The program will provide project financing for the rehabilitation of the track and structure of the Sumgayit-Yalama rail line, a key link in the North-South Railway Corridor within the Central Asia Regional Economic Cooperation (CAREC) network. It will improve rail network serviceability (the project loan); and support the railway sector development reforms in management autonomy and governance, financial restructuring, reporting and control, operational efficiency, and corporate restructuring (the policy-based loan).

The report and recommendation of the President to the Board of Directors (RRP) document describes the terms and conditions of a project for consideration and approval by ADB's Board of Directors. This document dated November 2017 is provided for the ADB project 48386-004 in Azerbaijan.

Linked Documents
  1. Program Loan Agreement
  2. Project Loan Agreement
  3. Project Agreement
  4. Sector Assessment (Summary): Rail Transport (Non-Urban)
  5. Project Administration Manual
  6. Project Administration Manual
  7. Contribution to the ADB Results Framework
  8. Development Coordination
  9. Attached Technical Assistance Report
  10. Financial Analysis
  11. Economic Analysis
  12. Country Economic Indicators
  13. International Monetary Fund Assessment Letter [Withheld from Disclosure per Para. 97 (iv) of PCP 2011]
  14. Summary Poverty Reduction and Social Strategy
  15. Initial Environmental Examination
  16. Resettlement Plan
  17. Risk Assessment and Risk Management Plan
  18. List of Ineligible Items
  19. Railway Sector Development Program Reform Outputs [Withheld from Disclosure per Para. 97 (v) of PCP 2011]
  20. Climate Risk Assessment and Management Report
  21. Environmental and Social Assessment of the Policy Matrix and Management Plan
  22. Financial Management Assessment Report [Withheld from Disclosure per Para. 97 (v) of PCP 2011]
  23. Financial (Fiscal) Impact Assessment of Railway Sector Reforms [Withheld from Disclosure per Para. 97 (v) of PCP 2011]