West Bengal Drinking Water Sector Improvement Project: Water Supply Distribution System Mejia and Gangajalghati Blocks, Bankura District (Package DWW/BK/04) Updated Initial Environmental Examination
Initial Environmental Examination
|
March 2020
Download(Free : 3 available)
Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.
This document dated March 2020 is provided for the ADB project 49107-006 in India.