Pakistan : Emergency Flood Assistance Project

Sovereign Project | 56312-001

The emergency project was prepared in response to the Government of Pakistan's request to the Asian Development Bank (ADB) on 6 October 2022 to support its post-flood recovery and reconstruction response. The project will contribute to the economic recovery of flood-ravaged provinces of Balochistan, Khyber Pakhtunkhwa and Sindh, while building longer-term resilience. It will finance the rehabilitation and reconstruction of high-priority transport (roads and bridges), irrigation, drainage, flood risk management, and on-farm water management infrastructure that were damaged by the devastating floods. The project will also support the restoration of economic productivity and livelihoods of the flood-affected rural communities. The project is part of ADB's multitiered flood response to Pakistan and was designed in close coordination and cooperation with the World Bank.

Project Details

Project Name Emergency Flood Assistance Project
Project Number 56312-001
Country / Economy Pakistan
Project Status Active
Project Type / Modality of Assistance Grant
Loan
Technical Assistance
Source of Funding / Amount
Loan 4279-PAK: Emergency Flood Assistance Project
Concessional ordinary capital resources lending US$ 475.00 million
TA 10036-PAK: Implementing the Emergency Flood Assistance Project
Technical Assistance Special Fund US$ 3.05 million
Grant 9234-PAK: Emergency Flood Assistance ProjectAdditional Financing
Japan Fund for Prosperous and Resilient Asia and the Pacific US$ 5.00 million
Operational Priorities OP2: Accelerating progress in gender equality
OP3: Tackling climate change, building climate and disaster resilience, and enhancing environmental sustainability
OP5: Promoting rural development and food security
Sector / Subsector

Agriculture, natural resources and rural development / Agricultural drainage - Agricultural production - Irrigation - Rural flood protection

Transport / Road transport (non-urban)

Gender Effective gender mainstreaming
Description The emergency project was prepared in response to the Government of Pakistan's request to the Asian Development Bank (ADB) on 6 October 2022 to support its post-flood recovery and reconstruction response. The project will contribute to the economic recovery of flood-ravaged provinces of Balochistan, Khyber Pakhtunkhwa and Sindh, while building longer-term resilience. It will finance the rehabilitation and reconstruction of high-priority transport (roads and bridges), irrigation, drainage, flood risk management, and on-farm water management infrastructure that were damaged by the devastating floods. The project will also support the restoration of economic productivity and livelihoods of the flood-affected rural communities. The project is part of ADB's multitiered flood response to Pakistan and was designed in close coordination and cooperation with the World Bank.
Project Rationale and Linkage to Country/Regional Strategy

Pakistan is a flood-prone country and one of the 10 countries most affected by climate change in the world. During April-June 2022, it suffered an unprecedented heatwave followed by a prolonged and intense monsoon across the country. Consequently, Pakistan experienced the worst flooding in a century, with glacial lakes bursting, rivers breaking their banks, flash flooding, and landslides. Like the earlier major floods in 2010, the 2022 floods occurred at the time of a La Nina event that exacerbated the monsoon rainfall. It is also likely that climate change increased the flood impact. Monsoon rainfall in Balochistan and Sindh is estimated to be 50%-75% more intense than it would be in the absence of climate change. Pakistan's flood risks are further exacerbated by poorly functioning disaster management institutions and an ineffective early-warning system for floods. Pakistan's National Flood Protection Plan-IV (2017) was prepared by the Federal Flood Commission after the 2010 floods, comprising structural and non-structural measures for flood risk reduction and management. It is under-implemented and under-funded. Future flood frequency and magnitude is expected to increase under climate change.

In the wake of rising prices at the global level, Pakistan was facing significant economic challenges even before the recent floods. The devastating floods have compounded this situation. More than half of all districts in the country have been officially declared calamity-hit. Out of the 25 poorest districts in the country before the floods, 19 were calamity-affected, pushing people who were already poor into acute poverty. The floods impacted 33 million people across the country (or 14.5% of the population). The provinces of Balochistan and Sindh are most affected with over 80% of their total land area impacted by floods. A post-disaster needs assessment (PDNA) -led by the government and supported by a core team comprising ADB, the European Union (EU), United Nations (UN) agencies with technical facilitation from the United Nations Development Programme, and the World Bank - was concluded on 28 October 2022. The PDNA provides the basis for the development of a disaster recovery framework and arrangements for effective, efficient, and coordinated post-flood recovery and reconstruction. The PDNA findings estimate total damage and losses at $30.1 billion, with total damage (total or partial destruction of physical assets) estimated at $14.9 billion and total losses (change in economic flows) at $15.2 billion. The ensuing recovery and reconstruction needs are estimated at $16.3 billion.

