Integrated Urban Environmental Management in the Tonle Sap Basin Project: Report and Recommendation of the President
Reports and Recommendations of the President | November 2015
The report and recommendation of the President (RRP) document describes the terms and conditions of a project for consideration and approval by ADB.
This document dated October 2015 is provided for the ADB project 42285-013 in Cambodia.
Linked Documents
- Loan Agreement: Special Operations
- Loan Agreement: ADB Strategic Climate Fund
- Grant Agreement: ADB Strategic Climate Fund
- Sector Assessment (Summary): Water and Other Urban Infrastructure and Services
- Project Administration Manual
- Contribution to the ADB Results Framework
- Development Coordination
- Financial Analysis
- Economic Analysis
- Country Economic Indicators
- Summary Poverty Reduction and Social Strategy
- Gender Action Plan
- Initial Environmental Examination: Kampong Chhnang
- Initial Environmental Examination: Pursat
- Environmental Assessment and Review Framework
- Resettlement Plan: Kampong Chhnang
- Resettlement Plan: Pursat
- Risk Assessment and Risk Management Plan
- Tonle Sap Urban Areas Development Framework
- Kampong Chhnang Urban Development Strategy
- Pursat Urban Development Strategy
- Poverty and Social Analysis
- Stakeholder Consultation and Participation Plan
- Climate Resilience Measures
- Technical Options
- Technical Feasibility for Kampong Chhnang Flood Protection
- Technical Feasibility for Pursat Drainage and Embankment
- Technical Feasibility for Kampong Chhnang Solid Waste Management
- Technical Feasibility for Pursat Solid Waste Management
- Complete Economic and Financial Analysis
- Urban Institutional Analysis