The high voltage transmission system included (i) the 400/200/66 transformer substation at Charanka Solar Park, (ii) eight 220/66 kilovolt (kV) 100 megavoltamperes (MVA) transformers, (iii) the 66 kV underground cable grid to collect power from the various solar farms in the park, (iv) the 400 kV double circuit high voltage transmission line from Charanka to Sankhari substation, (v) the 220 kV double circuit transmission line from Charanka to Jangral substation, and (vi) two new feeder bays at Sankhari and Jangral substations.

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated August 2019 is provided for the ADB project 44431-013 in India.