Impact

An inclusive and resilient recovery from the 2022 floods.

Project Outcome
Description of Outcome

Flood-affected infrastructure and livelihoods improved

Progress Toward Outcome
Implementation Progress
Description of Project Outputs

Flood-damaged roads and bridges in project areas rehabilitated and reconstructed

Flood-damaged irrigation, drainage, and flood risk management infrastructure in Balochistan and Khyber Pakhtunkhwa rehabilitated and/or upgraded

Rural livelihood systems in Balochistan restored

Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Balochistan, Khyber Pakhtunkhwa, Sindh
Safeguard Categories
Environment B
Involuntary Resettlement B
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects Project activities are mainly focused upon the rehabilitation of critical infrastructure. All works will be confined to the areas of the infrastructure to be rehabilitated. Outputs 1 and 2 of the projects, will have limited site-specific impacts related to deterioration of ambient air quality, noise generation, occupational and community health and safety during the construction phase. Output 3 will have negligible environmental impacts as it involves minor physical works at farm level.
Involuntary Resettlement Involuntary resettlement impacts will be avoided wherever possible and although some minor land acquisition may be required for reconstruction works, few severe impacts, if any, are expected.
Indigenous Peoples There are no indigenous people (IP) as defined by ADB's Safeguard Policy Statement (2009) expected in the project area.
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services

At the request of respective executing agencies, consulting firms will be recruited through single-source selection (SSS) and advance action, to promptly prepare flood resilient designs for the rehabilitation and reconstruction works under various project outputs.

The attached technical assistance would mostly use individual consultants on a needs basis. A deployment plan based on requirements and terms of reference of key consultants for the TA will be developed during the first months of its implementation.

Procurement The project procurement arrangements are based on the fitness for purpose approach to increase the efficiency and flexibility of measures suited to the context of emergency assistance loans while consistent with ADB policies and relevant provisions under the local law and regulations.
Responsible ADB Officer Shafi, Mian S.
Responsible ADB Department Sectors Group
Responsible ADB Division Transport Sector Office (SG-TRA)
Executing Agencies
Agriculture and Cooperatives Department Balochistan
Irrigation Department, Government of Balochistan
Khyber Pakhtunkhwa Irrigation Department
National Highway Authority
Sindh Works and Services Department
Timetable
Concept Clearance -
Fact Finding 25 Oct 2022 to 03 Nov 2022
MRM 16 Nov 2022
Approval 12 Dec 2022
Last Review Mission -
Last PDS Update 12 Dec 2022

Grant 9234-PAK

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
16 Feb 2023 28 Feb 2023 24 Mar 2023 31 Mar 2024 - -
Financing Plan Grant Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 5.00 Cumulative Contract Awards
ADB 0.00 18 Apr 2024 0.00 5.00 100%
Counterpart 0.00 Cumulative Disbursements
Cofinancing 5.00 18 Apr 2024 0.00 5.00 100%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - - - Unsatisfactory - Unsatisfactory

Loan 4279-PAK

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
12 Dec 2022 15 Dec 2022 09 Feb 2023 30 Jun 2026 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 531.00 Cumulative Contract Awards
ADB 475.00 18 Apr 2024 269.66 0.00 57%
Counterpart 56.00 Cumulative Disbursements
Cofinancing 0.00 18 Apr 2024 50.22 0.00 11%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - - - Unsatisfactory - Unsatisfactory

TA 10036-PAK

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
12 Dec 2022 22 Dec 2022 22 Dec 2022 31 Dec 2025 - -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
3,050,000.00 0.00 0.00 0.00 0.00 0.00 3,050,000.00 18 Apr 2024 825,534.66

