West Kalimantan Power Grid Strengthening Project: 150 kV Tayan-Sanggau-Sekadau Transmission Line Initial Environmental Examination

Initial Environmental Examination | July 2016
SHARE THIS PAGE

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated July 2016 is provided for the ADB project 41074-013 in Indonesia.