Jamshoro Power Generation Project: Environmental Monitoring Report (July-December 2020)
Environmental Monitoring Reports | June 2021
Download (Free: 10 available)
- Volume A – Main Report with Annexes A and B (1.16 MB)
- Volume B – Annex C (1.96 MB)
- Volume C – Annex D (July 2020 Report) (3.48 MB)
- Volume D – Annex D (August 2020 Report) (4.17 MB)
- Volume E – Annex D (September 2020 Report) (4.52 MB)
- Volume F – Annex D (October 2020 Report) (3.73 MB)
- Volume G – Annex D (November 2020 Report) (5.06 MB)
- Volume H – Annex D (December 2020 Report) (5.41 MB)
- Volume I – Annex E (286.81 KB)
- Volume J – Annex F (302.65 KB)
Environmental monitoring reports describe the environmental issues or mitigation measures of a project.
This document dated June 2021 is provided for the ADB project 47094-001 in Pakistan.