National Solar Park Project: Initial Environmental Examination
Initial Environmental Examination
|
March 2019
Download(Free : 12 available)
- Main Report (4.67 MB)
- Annexure 1 - Environmental Management Plan (1 MB)
- Appendix I, Parts 1–3 (6.24 MB)
- Appendix II (2.12 MB)
- Appendix III, Parts 1-5 (2.94 MB)
- Appendix IV, Parts 1-5 (4.87 MB)
- Appendixes V-VI (3.44 MB)
- Appendix VII, Parts 1-3 (4.86 MB)
- Appendix VII, Part 4a-1 (5.8 MB)
- Appendix VII, Part 4a-2 (5.62 MB)
- Appendix VII, Part 4a-3 (4.03 MB)
- Appendix VII, Part 4b (1.17 MB)
Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.
This document dated March 2019 is provided for the ADB project 51182-001 in Cambodia.