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Title Document Type Document Date
Emergency Flood Assistance Project - Additional Financing: Audited Project Financial Statements (July 2022-June 2023) Audited Project Financial Statements Feb 2024
Emergency Flood Assistance Project: Procurement Plan Procurement Plans Dec 2023
Grant Agreement (Externally Financed) for Grant 9234-PAK: Emergency Flood Assistance Project - Additional Financing Grant Agreement Feb 2023
Project Agreement for Grant 9234-PAK: Emergency Flood Assistance Project - Additional Financing Project/Program Agreements Feb 2023
Emergency Flood Assistance Project - Additional Financing: Additional Financing Report Additional Financing (Cofinancing) Feb 2023
Emergency Flood Assistance Project - Additional Financing: Project Administration Manual Project/Program Administration Manual Feb 2023
Emergency Flood Assistance Project - Additional Financing: Gender Action Plan Gender Action Plans Feb 2023
Project Agreement (Province of Sindh) for Loan 4912-PAK (Concessional): Emergency Flood Assistance Project Project/Program Agreements Dec 2022
Loan Agreement (Ordinary Operations [Concessional) for Loan 4279-PAK: Emergency Flood Assistance Project Loan Agreement (Ordinary Resources) Dec 2022
Project Agreement (National Highway Authority) for Loan 4912-PAK (Concessional): Emergency Flood Assistance Project Project/Program Agreements Dec 2022
Project Agreement (Province of Balochistan) for Loan 4912-PAK (Concessional): Emergency Flood Assistance Project Project/Program Agreements Dec 2022
Project Agreement (Khyber Pakhtunkhwa Province) for Loan 4912-PAK (Concessional): Emergency Flood Assistance Project Project/Program Agreements Dec 2022
Emergency Flood Assistance Project: Report and Recommendation of the President Reports and Recommendations of the President Nov 2022
Emergency Flood Assistance Project: Project Administration Manual Project/Program Administration Manual Nov 2022
Emergency Flood Assistance Project: Gender Action Plan Gender Action Plans Nov 2022
Implementing the Emergency Flood Assistance Project: Technical Assistance Report Technical Assistance Reports Nov 2022
Emergency Flood Assistance Project - Additional Financing: Procurement Plan Procurement Plans Nov 2022

Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.


Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

  • 12 Dec 2022 | News Release

    ADB Approves Flood Assistance Package for Pakistan

    A $554 million financing package, including new and reallocated funds, has been approved to support recovery and reconstruction efforts in Pakistan, following this year’s devastating floods.

Tenders

Tender Title Type Status Posting Date Deadline
EFAP - Transport Specialist Individual - Consulting Closed
Emergency Flood Assistance Project - Financial Management Expert Individual - Consulting Closed
TA EFAP: Economist (Flood Risk Management) International Individual - Consulting Closed
Emergency Flood Assistance Project - Social Safeguards Specialist Individual - Consulting Closed
Emergency Flood Assistance Project - Project Coordinator and Monitoring Specialist Individual - Consulting Closed
Emergency Flood Assistance Project - Gender Specialist Individual - Consulting Closed
EFAP- Economist (Flood Risk Management) National Individual - Consulting Closed
EFAP: Stakeholder Engagement and Grievance Redressal Specialist Individual - Consulting Closed
EFAP: Irrigation Infrastructure Engineer Individual - Consulting Closed
EFAP: Spate Irrigation Specialist (International) Individual - Consulting Closed
EFAP: Spate Irrigation Specialist (National) Individual - Consulting Closed
Emergency Flood Assistance Project - Environmental Safeguards Specialist Individual - Consulting Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [EFAP/KPID-CW-01] - CORRIGENDUM Invitation for prequalification Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [EFAP/KPID-CW-01] - ORIGINAL Invitation for prequalification Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [N5, N55] Invitation for prequalification Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [N25] Invitation for prequalification Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [EFAP-BID-CW-PQ-CI, EFAP-BID-CW-PQ-CII, EFAP-BID-CW-PQ-CIII] Invitation for prequalification Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [N25, N50] Invitation for prequalification Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [M8, N65] Invitation for prequalification Closed
Loan 4279-PAK (COL): Emergency Flood Assistance Project [N-95, N-35, and N-15] Invitation for prequalification Closed
EFAP- Dashboard Designer/Web portal Front-end Development Specialist Individual - Consulting Closed
EPAF -System Architecture and DevOp Specialist Individual - Consulting Closed
Loan 4279-PAK: Emergency Flood Assistance Project [EFAP-NHA-CW-06: Package-6 Lots 1 and 2] Invitation for prequalification Closed
EFAP - Irrigation, Drainage, Flood Management Specialist - 2 Individual - Consulting Closed
EFAP - Irrigation, Drainage, Flood Management Specialist - 1 Individual - Consulting Closed
EFAP - Water Resources and Climate Change Expert Individual - Consulting Closed
EFAP - On-farm Water Management and Agriculture Specialist Individual - Consulting Closed
EFAP - Community and Rural Development Specialist Individual - Consulting Closed
Project Supervision and Monitoring Consultants Firm - Consulting Closed
Emergency Flood Assistance Project - Procurement & Contract Management Specialist Individual - Consulting Closed
Emergency Flood Assistance Project - Procurement Specialist Individual - Consulting Closed
Emergency Flood Assistance Project - Procurement Coordinator Individual - Consulting Closed
Rural Development Specialist/Coordinator Individual - Consulting Closed
Emergency Flood Assistance Project - National Financial Management Specialist Individual - Consulting Closed
Emergency Flood Assistance Project - International Monitoring and Evaluation Economist Individual - Consulting Closed
Emergency Flood Assistance Project - National Agriculture Specialist (Climate Change)_1 Individual - Consulting Closed
Emergency Flood Assistance Project - International Food Security Specialist Individual - Consulting Closed

