fbpx Geothermal Power Generation Project: Dieng Unit 2 Project Component Draft Initial Environmental Examination | Asian Development Bank

Geothermal Power Generation Project: Dieng Unit 2 Project Component Draft Initial Environmental Examination

Initial Environmental Examination | November 2019

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated November 2019 is provided for the ADB project 52282-001 in Indonesia.