Electricity Transmission Expansion and Supply Improvement Project: Tamakoshi-Kathmandu 400 kV Transmission Line Initial Environmental Examination
Initial Environmental Examination
|
April 2016
Download(Free : 12 available)
- Volume 1 Main Report - Chapter 1 (6.06 MB)
- Volume 1 Main Report - Chapter 3-4 (2.69 MB)
- Volume 1 Main Report - Chapter 5 (6.11 MB)
- Volume 1 Main Report - Chapter 6 (3.45 MB)
- Volume 1 Main Report - Chapter 7-10 (5.51 MB)
- Volume 2 Appendices - Appendix A (2.84 MB)
- Volume 2 Appendices - Appendices B-E (8.92 MB)
- Volume 2 Appendices - Appendix F (1.46 MB)
- Volume 2 Appendices - Appendix G (Part 1 of 2) (7.37 MB)
- Volume 2 Appendices - Appendix G (Part 2 of 2) (7.37 MB)
- Volume 2 Appendices - Appendix H (Chapter 1-4) (8.81 MB)
- Volume 2 Appendices - Appendix H (Chapter 5-11) (8.04 MB)
Initial Environmental Examinations (IEE) describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements for environmental monitoring.
This document dated April 2016 is provided for the ADB project 41155-013 in Nepal.