ReNew Clean Energy Project: 100.8 MW Veerbhandra Wind Farm Project Initial Environmental Examination
Initial Environmental Examination | January 2018
Download (Free: 3 available)
Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.
This document dated January 2018 is provided for the ADB project 50195-001 in India.