Dhaka Water Supply Network Improvement Project: ICB Package 2.12 (First Batch - DMAs 701A, 701B, 702, and 703) Initial Environmental Examination
Initial Environmental Examination
|
January 2022
Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.
This document dated January 2022 is provided for the ADB project 47254-003 in Bangladesh.