The report describes a loan to four special purpose vehicles owned and controlled by Equis Energy for the Eastern Indonesia Renewable Energy Project (Phase 2) in Indonesia. The report also describes (i) the proposed administration of a loan to be provided by the Leading Asia’s Private Infrastructure Fund;2 and (ii) the proposed administration of a loan to be provided by the Canadian Climate Fund for the Private Sector in Asia II. This transaction follows phase 1 of the project where ADB provided financing to Equis Energy for a 72-megawatt (MW) wind power plant.

The report and recommendation of the President to the Board of Directors (RRP) document describes the terms and conditions of a project for consideration and approval by ADB's Board of Directors.

This document dated March 2018 is provided for the ADB project 51209-002 in Indonesia.

Linked Documents

  1. Sector Overview
  2. Client Information [Withheld from Disclosure per Para. 97 (v, viii) of PCP 2011]
  3. Details of Implementation Arrangements [Withheld from Disclosure per Para. 97 (v, viii) of PCP 2011]
  4. Contribution to the ADB Results Framework
  5. Financial Analysis [Withheld from Disclosure per Para. 97 (v, viii) of PCP 2011]
  6. Economic Analysis [Withheld from Disclosure per Para. 97 (v, viii) of PCP 2011]
  7. Country Economic Indicators
  8. Summary Poverty Reduction and Social Strategy
  9. Safeguards and Social Dimensions Summary
  10. Integrity and Tax Due Diligence Disclosure [Withheld from Disclosure per Para. 97 (v, viii) of PCP 2011]