Coastal Towns Environmental Infrastructure Project: Construction of RC Bridge over Varani Khal and 2 RCC Box Culverts (Barguna) Initial Environmental Examination

Initial Environmental Examination | December 2016

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated December 2016 is provided for the ADB project 44212-013 in Bangladesh.