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
EFAP-BI-CW-02: EFAP Package-II - Repair and Rehab of 2 storages/banks/embankments and 1 flood perennial irrigation system in District Surab and Khuzdar Loan 4279 20 Mar 2024 M/s Umer Jan and Company - M/s Mumtaz & Company (Joint Venture) (UJC-M&C-JV) | Plot No. 39-B, Sindh Cooperative Housing Society, Main Airport Road, Sukkur, Pakistan Agriculture and Cooperatives Department Balochistan 2,763,126.94 2,763,126.94
EFAP-BI-CW-01: EFAP - Package 1: Repair and rehabilitation of 4 storages/dams/embankments and 9 flood protection subprojects in Hub and Lasbela Loan 4279 20 Mar 2024 M/s Noor Ul Haq & Brothers | Plot No. 130, Phase 1, Shahbaz Town, Samungli Road, Quetta, Balochistan, Pakistan Agriculture and Cooperatives Department Balochistan 6,801,591.37 6,801,591.37
Package-14: Rehabilitation and Improvement of Roads in District Dadu Loan 4279 28 Mar 2024 M/s Sardar Mohammad Ashraf D. Baluch (Pvt.) Ltd. | Bungalow No. D-133, KDA Scheme No. 5, Block No. 4, Clifton, Karachi Agriculture and Cooperatives Department Balochistan 18,489,976.90 16,293,427.25
Package-11: Rehabilitation and Improvement of Roads in District Jamshoro & Dadu Loan 4279 28 Mar 2024 M/s Umer Jan & Company - M/s NPI Construction & Engineering (Joint Venture) | Bungalow No. X-26, Street No. 19, Near NADRA Office, DHA, Phase-I, Karachi Agriculture and Cooperatives Department Balochistan 19,153,090.78 16,877,765.34
EFAP/KPID/CW-07: PACKAGE-07: REHABILITATION OF FLOOD PROTECTION WORKS/STRUCTURES MALAKAND IRRIGATION DIVISION Loan 4279 20 Mar 2024 M/s Muhammad Younas Builders (Pvt.) Limited | Office No 1-2, Ground Floor, Haji Younas Plaza, Tehsil Bara, Khyber District Agriculture and Cooperatives Department Balochistan 2,362,928.38 2,362,928.38
Package-14: Repair and Rehabilitation of Flood Protection Structures, District Swat - Swat Irrigation Division-I. Loan 4279 22 Feb 2024 M/s Zahir Khan and Brothers- Mulakhel Construction Company [SMC-Pvt.] Ltd. (Joint Venture) | House No. 890, Sector-C, Kanju Township, Kanju Swat, Khyber Pakhtunkhwa Agriculture and Cooperatives Department Balochistan 6,663,557.93 6,652,112.21
EFAP/KPID/CW-16: PACKAGE-16: REHABILITATION OF IRRIGATION SYSTEMS, DIR IRRIGATION DIVISION, DISTRICT DIR Loan 4279 02 Feb 2024 M/s M. Younas Builders (Pvt.) Limited | Office No. 1-2, Ground Floor, Haji Younas Plaza, Tehsil Bara, Khyber Pakhtunkhwa Agriculture and Cooperatives Department Balochistan 1,053,558.21 1,052,050.16
Incremental Administrative Cost - BID Loan 4279 29 Feb 2024 Various | Pakistan Agriculture and Cooperatives Department Balochistan 1,155,068.98 1,153,415.64
Package-13: Repair and Rehabilitation of Flood Protection Structures, District Swat - Swat Irrigation Division-II. Loan 4279 22 Feb 2024 M/s Zahir Khan and Brothers- Mulakhel Construction Company [SMC-Pvt.] Ltd. (Joint Venture) | House No. 890, Sector-C, Kanju Township, Kanju Swat, Khyber Pakhtunkhwa Agriculture and Cooperatives Department Balochistan 5,299,829.92 5,290,726.62
P12- Rehabilitation and Improvement of Roads in District Naushahro Feroze & Shaheed Benazirabad Loan 4279 15 Jan 2024 M/s SPGEC - M/s ZEPL (JV) | B97, Block 4/A, Gulshan-e-Iqbal, Karachi Agriculture and Cooperatives Department Balochistan 16,282,573.50 14,397,984.51
