Madhya Pradesh Power Transmission and Distribution System Improvement Project
Initial Environmental Examination
|
September 2013
SHARE THIS PAGE
Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.
This document dated September 2013 is provided for the ADB project 47100-004 in India.