Green Energy Corridor and Grid Strengthening Project: ± 800 kv Raigarh-Pugalur HVDC Bipole Link Initial Environment Assessment Report
Initial Environmental Examination | May 2018
Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.
This document dated May 2018 is provided for the ADB project 44426-016 in India.