Incremental Administrative Cost - SWSD Loan 4279 31 Jan 2024 Various | Pakistan Agriculture and Cooperatives Department Balochistan 1,800,358.42 1,800,035.84
P5- Rehabilitation and Improvement of Roads in District Tando Allahyar Loan 4279 03 Jan 2024 M/s Niaz Muhammad Khan & Brother. | 213, DOHS, Phase II, Hyderabad Agriculture and Cooperatives Department Balochistan 5,471,366.46 4,861,389.00
P7- Rehabilitation and Improvement of Roads in District Sanghar & Mirpurkhas Loan 4279 11 Jan 2024 M/s Sachal Engineering Works (Pvt.) Ltd. | 59-E, Street No. 7, I-10/3, Islamabad Agriculture and Cooperatives Department Balochistan 9,561,791.20 8,473,175.88
P16- Rehabilitation and Improvement of Roads in District Larkana Loan 4279 30 Dec 2023 M/s Umer Jan & Company | X26, Street No. 19, DHA Phase I, Karachi Agriculture and Cooperatives Department Balochistan 12,216,937.43 10,812,065.64
P17- Rehabilitation and Improvement of Roads in District Kambar Shahdadkot Loan 4279 30 Dec 2023 M/s Umer Jan & Company - M/s NPI Construction & Engineering (JV) | 39B, Sindh Cooperative Housing Society, Sukkur Agriculture and Cooperatives Department Balochistan 14,446,374.59 12,785,131.41
P2- Rehabilitation and Improvement of Roads in District Badin Loan 4279 31 Dec 2023 M/s FB - MCPL (Joint Venture). | Fazal Heights, Qasimabad, Hyderabad Agriculture and Cooperatives Department Balochistan 14,606,683.55 12,927,005.83
P10- Rehabilitation and Improvement of Roads in District Jamshoro Loan 4279 30 Dec 2023 M/s Haji Syed Ameer & Brothers | Plot C, 5, Block 17, Gulshan-e-Iqbal, Karachi Agriculture and Cooperatives Department Balochistan 15,879,704.15 14,053,636.98
P6- Rehabilitation and Improvement of Roads in District Tando Muhammad Khan Loan 4279 30 Dec 2023 M/s Haji Syed Ameer & Brother | C5, Block 17, Gulshan e Iqbal, Karachi Agriculture and Cooperatives Department Balochistan 11,337,395.06 10,033,665.17
P18- Rehabilitation and Improvement of Roads in District Shikarpur & Kashmor @ Kandhkot Loan 4279 30 Dec 2023 M/s Sardar Mohammad Ashraf D. Baluch Pvt. Ltd. | D133, KDA Scheme No. 5, Block 4, Clifton, Karachi Agriculture and Cooperatives Department Balochistan 7,211,667.13 6,382,370.29
P1- Rehabilitation and Improvement of Roads in District Thatta Loan 4279 30 Dec 2023 M/s Sardar Mohammad Ashraf D. Baluch Pvt. Ltd. | D133, KDA Scheme No. 5, Block 4, Clifton, Karachi Agriculture and Cooperatives Department Balochistan 8,692,528.26 7,692,941.60
P8- Rehabilitation and Improvement of Roads in District Matiari & Hyderabad Loan 4279 31 Dec 2023 M/s NPI Construction & Engineering | 19-B, Railway Housing Society, Quetta Agriculture and Cooperatives Department Balochistan 8,719,109.55 7,716,466.56
P9- Rehabilitation and Improvement of Roads in District Shaheed Benazirabad Loan 4279 30 Dec 2023 M/s Abdul Ghaffar Memon | A49, State Life Cooperative Housing Society, Hyderabad Agriculture and Cooperatives Department Balochistan 9,617,790.77 8,511,804.68
P4- Rehabilitation and Improvement of Roads in District Umerkot & Sanghar Loan 4279 30 Dec 2023 M/s Umer Jan & Company | X-22, Street 19, DHA Phase I, Karachi Agriculture and Cooperatives Department Balochistan 10,166,355.49 8,997,287.87
P3- Rehabilitation and Improvement of Roads in District Umerkot & Mirpurkhas Loan 4279 29 Dec 2023 M/s Umer Jan & Company | X-26, Street 19, DHA Phase I, Karachi Agriculture and Cooperatives Department Balochistan 10,663,634.28 9,437,382.70
