Nam Ngiep 1 Hydropower Project
Environmental Impact Assessments
|
May 2014
SHARE THIS PAGE
Download(Free : 13 available)
- Main Report (46.53 MB)
- Appendix A: Baseline Biodiversity Assessment Report (41.3 MB)
- Appendix B: Biodiversity Offset Design Report (7.35 MB)
- Appendix C: Biodiversity Cumulative Impact Assessment (13.02 MB)
- Appendix D: Environmental Flow Assessment Report (12.32 MB)
- Appendix E: Environmental Assessment for Access Road (38.39 MB)
- Appendix F: IEE for 230kV Transmission Line (51.43 MB)
- Appendix G: Results of Soil Analysis, Water Quality Modelling Assumption and Results, and Public Consultation Results (5.71 MB)
- Appendix H: EMP Sub-plans and Appendix I: Applicable Standards (1.18 MB)
- Appendix K: Preliminary Archaeology and Cultural Heritage Survey Report (4.33 MB)
- Appendix J1: Houay Ngua PPA Communication Letters (13.86 MB)
- Appendix J2: The PPA's Site Management Guidelines (Conservation Action Plans) (52.31 MB)
- Appendix L: Emergency Response Procedure (484.24 KB)
Environmental impact assessments provide information to decision makers and the public about the environmental implications of proposed actions for a project.
This document dated May 2014 is provided for the ADB project 41924-014 in the Lao People's Democratic Republic.