Dhaka Water Supply Network Improvement Project: NCB Package 2.11D (Lot 2) (DMAs 1001 and 1009) Initial Environmental Examination
Initial Environmental Examination
|
December 2023
SHARE THIS PAGE
Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.
This document dated December 2023 is provided for the ADB project 47254-003 in Bangladesh.