West Bengal Drinking Water Sector Improvement Project: Bulk Water Supply for Two Blocks in Bankura (Package DWW/BK/01) Updated Initial Environmental Examination

Initial Environmental Examination | November 2020

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated November 2020 is provided for the ADB project 49107-006 in India.