fbpx CAREC Corridor 2 (Mangystau Oblast Section) Investment Program - Tranche 2: Zhetybai-Zhanaozen Road Section (Km 0-73) Initial Environmental Assessment (Final Version) | Asian Development Bank

CAREC Corridor 2 (Mangystau Oblast Section) Investment Program - Tranche 2: Zhetybai-Zhanaozen Road Section (Km 0-73) Initial Environmental Assessment (Final Version)

Initial Environmental Examination | May 2015

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated May 2015 is provided for the ADB project 43439-033 in Kazakhstan.