Dhaka Water Supply Network Improvement Project: NCB Package 2.12A (DMA's: 701A and 701B of ICB 2.12) Initial Environmental Examination

Initial Environmental Examination | December 2023
SHARE THIS PAGE

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated December 2023 is provided for the ADB project 47254-003 in Bangladesh.