Bengaluru Metro Rail Project: Environmental Impact Assessment
Environmental Impact Assessments | October 2020
Download (Free: 34 available)
- Phase 2A (Outer Road Ring Metro Line) Volume 1: Main Report (4.64 MB)
- Volume 2: Main Report (1.14 MB)
- Volume 3: Annexes 1-4 (255.07 KB)
- Volume 4: Annex 5 (2.78 MB)
- Volume 5: Annex 5 (229.74 KB)
- Volume 6: Annex 5 (2.73 MB)
- Volume 7: Annex 5 (4.11 MB)
- Volume 8: Annex 5 (4.14 MB)
- Volume 9: Annex 5 (4.43 MB)
- Volume 10: Annex 5 (2.5 MB)
- Volume 11: Annex 5 (2.89 MB)
- Volume 12: Annex 5 (4.1 MB)
- Volume 13: Annex 5 (4.08 MB)
- Volume 14: Annex 5 (4.77 MB)
- Volume 15: Annex 5 (3.37 MB)
- Volume 16: Annex 5 (4 MB)
- Volume 17: Annex 6 (1.04 MB)
- Volume 18: Annex 7 (375.09 KB)
- Phase 2B (Airport Metro Line) Volume 1: Main Report (4.64 MB)
- Volume 2: Annexes 1-4 (213.27 KB)
- Volume 3: Annex 5 (2.42 MB)
- Volume 4: Appendix 5 (230.1 KB)
- Volume 5: Annex 5 (2.74 MB)
- Volume 6: Annex 5 (4.5 MB)
- Volume 7: Annex 5 (4.49 MB)
- Volume 8: Annex 5 (4.8 MB)
- Volume 9: Annex 5 (4.17 MB)
- Volume 10: Annex 5 (4.11 MB)
- Volume 11: Annex 5 (4.67 MB)
- Volume 12: Annex 5 (4.2 MB)
- Volume 13: Annex 5 (3.43 MB)
- Volume 14: Annex 5 (4.02 MB)
- Volume 15: Annex 6 (1.01 MB)
- Volume 16: Annex 7 (367.77 KB)
Environmental Impact Assessments (EIA) provide information to decision makers and the public about the environmental implications of proposed actions for a project.
This document dated October 2020 is provided for the ADB project 53326-001 in India.