Secondary Towns Urban Development Project: Report and Recommendation of the President
Reports and Recommendations of the President
|
May 2018
The project will improve water supply in three secondary towns of Samdrup Jongkhar, Sarpang, and Trashigang; improve sewerage in Samdrup Jongkhar; and develop drainage and road infrastructure in Sarpang’s new satellite town. The project will support the strengthening of institutional capacity for the management and operation and maintenance (O&M) of municipal infrastructure assets; and develop water tariff guidelines.
The report and recommendation of the President to the Board of Directors (RRP) document describes the terms and conditions of a project for consideration and approval by ADB's Board of Directors.
This document dated May 2018 is provided for the ADB project 42229-016 in Bhutan.
Linked Documents
- Loan Agreement
- Sector Assessment (Summary): Water and Other Urban Infrastructure and Services
- Project Administration Manual
- Contribution to the ADB Results Framework
- Development Coordination
- Financial Analysis
- Economic Analysis
- Country Economic Indicators
- Summary Poverty Reduction and Social Strategy
- Risk Assessment and Risk Management Plan
- Project Climate Risk Assessment and Management Reporting
- Gender Action Plan
- Initial Environmental Examination: Sarpang Water Supply Development Subproject
- Initial Environmental Examination: Sarpang Satellite Town Urban Roads and Drains Subproject
- Initial Environmental Examination: Trashigang Water Distribution Network Improvement Subproject
- Initial Environmental Examination: Samdrup Jongkhar Sewerage and Sanitation Subproject
- Initial Environmental Examination: Samdrup Jongkhar Water Supply System Improvement Subproject
- Initial Environmental Examination: Sarpang Satellite Town Water Supply Distribution Network Subproject
- Initial Environmental Examination: Dewathang (Samdrup Jongkhar) Water Supply Augmentation Subproject
- Initial Environmental Examination: Rangjung (Trashigang) Intake and Water Treatment Plant Rehabilitation Subproject
- Resettlement Plan: Sarpang
- Financial Management Assessment
- Project Procurement Risk Assessment Report
- Due Diligence Report: Trashigang
- Due Diligence Report: Sarpang
- Due Diligence Report: Samdrup Jongkhar
- Technical Appendix