Visakhapatnam-Chennai Industrial Corridor Development Program - Project 1: 3 MW Power Grid Connected Floating Type Solar Pv Power on Meghadrigedda Reservoir Initial Environmental Examination

Initial Environmental Examination | October 2018
SHARE THIS PAGE

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated October 2018 is provided for the ADB project 48434-003 in India.