fbpx Second Issyk-Kul Sustainable Development Project: Project Preparatory Technical Assistance Report | Asian Development Bank

Second Issyk-Kul Sustainable Development Project: Project Preparatory Technical Assistance Report

Project Preparatory Technical Assistance Reports | September 2016

Project preparatory technical assistance reports are provided for small-scale technical assistance that identify, formulate, and prepare development projects.

This document dated September 2016 is provided for the ADB project 50176-001, 50176-002 in the Kyrgyz Republic.