Upper Trishuli-1 Hydropower Project: Report and Recommendation of the President

Reports and Recommendations of the President | March 2019

The loans will provide long-term financing to construct and operate a 216 megawatt (MW) run-of-river hydro power plant, 70 kilometers north of the main load center Kathmandu. The project will boost domestic power generation and help reduce imports of electricity into Nepal through the efficient use of indigenous renewable sources, contributing to Nepal’s long-term energy security, sufficiency and sustainability.

The report and recommendation of the President to the Board of Directors (RRP) document describes the terms and conditions of a project for consideration and approval by ADB's Board of Directors.

This document dated March 2019 is provided for the ADB project 49086-001 in Nepal.

Linked Documents
  1. Sector Overview [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [ii])]
  2. Client Information [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [ii])]
  3. Details of Implementation Arrangements [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [ii])]
  4. Contribution to the ADB Results Framework
  5. Financial Analysis [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [iv])]
  6. Economic Analysis [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [iv])]
  7. Country Economic Indicators
  8. Summary Poverty Reduction and Social Strategy [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [ii])]
  9. Safeguards and Social Dimensions [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [ii])]
  10. Environmental and Social Impact Assessment
  11. Indigenous Peoples Plan
  12. Land Acquisition and Livelihood Restoration Plan
  13. Gender Action Plan [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [ii])]
  14. Confidential information deleted [Withheld from Public Disclosure in accordance with the Access to Information Policy (para. 17 [vi])]
Project Number 
 
Countries 
 
Subjects