Peshawar Sustainable Bus Rapid Transit Corridor Project: Project Preparatory Technical Assistance
Project Preparatory Technical Assistance Reports
|
December 2014
SHARE THIS PAGE
Project preparatory technical assistance reports are provided for small-scale technical assistance that identify, formulate, and prepare development projects.
This document dated December 2014 is provided for the ADB project 48289-001 in Pakistan.