CAREC Corridors 1 and 3 Connector Road Project: Section Epkin [km 89] to Bashkugandy [km 159] Initial Environmental Examination

Initial Environmental Examination | November 2016
SHARE THIS PAGE

Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.

This document dated November 2016 is provided for the ADB project 48401-007 in the Kyrgyz Republic.