engineering Group Co., Ltd. - Mir Akhter Hossain Ltd. | No. 91 Zhongyuan Road, Zhengzhiu City Road Transport and Highways Division, MORTB 126,840,674.00 38,343,756.74
DS-5 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Sarail Intersection to Budhanti bus stand (chainage 80+500 to 97+300) Loan 4108 02 Mar 2023 Henan Highway Engineering Group Co., Ltd. - Mir Akhter Hossain Ltd. JV | No. 91 Zhongyuan Road, Zhengzhiu City Road Transport and Highways Division, MORTB 144,058,232.70 40,628,419.69
DS-6 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Budhanti bus stand to S M Spinning Mills Limited (chainage 97+300 to 116+400) Loan 4108 12 Feb 2023 China Shandong International Economic & Technical Cooperation Group Ltd - Shandong Luqiao Group Co. Ltd - Property Development Limited JV | No. 14677, Jingshi Road, Lixia District, Jinan City, Shandong Province Road Transport and Highways Division, MORTB 117,168,707.50 31,771,880.49
SP-9: Senior Social Safeguard Expert Loan 4108 04 Jan 2023 Md. Nurul Hoque | 208, West Shantibag, Flat No. B-3 Post: Shantinagar, Dhaka-1217, Bangladesh Road Transport and Highways Division, MORTB 298,984.32 228,788.00
SP-6: Biodiversity Expert (International) Loan 4108 28 Jan 2023 Shailendra Pratap Singh | H-4, Dharma Apartment, 2 IP Extension, Delhi-110092 Road Transport and Highways Division, MORTB 438,243.44 304,865.00
SP-6: External Monitor (International) Loan 4108 28 Jan 2023 Md. Mohsin Almaji | House #7, Road #11, Sector #13, Uttara-Dhaka-1230 Road Transport and Highways Division, MORTB 398,482.00 304,925.00
SP-6: Construction Management/Team Leader (International) Loan 4108 28 Jan 2023 Shreeniwas Verma | A-7/01, Shivaji Apartments, Sector-14, Rohini, Delhi-110085, India Road Transport and Highways Division, MORTB 515,344.00 358,500.00
SP-8: Health and Safety Expert Loan 4108 02 Jan 2023 Md. Shohel Mahamud | House-6 (5th floor), Avenue-5, Block-C, Mirpur Section-6 Dhaka Road Transport and Highways Division, MORTB 164,460.00 128,708.00
SP-9: Senior Social Safeguard Expert Loan 4108 04 Jan 2023 Biswanath Debnath | I-1669 First Floor Chittaranjan Park New Delhi, Delhi India-110019 Road Transport and Highways Division, MORTB 370,764.31 257,923.00
DS-12A Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Sherpur Bridge Toll Plaza to 7-Armed Police Battalion Headquarters, Lalabazar (Ch 186+700 to 211+900) Loan 4108 20 Dec 2022 Sinohydro Engineering Bureau 8 Corporation Limited | No. 8 Changquing Road, Tianxin District, Changsha City, PRC Road Transport and Highways Division, MORTB 61,255,636.65 17,712,627.63
Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Sherpur Bridge Toll Plaza to 7-Armed Police Battalion Headquarters, Lalabazar (Ch 186+700 to 211+900) Loan 4108 12 Dec 2022 EN-EZ insaat Sanayive Ticaret A. S.-Toma Construction & Co. Ltd. JV | Toma Tower, 77/1, Kakrail, Ramna, Dhaka-1000 Road Transport and Highways Division, MORTB 97,894,901.40 23,256,166.09
SP-7 - National Environmental Safeguard Expert Loan 4108 20 Dec 2022 Md. Saiful Islam | Holding-647/2, West Kazipara, Mirpur Dhaka Road Transport and Highways Division, MORTB 133,780.57 103,550.68
SP-7 - National Environmental Safeguard Expert Loan 4108 20 Dec 2022 Mohammad Arifur Rahman | Flat-B1, House 548, Noyatola, Moghbazar, Dhaka Road Transport and Highways Division, MORTB 144,803.68 112,082.95
SP-01: Project Implementation Consultant Loan 4108 20 Dec 2022 Joint venture between Intercontinental Consultants & Technocrats Pvt. Ltd. (IND), IRD Engineering S.R.L. (ITA), and Sheladia Associates, Inc. (USA) in association with Associates For Development Services Limited (BAN), and KS Consultants Ltd. (BAN) | A-8, Green Park, New Delhi - 110016, India Road Transport and Highways Division, MORTB 27,374,511.53 3,926,143.34
DS-2 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Sonpara Bus Stand to Narsingdi BSCIC (chainage 18+000 to 35+000) Loan 4108 25 Nov 2022 Zhengzhou City Highway Engineering Corporation | No. 55 Huaihe Road, Erqi District, Zhenghou City, Henan Province, China Road Transport and Highways Division, MORTB 135,748,497.00 27,134,629.53
DS-1 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Katchpur Intersection to Sonpara Bus Stand Loan 4108 25 Nov 2022 Longjian Road & Bridge Co., Ltd. | Room 502, Unit 1, Building C08, Xuewei Guojicheng Community, Xueyuan Road, Hulan Disctrict, Harbin City, China Road Transport and Highways Division, MORTB 90,068,746.33 31,506,563.28
Capacity Development Technical Assistance Technical Assistance 6772 16 Sep 2022 Oriental Consultants Global Co., Ltd. (JAPAN) in association with East Nippon Expressway Company Limited (JAPAN) | 20-2 Nishishinjuku, 3-chome 163-1409 Tokyo, Japan Ministry of Road Transport and Bridges 855,374.00
Capacity Development Technical Assistance Technical Assistance 6772 16 Sep 2022 TRL LIMITED (U.K.) in association with TRL Technologies India Private Limited (INDIA) | Crowthorne House, Nine Mile Ride Wokingham, Berkshire RG40 3GA United Kingdom Ministry of Road Transport and Bridges 1,732,548.00
SP-13: Individual Consultant Service as Financial management expert (Nat'l) for SASEC Dhaka Sylhet Road Corridor Investment Project Loan 4108 22 Feb 2022 Md. Rejaul Karim | Flat No: A-5, Shimul Building, Protik Rupassree,Road No: 12/4 Block:J, South Banarsree Road Transport and Highways Division, MORTB 146,592.91 108,516.59
DS-5 Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides from Sarail Intersection to Budhanti bus stand (chainage 80+500 to 97+300) Loan 4108 02 Mar 2023 Henan Highway Engineering Group Co., Ltd. - Mir Akhter Hossain Ltd. JV | No. 91 Zhongyuan Road, Zhengzhiu City Road Transport and Highways Division, MORTB 144,058,232.70 40,628,419.69