EFAP/KPID/CW-03: Package-3: Rehabilitation of Canals and Drains, District Di Khan - Paharpur Irrigation Division Loan 4279 26 Dec 2023 M/s Muhammad Younas Builders Pvt. Limited | Haji Younis Plaza, Bara Tehsil, Khyber District Agriculture and Cooperatives Department Balochistan 3,214,430.28 3,214,430.28
KPID CW-04 Lot 2: Reconstruction and Rehabilitation of 11 Canal / Distributaries Works in Dera Ismail Khan - CRBC Irrigation Division Loan 4279 26 Dec 2023 M/s Abdul Hakim Khan & Sons Pvt. Limited | Hakimabad, Nowshera Agriculture and Cooperatives Department Balochistan 3,844,837.28 3,844,837.28
P13- Rehabilitation and Improvement of Roads in District Shaheed Benazirabad Loan 4279 30 Dec 2023 M/s Sardar Mohammad Ashraf D. Baluch Pvt. Ltd. | D133, KDA Scheme No. 5, Block 4, Clifton, Karachi Agriculture and Cooperatives Department Balochistan 6,416,348.47 5,678,508.32
EFAP/KPID/CW-04: Package-4: Lot 1 Reconstruction and Rehabilitation of Canal / Distributaries Works in Dera Ismail Khan - CRBC Irrigation Division Loan 4279 26 Dec 2023 M/s Abdul Hakim Khan & Sons Pvt. Limited | Hakimabad, Nowshera Agriculture and Cooperatives Department Balochistan 3,205,632.86 3,205,632.86
Retroactive Financing/Advance contracting Loan 4279 23 Oct 2023 Multiple | Multiple contractors under 38 approved schemes under retroactive financing/advance contracting. Agriculture and Cooperatives Department Balochistan 2,827,358.22 2,801,054.41
Project Preparatory Technical Assistance Technical Assistance 10036 05 Sep 2023 CDM International Inc. (U.S.A.) | 75 State Street, Suite 701 Boston, MA 02109, United States National Highway Authority 650,000.00
Design Review and Construction Supervision Consultant - EFAP-NHA-Cons-01 Loan 4279 18 Sep 2023 National Engineering Services Pakistan (Pvt.) Ltd. | 1-C, Block N, Model Town Extension, Lahore 54700, Pakistan Agriculture and Cooperatives Dept. Balochistan 5,358,618.97 4,693,027.26
Project Management Consultants for Detailed Design, RAMS Upgrading and Construction Supervision - EFAP/WSD/PMC/01 Loan 4279 07 Jul 2023 M/s Engineering Consultant International (Private) Limited, Pakistan | 29, Block 7/8, Darul Aman Society, Sharae Faisal, Karachi Agriculture and Cooperatives Department Balochistan 5,163,858.63 4,367,524.08
EFAP-BA-CONS-01: Project Supervision and Monitoring (PSM) Consultant 4279 17 Jun 2023 M/s CAMEOS Consultants | Plot No 07, First Floor, Paris Arcade, MPCHS, Sector E11/3 Markaz, Islamabad Agriculture and Cooperatives Dept. Balochistan 988,374.48 988,374.48
EFAP-BI-CONS-01: Project Management Consultant (PMC) for Detailed Engineering Design and Construction Supervision Services (BID) 4279 05 Jun 2023 M/s CAMEOS Consultant in JV with M/s Rehman Habib Consultant Pvt. Ltd. | Plot No 07, First Floor, Paris Arcade, MPCHS, Sector E11/3 Markaz, Islamabad Agriculture and Cooperatives Dept. Balochistan 4,897,780.30 4,887,499.85
Consulting Services - KPID (Nespak) Loan 4279 26 Apr 2023 M/s National Engineering Services Pakistan Pvt Ltd. (NESPAK) Pakistan | Nespak House, Model Town Lahore Agriculture and Cooperatives Dept. Balochistan 3,935,674.57 3,870,870.96

Procurement Plan

Title Document Type Document Date
Emergency Flood Assistance Project: Procurement Plan Procurement Plans Dec 2023
Emergency Flood Assistance Project - Additional Financing: Procurement Plan Procurement Plans Nov 2022