GMS Rehabilitation of the Railway in Cambodia: Major Change in Project

Change in Scope, Amount, and Implementation Arrangements | September 2014
SHARE THIS PAGE

This major change in project document dated September 2014 for the ADB projects 37269-013 and 37269-023 in Cambodia outlines the major changes to the projects' scope. The major changes are (i) reduction in track rehabilitation of the northern line by 318 kilometers against the original plan,(ii) cancellation of new freight and rolling stock maintenance facility at Samrong, (iii) exclusion of passing loops and a station in Poipet with facilities for border crossing, and (iv) exclusion of a rail link to a second dry port in Phnom Penh.